HomeMy WebLinkAboutCC-01-19-99-01 Hazel Dell PaymtResolution No. CC-01-19-99-01 A RESOLUTION OF THE COMMON COUNCIL OF THE CITY OF CARMEL, INDIANA APPROVING PAYMENT OF CONSTRUCTION COSTS FOR HAZEL DELL PARKWAY WHEREAS, pursuant to Article 1~, Section 3.01 (b) of the Trust Indenture by and among the City of Cannel Redevelopmerit Authority and Fifth Third Bank of Central Indiana, dated as of August 1, 1997, approval by the Common Council is required prior to payments from the Construction Fund therein described upon presentation of architect' s or engineer' s certificates of work completed and materials furnished; WHEREAS, American Consulting Engineers, Inc., has presented such certificates regarding the Construction Project Invoices attached hereto as Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Carmel, Indiana, that the Construction Project Invoices attached hereto as Exhibit A are hereby approved for payment from the Construction Fund described in the above- referenced Trust Indenture. PASSED by the Common Council of the City of Carmel, Indiana this/~ of~~_~f ,1999, by a vote of 6~ ayes and ~ nays. day P s~ 0 Robert Battreat, President James Guy Miller bi.L. Rundl!/'~ /"Ronald E. Carter · B~ / e~~ B' er Diana L. Cordray, Clerk-Treasurer Presented by me to the Mayor of the City of Cannel, Indiana the/q '~ day of }v~ca~ ,1999. Diana L. Cordray, Clerk- Approved by me, Mayor of the City of Carmel, Indiana, this / >~ day of xT'~v'u~t g V ,1999. nard, Mayor ATTEST: Diana L. Cordray, Clerk-Treasur~ EXHIBIT A PAYMENT REQUISITION NO. 38 PAYEE CHARACTER OF EXPENDITURE , Milestone Coreractors LP P.O. Box 421450 5950 S. Belmont Ave. Indianapolis, IN 46242-1459 Sundown Gardens 13400 Old Meridian St. Cannel, IN 46032 $44,322.29 $118,703.21 Construction costs in connection with Hazel Dell Parkway. Landscaping costs in connection with Hazel Dell Parkway. 12/30/98 AMERICAN CONSULTING ENGII~ ,EKS, INC. ARCHITECTS ENGINEERS 4165 MILLERSVILLE ROAD INDIANAPOLIS, INDIANA 46205-2998 317,547.5580 FAX 317.543-0270 TELECOPIER COVER LETTER Please deliver the following pages immediately to: ~o~o~: ~/r Y ~ ~ From: Date: A.C.E. Project No.: Fox number coiled: Total number of pages, including cover letter: Telecopier operator for this transmission: IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL US BACK AS SOON AS POSSIBLE, USING THE TELEPHONE NUMBER LISTED ABOVE. CONSTRUCTION PROJECT INVOICE Dat~.' I ~I 8/98 Nams of Company: Address & Zip: T~shsphon.s No.: Fax No.: Milestone Contractors LP Milestone Contractors LP P.O. Box 42 1450 5950 S. Belmont Ave. Indianapolis, IN 46242-1459 (3 x 7)- 7ss- x 040 (3 x 7)- vss- x ogs Project Name: Hazel Dell ParBvay hxvoice No.: 022 Consm~ction pay items as I~r PROGRESS ESTIMATE #022 as show~ on the attache~ invoi~ dated 12/18/98. Submitted by ~nericmx Consulthxg Engineers, Inc. Project Represent~fiv/~e~ Print Name Pro. i~ct Name: HAZEL DELL PARKWAY Proj~ctNo.: 97-02 Invoice No,; 022 Perrod: 12/1/98 Thru 12/15/98 ROAD ................................................................. $ STRUCTURE NO. ! STRUCTURE NO. 2 8TRUCTLrP,.E NO. 3 (Blue Woods Creek BridSe) ............................ (Cool Creek BridSe) ................................... (~{mmensr Dram) .................................... BILLING THIS ESTIMATE $ LESS RETAINAGE PROGRESS ESTIMATE DUE THIS ESTIMATE $ Fags I of ~ 49;46.99 0.00 0.00 0.00 49;46.99 4.924.70 44,322,29 DATE: 12/17/9B CITY OF CARMEL CONTRACT: -97525 PROGRESS ESTIMATE ESTIMATE: 022 PROJECT: ROAO PERIOD: IZ/OI/gB THRU IZ/I5/gB CONTRACTOR PO NO.: MILESTONE CONTRACTORS, L.P. LETTING: B/06/97 Page DAN GRESKAMP AMERICAN CONSULTING ENGINEERS, INC, 4165 NILLERSVILLE RD, INDPLS,, IN ITEM ITEMS OF CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION 0004 T.E.S.C,, PERIMETER PROTECTION -ZZ6.0000 LFT 1.65000 {37Z,903 0006 T,E,S.C., STRAW BALE DITCH CHECK ,90,0000 LFT Z.]ZO00 (20B,BO) 0007 T,E,S,C,, CULVERT PIPE PROTECTION 5,0000 EACH 67.09000 335,45 0008 T.E,S,C,, DROP INLET PROTECTION Z,O000 EACH 67,09000 134,18 0009 T.E,S,C., CURB INLET PROTECTION 5,0000 EACH 30,96000 154,60 0010 B BORROW 86.8300 CYS 16.00000 1,JBg,Z8 0012 COMP, AGG, FOR BASE, O, SIZE NO, 53 104,5000 TON 13.01000 1,359,55 0018 BITUMINOUS BINDER 8, MV 480,7300 TON 21.12000 10,I53,0Z OOZ3 BITUMINOUS MATERIAL FOR TACK COAT ,5000 TON 142,05000 71,03 0031 BITUMINOUS MIX, FOR APPROACHES, MV 76,5800 TON 34,25000 Z,6ZZ,B7 O03Z CEMENT CONC, PAVE, FOR DRIVE., 6IN, 140,1000 SYS ~4,B7000 3,484,~9 0034 GEOTEXTILES 3Z.O000 SYS Z,09000 66,BB 0035 RIPRAP 20,9300 TON 19,B7000 415,BB 0037 MOBILIZATION AND DEMOB, FOR SEEDING 4,0000 EACH 541,8B000 2,167,52 0052 PIPE, RENF, CONC., CLASS III, 4BIN, iZ,O000 LFT 67,33000 B07.96 0055 PIPE, REINFORCED CONCRETE, 12 IN, ,0000 LFT 19,74000 0.00 O05B CONCRETE, A, STRUCTURES 2,5000 CYS 399,58000 99B,95 0060 PIPE END SECTION, 12 IN, -3,0000 EACH 167,26000 (501,7B) 0061 PIPE END SECTION, 15 IN. 1,0000 EACH 186,60000 186,60 0062 PIPE END SECTION, 18 IN. 1,0000 EACH 204,75000 204,75 0071 CASTING, ADJUST TO GRADE 3.0000 EACH 241.I3000 723,39 0072 MANHOLE, ADJUST TO GRADE 1,0000 LFT 264,56000 264,56 OOBO CATCH BASIN, E7 1,0000 EACH 692,29000 692,29 0084 MANHOLE, L4 1,0000 EACH 2,764,86000 2,764,86 DATE: 12/17/98 CITY OF CARMEL CONTRACT: -97525 PROGRESS ESTIMATE ESTIMATE: 022 PROJECT: ROAD PERIOD: I2/01/98 THRU t2/15/96 CONTRACTOR PO NO.: MILESTONE CONTRACTORS, L.P. LETTING: B/06/97 Page 2 DAN GRESKAMP AMERICAN CONSULTING ENGINEERS, INC. 4165 MILLERSVILLE RD. INDPLS., IN ITEM