Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C401 - SWPPP PLAN (INITIAL)
E E OHUOHUOHUOHUOHUOHUOHUOHUOHUEE E EWWWWWWWWWWWWWWWW EW W W WWWWW W W WW FDC WWWWWWWWWWWWWWWWWWWWWIPIPIPIPIPIPIPIPSTABILIZED STAGING AREATTIPIPIPSFSFSFSFSFSFSF SFSFSFSFSFTPTP TPTP TP TP TPTPTPTPTPTP TP TPTPTPT P TPTP TP TPT P TPTP TPTP TPTP TPTPTPTPTPTPTPTPTPTP TPTPTPTPTPTP TP TPTPTPTPTPTPTPTPTP TPT P TP IPIP1.THE EROSION AND SEDIMENT CONTROL MEASURES SHOWN ON THE DRAWINGSARE CONSIDERED THE MINIMUM PRACTICES NECESSARY FOR COMPLIANCE WITHTHE NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATEDWITH CONSTRUCTION ACTIVITY AS IDENTIFIED UNDER SECTION 327-IAC-15-5 OFTHE INDIANA ADMINISTRATIVE CODE. HOWEVER, SITE CONDITIONS,CONSTRUCTION METHODS, SEQUENCING OF WORK AND GENERAL PRACTICE MAYWARRANT VARIATION AND/OR ADDITIONS TO THE QUANTITIES AND LOCATIONS OFMEASURES AS SHOWN.2.UNLESS OTHERWISE SHOWN, TEMPORARY CONTROL MEASURES SHALL BEREMOVED UPON SATISFACTORY ESTABLISHMENT OF PERMANENT VEGETATION.3.SEE SHEET C403 FOR DETAILS AND SPECIFICATIONS REFERENCED ON THISSHEET.4.PERIMETER CONTROL MEASURES (I.E. SILT FENCE, DIVERSION DITCHES, TREEPROTECTION FENCING) SHALL BE INSTALLED PRIOR TO COMMENCINGEARTHWORK ACTIVITIES.5.IN ADDITION TO THE MAINTENANCE REQUIREMENTS IDENTIFIED FOR INDIVIDUALMEASURES, ALL EROSION CONTROL MEASURES INSTALLED UNDER THIS PROJECTSHALL BE INSPECTED WEEKLY TO ENSURE THEY ARE FUNCTIONING PROPERLY.MEASURES FOUND TO BE DEFICIENT SHALL BE REPAIRED OR REPLACEDIMMEDIATELY THEREAFTER.6.THE CONTRACTOR SHALL MAINTAIN A STABLE CONSTRUCTION ENTRANCE AT ALLTIMES AND SHALL MAKE EFFORTS TO MINIMIZE THE ACCUMULATION OF SOIL, MUDAND DEBRIS ON ADJOINING ROADWAYS.7.SYMBOLS FOR INLET PROTECTION MEASURES AND DITCH CHECKS ARE SHOWNLARGER THAN ACTUAL SIZE.8.DISTURBED AREAS AND STOCKPILES THAT ARE TO REMAIN IDLE FOR MORE THAN14 DAYS SHALL BE STABILIZED WITH TEMPORARY SEEDING.9.ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THEINSPECTOR.10.PORTABLE TOILETS SHALL BE ANCHORED TO THE GROUND TO PREVENT TIPPINGAND SPILLS.1.EARTH MOVING ACTIVITIES MAY NOT BEGIN UNTIL AFTER ITEMS 2-4 HAVE BEENCOMPLETED.2.DESIGNATE THE PERSON RESPONSIBLE FOR COMPLYING WITH THE ON-SITESWPPP. COORDINATE RESPONSIBILITY FOR COMPLETING THE SITE REVIEW AFTEREACH 12" RAINFALL AND A MINIMUM OF ONE TIME A WEEK.3.POST THE CONTACT INFORMATION AT THE CONSTRUCTION ENTRANCE AS SHOWNON THE PLANS. INCLUDE A COPY OF THE FISHERS STORM DRAINAGE APPROVALAND THE CONTACT INFORMATION FOR THE PERSON RESPONSIBLE FORIMPLEMENTING THE SWPPP.4.INSTALL SILT FENCE,CONSTRUCTION ENTRANCE, INLET PROTECTION ANDCONCRETE WASHOUT AS SHOWN ON THE PLANS.5.INSTALL PORT-A-LET, AND COVERED CONSTRUCTION DUMPSTER.6.PERFORM REQUIRED SITE DEMOLITION AND CLEARING.7.STRIP TOPSOIL AND STORE OFFSITE.8.PERFORM MASS GRADING FOLLOWED BY UTILITY INSTALLATION. MAINTAIN STORMINLET PROTECTION UNTIL SITE IS STABILIZED AND EROSION WILL NOT LIKELYOCCUR.9.MAINTAIN ALL INLET PROTECTION, AND SILT FENCING ON THE SITE PROJECT BYCLEANING OUT EVERY WEEK AND AFTER EVERY RAIN EVENT OF 1/2" OR GREATERDEPTH.10.IF WORK ON SITE WILL STOP FOR 2 WEEKS OR MORE AFTER COMPLETION OF MASSGRADING, INSTALL TEMPORARY SEED AS INDICATED ON THIS SHEET AND SHEETC403.11.ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MAY BE REQUIRED BYTHE INSPECTOR.THERE SHALL BE NO DIRT, DEBRIS, ORSTORAGE OF MATERIAL IN THE STREETADJACENT ROADS MUST BE SWEPT DAILYSFTPSCALE: 1" = 20'EROSION CONTROL NOTESEROSION CONTROL LEGENDLINE TYPE / SYMBOLDESCRIPTIONLINE TYPE / SYMBOLDESCRIPTIONTEMPORARYCONSTRUCTION ENTRANCE6 INCHES OF 2"-3" COARSEAGGREGATE (20'W x 50'L)MinimumSILT FENCE(SEDIMENT FENCE)TREE PROTECTION FENCEGRADING LIMITSTEMPORARY INLET PROTECTIONCONCRETE WASHOUTPRE-CONSTRUCTION SEQUENCING NOTESPORTABLE TOILETSSTABILIZED STAGING AREA(STABILIZE WTH #53 AGGRETATEOVER WOVEN GEOTEXTILE ORSTABLE VEGETATION AS REQUIREDTO PREVENT SEDIMENT FROMLEAVINGCONSTRUCTION SITE.)TSWPPP PLAN(INITIAL)C401DRAWING TITLE:CERTIFIED BY:DRAWING NUMBERPROJECT NUMBERREVISIONS:SCOPE DRAWINGS:PROJECT: These drawings indicate the general scope of the projectin terms of architectural design concept, the dimensions ofthe building, the major architectural elements and the typeof structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe allwork required for full performance and completion of therequirements of the Contract. On the basis of the general scope indicated or described,the trade contractors shall furnish all items required for theproper execution and completion of the work.ISSUE DATEDRAWN BYCHECKED BY© 2018 CSO Architects, Inc. All Rights ReservedKnow what'sbelow.before you dig.Call2021-06-04SOMKPARISH LIFE CENTER PROJECT OUR LADY OF MT. CARMEL CHURCH 14598 OAK RIDGE RD, CARMEL, IN 4603219038