Loading...
HomeMy WebLinkAboutCC-09-14-98-02 Hazel Dell PaymtResolution No. CC-09-14-98-02 A RESOLUTION OF THE COMMON COUNCIL OF THE CITY OF CARMEL, INDIANA APPROVING PAYMENT OF CONSTRUCTION COSTS FOR HAZEL DELL PARKWAY WHEREAS, pursuant to Article III, Section 3.01 (b) of the Trust Indenture by and among the City of Carmel Redevelopment Authority and Fifth Third Bank of Central Indiana, dated as of August 1, 1997, approval by the Common Council is required prior to payments from the Construction Fund therein described upon presentation of architect' s or engineer' s certificates of work completed and materials furnished; WHEREAS, American Consulting Engineers, Inc., has presented such certificates regarding the Construction Project Invoices attached hereto as Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Carmel, Indiana, that the Construction Project Invoices attached hereto as Exhibit A are hereby approved for payment from the Construction Fund described in the above- referenced Trust Indenture. PASSED by the Common Council of the City of Carmel, Indiana this of ~V)/--c~,,-6w¢~,-~, 1998, by a vote of /e ayes and p> nays. day COMMON COUNCIL OF THE CITY OF CARMEL, INDIANA pr n: "bfncer ( Y NL~Rur'dl~Mi ~ ~ Robert Battreal, President Kevin Kirby .~_L': ~1 Snyder / Bi y ~W er Presented by me to the Mayor of the City of Carreel, Indiana the ,257/¢ day of _~-eflfl~-~fl/-v-~ ,1998. Diana L. Cordray, rer /7/Z day of Approved by me, Mayor of the City of Carmel, Indiana, this ,/Xc/9,4:tT,,~ i~,.7,~ 1998. Br~/ ATTEST: Diana L. Cordray,~ EXHIBIT A PAYMENT REQUISITION NO. 24 PAYEE CHARACTER OF EXPENDITURE Milestone Contractors P.O. Box 421450 5950 S. Belmont Ave. Indianapolis, IN 46242-1459 $204,815.45 Construction costs in connection with Hazel Dell Parkway. 08/28/98 ~ "."'i~:: AMER.. ,?,AN CONSULTING ENGINEE S, INC. ~' ~i~ ARCHITECTS ENGINEERS  4165 MILLERSVILLE ROAD INDIANAPOLIS, INDIANA 46205-2998 ~ ........... !i 317-547-5580 FAX 317-543-0270 LETTER OF TRANSMITTAL A.C.E. Project No.: We are r"q Enclosed sending you: O Separately Deliver by: Time: Date: via I"lMaiI D Messenger r"3As Requested r~For Your Information :]For Your Review & Comment TYPE DESCRIPTION Remarks: Copies of: Trans. Enclosure To: Please Return E:] Copies to this Office Very truly yours, American Consulting Engineers, Inc. CONSTRUCTION PROJECT INVOICE Date: 8/21/98 Name of Company: Milestone Contractors LP Address & Zip: Mil~ston~ Contractors LP P.O. Box 421450 5950 S. Belmont Ave. Indianapolis, IN 46242-1459 Telephone No.: (317) - 788 - 1040 Fax No.: (317) - 788 - 1098 Project Name: Hazel DcH Parkway Invoice No.: 015 Construction pay items as per PROGRESS ESTIMA1E #015 as shown on the attached invoice dated 8/21/98. Submitted by American Consulting Engineers, Inc. esident Project Kep/esentativ~ Print Name Project Name: HAZEL DELL PARKWAY Project No.: 97-02 Invoi~s No.: 0 15 Period: 8/1/98 Thin 8/15/98 ROAD ................................................................. $ STRUCTURE NO. 1 STRUCTURE NO. 2 STRUCIURE NO. 3 (Blue Woods Cr~k Bridge) ............................ (Cool Creek Bridge) ................................... (Mitchener Ditch) .................................... BILLING THIS ESTIMATE $ LESS RETAINAGE PROGRESS ESTIMATE DUE THIS ESTIMATE $ V,,ge S of 236,729.52 0.00 -$9,156.80 0.00 227,572.72 22,757.27 204,815.45 DATE: 8/21/98 CONTRACT: -97525 ESTIMATE: 015 PROJECT: ROAD PERIOD: 8/01/98 PO NO.: LETTING: 8/06/97 THRU 8/15/98 CITY OF CANNEL PROGRESS ESTIMATE CONTRACTOR MILESTONE CONTRACTORS, L.P. Page 1 DAN GRESKANP AMERICAN CONSULTING ENGINEERS, INC. 4165 MILLERSVILLE RD. INDPLS., IN ITEM ITEMS OF CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION 0002 EXCAVATION, COMMON 1,395.0000 CYS 3.25000 4,533.75 0010 B BORROW 143.3200 CYS 16.00000 2,293.12 0020 BITUMINOUS SURFACE 11, LV 641.7400 TON 31.00000 19,893.94 0021 BITUMINOUS SURFACE 11, MV 38.3500 TON 31.24000 1,198.05 0023 BITUMINOUS MATERIAL FOR TACK COAT 6.0600 TON 142.05000 860.82 0024 GUARDRAiL, W BEAM, 6FT.31N. SPACING 650.0000 LFT 10.72000 6,974.50 0025 GUARDRAiL END TREATMENT, 1 2.0000 EACH 619.30000 1,238.60 0026 CURB RAMP, CONCRETE 56.7000 SYS 18.58000 1,053.49 0031 BITUMINOUS MIX. FOR APPROACHES, MV .0100 TON 34.25000 .34 0055 PIPE, REINFORCED CONCRETE, 12 IN. 429.4000 LFT 19.74000 8,476.36 0060 PIPE END SECTION, 12 IN. 4~0000 EACH 167.26000 669.04 0072 MANHOLE, ADJUST TO GRADE 1.8300 LFT 264.56000 484.14 ""' 0073 INLET, E7 t.0000 EACH 652.64000 652.64 0075 INLET, jlO 1.0000 EACH 850.89000 850.89 0081 CATCH BASIN, KIO 3.0000 EACH 945.20000 2,835.60 0082 MANHOLE, C4 1.0000 EACH 1,079.15000 1,079.15 0092 CONSTRUCTION SIGN, A I0.00OO EACH 278.68000 2,786.80 0103 CONDUIT, STEEL, GALVANIZED, 2 IN. -1,080.5000 LFT 12.17000 (13,149.69) 0105 TRAFFIC SIGNAL HEAD, 3 FACE, 4.0000 EACH 376.94000 1,507.76 12 iN. RED, AMBER, GREEN 0106 PEDESTRIAN PUSH BUTTON Ai{D SIGN 10.0OOO EACH 130.23OOO 1,302.30 O109 SIGNAL CABLE, 3C 8GA. 61.0000 LFT 2.51000 153.11 0111 SIGNAL CABLE, 5C 14GA. 2,032.0000 LFT 2.06000 4,185.92 0112 SIGNAL CABLE, 11C 14GA. 878.0000 LFT 2.83000 2,484.74 DATE: 8/21/98 CONTRACT: -97525 ESTIMATE: PROJECT: ROAD PERIOD: 8/01/98 PO NO.: LETTING: 8/06/97 THRU 8/~5/~8 CITY OF CANNEL PROGRESS ESTIMATE CONTRACTOR MILESTONE CONTRACTORS, L.P. Page 2 DAN GRESKANP AMERICAN CONSULTING ENGINEERS, INC. 4165 MILLERSVILLE RD. INDPLS., IN ITEM ITEMS OF CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION 0134 LINE, PAINT, SOLID, WHITE, 4 IN. 29.0000 LET .05000 1.45 0136 TRANSVERSE MARKINGS, THEIi/(OPLASTIC, 91.0000 LET 3.10000 282.10 STOP LINE, 24 IN. N 0227 30 FT MAST ARM FOR VIDEO ON STEEL IO.0000 E 1,637.50000 16,375.00 STRAIN POLE 0228 VIDEO DETECTION SYSTEM 1.0000 E 47,016.33000 47,016.33 0229 COAX CABLE FOR VIDEO 1,589.0000 L 2.52000 4,004.28 0230 SIGNAL CABLE,3C I{GA. 1,709.0000 L 1.96000 3,349.64 0231 65' MAST ARM SIGNAL POLE. l.O000 E 8,575.78000 8,575.78 .~ 0232 SIGNAL CABLE, 7C 14GA 599.0000 L 3.03000 1,814.97 " 0233 OVERSIZED STREET ~'~'{.