ITEMS OF CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION 0093 TEMPORARY PAVEMENT MARKING, 316.0000 LFT 1.03000 325.48 I, YELLOW, 4 IN. 0094 TEMPORARY PAVEMETN MARKING, 810.0000 LFT 1.03000 834.30 I, WHITE, 4 IN. 0095 SIGN, SHEET, ENCLOSED LENS 8.0000 SFT 1.0tO00 B.O6 WITH LEGEND (O.OBO IN. THICKNESS) 0097 SIGN, SHEET, ENCAPSULATED LENS 27.0000 SFT I7.21000 464.67 WITH LEGEND (0.I00 IN. THICKNESS 0098 SIGN POST, A 136.5000 LFT 5.67000 773.96 0224 WASTE EXCESS COMMON EXCAVATION 390.0000 CYS 6.25000 2,437,50 0236 CONTROLLER & CABINET, B PHASE, TS2 1,0000 EACH 12,165.73000 12,I65.73 0255 6' PVC IRRIGATION SLEEVES 372.0000 LFT II.62000 4,322.64 DATE: 12/17/98 CITY OF CARMEL CONTRACT: -97525 PROGRESS ESTIMATE ESTIMATE: 022 PROJECT: ROAD PERIOD: I2/0I/9B THRU 12/15/96 CONTRACTOR PO NO,: MILESTONE CONTRACTORS, L,P, LETTING: B/06/97 Page 3 DAN GRESKAMP AMERICAN CONSULTING ENGINEERS, INC. 4Z65 MILLERSVILLE RD. INDPLS., IN ITEM ITEMS OF CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION 49,246.99 LIQUIDATED DAMAGES OTHER DEDUCTIONS PURSUANT TO THE PROVISION AND PENALTIES OF IC 197I 5-ii-i0 I HEREBY CERTIFY THAT THE FOREGOING ACCOUNT IS JUST ANO CORRECT, THAT THE AMOUNT CLAIMED IS LEGALLY DUE, AFTER ALLOWING ALL JUST CREDITS, AND THAT NO PART OF THE SAME HAS BEEN PAID, CONTRACTOR DATE PER PLANS, SPECIFICATIONS, AND/OR SPECIAL PROVISIONS, THE FOLLOWING CONDITIONS APPLY ON THIS ESTIMATE. ERECTION OF BARRICADES YES NO ERECTION OF DETOUR SIGNS YES NO , CURING OF CONCRETE YES NO , MAINTENANCE OF I:JMPORARY RUNAROUNDS YES NO , PREPARATi~N OF PAYROLLS YES NO , BASED ON FOREGOING CONDITIONS THIS ESTIMATE (SHOULD)d~HOULD NOT~BE DELAYED. DATE DISTRICT DATE OPERATIONS SUPPORT DATE AM]~ .LICAN CONSULTING ENGIN~'ERS, INC. ARCH ITECTS ENGINEERS 4165 MILLERSVlLLE ROAD INDIANAPOLIS, INDIANA 46205-2998 317.547-5580 FAX 317.543-0270 TELECOPIER COVER LETTER Please deliver the following pages immediately to: From: Date: A.C.E. Project No.: Fax number called: Total number of pages, including cover letter: ~e Telecopier operator for this transmission: IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL US BACK AS SOON AS POSSIBLE, USING THE TELEPHONE NUMBER LISTED ABOVE. CONSTRUCTION PROJECT INVOICE Dat~: lo,2/18/98 .Vam_~ of Company: Address & Zip: Sundown Ga~deus Suudowu Gardens, Inc. 1 ~400 Old Merdiau St. Cuel, IN 46032 Tel,~phon, No.: (317) - 846-0620 Project Name: Hazel Dell Parkway Landscaping Invoice No.: 008 Construction pay items as per PROGRESS ESTI~TE #008 as shown on the attached invoice dated 12/18/98. Submitted by American Consulting Engineers, Inc. Resident Project Representative Print Name ProjectName: I-t.AT]~.I- DELL PARKWAY LANDSCAPING Proy~ctNo.: 97-08 Invo~c~ No.: 008 PeFiod: 11/16/98 Thru 12/15/98 