~ SIGNS 8.0000 E ~8.81000 390.48 ii &l .A. X , , (MID MAST MOUNT). N 0238 PEDESTRIAN SIGNAL HEAD lO.O000 E 453.46000 4,534.60 N 0239 SIGNAL. MID MAST MOUNTING ASSEMBLY 12.0000 E 69.61000 835.32 0242 CONCRETE EXCAVATION 4,420.3600 CYS 9.75000 ~.3,098.51 }; 0243 CONCRETE COLLAR FOR FORCE MAIN 1.0000 LSUM 267.00000 267.00 N 02 ~8 TREE REMOVAL 18.0000 EACH I00.00000 l, 800. OO 02~9 MASONRY COATING DEDUCTIONS -.3400 LSUM 3,050.00000 (1,037.00) N 0250 12' SAWCUTTING 412.0000 LFT 1.58000 650.96 0253 'A' FOUNDATIONS 2.0000 EACH {79.08000 958.16 " 025{ 7' PEDESTALS FOR SiGI{ALS 2.0000 EACH 382.29000 764.58 0255 6' PVC iRRIGATIOIi SLEEVES 1,0~9.2000 LFT 11.62000 12,191.70 DATE: 8/21/98 CONTRACT: -97525 ESTIMATE: PROJECT: ROAD PERIOD: 8/01/98 PO NO.: LETTING: 8/06/97 THRU 811SI98 CITY OF CANNEL PROGRESS ESTIMATE CONTRACTOR MILESTONE CONTRACTORS, L.P. Page 3 DAN GRESKANP AMERICAN CONSULTING ENGINEERS, INC. ¢16B MILLERSVILLE RD. INDPLS., IN ITEM ITEMS OF CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION 236,729.52 LIQUIDATED DAMAGES OTHER DEDUCTIONS PURSUANT TO THE PROVISION AND PENALTIES OF IC 1971 5-11-10 I HEREBY CERTIFY THAT THE FOREGOING ACCOUNT IS JUST AND CORRECT, THAT THE AMOUNT CLAIMED IS LEGALLY DUE, AFTER ALLOWING ALL JUST CREDITS, AND THAT NO PART OF THE SAME HAS BEEN PAID. Q___, a CONTRACTOR DATE PER PL~S, SPECIFICATIONS, ~U/OR SPECIAL PROVISIONS, THE FOLLOWING CONDITIONS APPLY ON THIS ESTIMATE. ERECTION OF BARRICADES YES NO , ERECTION OF DETOUR SIGNS YES NO , CURING OF CONCRETE YES NO , MAINTENanCE OF TEMPORARY RUNAROUNDS YES NO , PREPARATION OF PAYROLLS YES NO , BASES ON FOREGOING CONDITIONS THIS ESTIMATE (SHOULD) {bHO~LD'NOT])BE DELAYED. DATE DISTRICT DATE OPERATIONS SUPPORT DATE DATE: 8/21/98 CITY OE CARMEL CONTRACT: -97525 PROGRESS ESTIMATE ESTIMATE: PROJECT: STRUCTURE 2 PERIOD: 8/01/98 THRU 8/15/98 CONTRACTOR PO NO.: MILESTONE CONTRACTORS, L.P. LETTING: 8/06/97 Pa~e DAM GEESKiP AAMERICAM CONSULTING ENGINEERS, INC. ¢16S MILLERSVILLE INDPLS., IN ITEM ITEMS OF CONTRACT QUAMTITY UNIT UNIT PRICE EXTENSION O169 EXCAVATION, WATERWAY -1,863.00OO CYS 5.00000 (9,315.00) 0170 EXCAVATION, FOUNDATION, -.8000 CYS 30.00000 (24.001 UNCLASSiFIED 0171 B BORROW EOR STRUCTURE BACKEILL -9.3000 CYS 30.00000 (279.00) 0172 COMPACTED AGGREGATE FOR BASE, O, -5.2000 TON 20.00000 (10{.00) SIZE NO. 53 0175 GEOTEXTILES -80.0000 SYS 2.50000 (200.00) 0183 CONCRETE, C, IN SUPERSTRUCTURE 1.2000 CYS 375.00000 ~50.00 0185 CONCRETE, C, RAILING 1.2000 LET 130.00000 156.00 0i89 PIPE, UNDERDRAIN, CORRUGATED ¢1.0000 LET {.00000 16LO0 PLASTIC, PEREORATED, 6 IN. OBOS COLORED AMD PATTERNED CONCRETE -.2000 SYS 24.00000 (4.80) DATE: 8/21/98 CITY OF CANNEL CONTRACT: -97525 PROGRESS ESTIMATE ESTIMATE: PROJECT: STRUCTURE 2 PERIOD: 8/01/98 THRU 8/15/98 CONTRACTOR PO NO.: MILESTONE CONTRACTORS, L.P. LETTING: 8]06/97 Page 2 DAN GRESKANP AMERICAN CONSULTING ENGINEERS, INC. 4165 MILLERSVILLE RD. INDPLS., IN ITF. I ITEMS O[ CONTRACT QUANTITY UNIT UNIT PRICE EXTENSION (9,156.80) LIQUIDATED DAMAGES OTHER DEDUCTIONS PURSUANT TO THE PROVISION AND PENALTIES OF iC 1971 5-11-10 I HEREBY CERTIFY THAT ,"'HE FOREGOING ACCOUNT IS JUST AND CORRECT, THAT THE AMOUNT CLAIMED IS LEGALLY DUE, AFTER ALLOWING ALL jUST CREDITS, AND THAT RO PART OF THE SAME HAS BEEN PAID. CONTRACTOR DATE PER PLANS, SPECIFICATIONS, AND/OR SPECIAL PROVISIONS, THE FOLLOWING CONDITIONS APPLY ON THIS ESTIMATE. YES NO , ERECTION OF DETOUR SIGNS YES NO , CURING OF CONCRETE YES NO , MAINTENANCE OF TEMPORARY RUNAROUNDS YES PREPARATION OF PAYROLLS YES NO , BASED ON FOREGOING CONDITIONS THIS ESTIMATE (SHOULD) [SHOULD NOT) BE DELAYED. ' 'P'OJECT ENGINEER ' 7-" DATE DISTRICT DATE ERECTION OF BARRICADES NO , OPERATIONS SUPPORT DATE