LANDSCAPE .............................................................. $ 13 1,892.46 BII. t.ING THIS ESTIMATE LE88 RETAINAGE PROGRESS ESTIMATE DUE THIg EgTIMATE 131,892.46 13,18925 118,703.21 DATE:, 12/I8/98 CITY OF CARMEL CONTRACT: -97526 PROGRESS ESTIMATE ESTIMATE: ~B PROJECT: LANDSCAPE PERIOD: ii/i6/98 THRU I2/15/98 CONTRACTOR PO NO.: SUNDOWN GARDENS LETTING: 12/17/97 Pa, DAN GRESKAMP AMERICAN CONSULTING ENGINEERS, INC. 4155 MILLERSVILLE RD. INDPLS., IN ITEM ITEMS OF CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION ~1 PINUS NISRA 38.~ EACH 14B.28~ 5,634.64 ~2 PICEA ABIES 25.~ EACH 15~.9T~ 3,714.25 ~5 GINKGO BILOBA 44.~0~ EACH 399.gg~ 17,599.55 ~5 TAXODIUM OISTICHUM 2].~8 EACH 385.B]~ B,B74.~9 ~7 FRAXINUS AMERICANA 12.~ EACH 346.21~ 4,154.52 'MARSHALLS SEEDLESS' ~9 FRAXINUS AMERICANA 6.8~ EACH 363.iB~8l} 2,ITg.~B 'AUTUMN APPLAUSE' ~ii ACER SACCHARUM 'GREEN MOUNTAIN' 26.~ EACH 374.51~0~ 9,73T.26 ~12 ACER RUBRUM 'FRANKSRED' 33.~ EACH 349.~5~;} 11,159.92 ~13 ACER RUBRUM 'FRANKSRED' 4' CAL. 34.0~0~ EACH ~i5 GLEDITSIA TRIACANTHOS INERMIS 29,~0~ EACH 349.~6~ I9,i22.74 'SKYCOLE' ~16 GLEDITSIA TRIACANTHOS INERMIS 4.~ EACH 734.4~ 2,BgT.60 'SKYCOLE ' 4' ~019 ACER CAMPSTRE 5.~ EACH 261.32~ 1,3~6.6~ ~2~ ACER X FREEMANII 'CELZAM' 4~.~ EACH 292.46~ II,69B.4~ ~23 AMELANCHIER X SRANDI. i2.~ EACH 3~6.59~ ],6Tg.~B 'AUTUMN BRILLIANCE' ~24 MAL~S 'PRAIRIFIRE' 6.~ EACH 289.51~.~ 1,737.56 ~26 VIBURNUM PRUNIFOLIUM 35.0~ EACH TB.83~ 2,837.52 ~31 JUNIPERUS SABINA 'BUFFALO' 9B.~O~ EACH 4T.57~ 4,671.66 ~032 JUNIPERUS CHINENSIS 'SEA GREEN' 54.~ EACH 4T.ST~ 2,ST4.1B 0~33 MISCANTHUS SINENSIS 'VARIEGATUS' 2B.g~ EACH 3~.55~ B55.4~ ~34 RUDBECKIA FULSIDA SPECIOSA 12~.~0~ EACH 2~.7g~ 2,494.B~ 'SOLDSTREAM' '2 o,e' S DATE: I2/18/98 CITY OF CARMEL CONTRACT: -g7526 PROGRESS ESTIMATE ESTIMATE: PROJECT: LANDSCAPE PERIOD: 11/16/9B THRU ig/lS/gB CONTRACTOR PO NO.: SUNDOWN GARDENS LETTING: 12/17/gT ITEM ITEMS OF CONTRACT DAN GRESKAMP AMERICAN CONSULTING ENGINEERS, INC. 4165 MILLERSVILLE RD. INDPLS., IN QUANTITY UNIT UNIT PRICE EXTENSION 131,892.46 LIQUIDATED DAMAGES OTHER DEDUCTIONS PURSUANT TO THE PROVISION AND PENALTIES OF IC 1911 5-11-I;) I HEREBY CERTIFY THAT THE FOREGOING ACCOUNT IS JUST AND CORRECT, THAT THE AMOUNT CLAIMED IS LEGALLY DUE, AFTER ALLOWING ALL JUST CREDITS, AND THAT NO PART OF THE SAME HAS BEEN PAID. PER PLANS, SPECIFICATIONS, AND/OR SPECIAL PROVISIONS, THE FOLLOWING CONDITIONS APPLY ON THIS ESTIMATE. ERECTION OF BARRICADES YES NO , ERECTION OF DETOUR SIGXS YES NO , CURING OF CONCRETE YES NO , MAINTENANCE OF TEMPORARY RUNAROUNDS YES NO , PREPARATION OF PAYROLLS YES NO , BASED ON FOREGOING CONOITIONS THIS ESTIMATE (SHOUL~){SHdULD NOT)BE DELAYED. PROJECT ENGINEER '~ DATE DISTRICT DATE OPERATIONS SUPPORT DATE /:'aye S