Loading...
HomeMy WebLinkAboutE200.0 - NVL 320 Electric 2nd FloorMASTER BATH MASTER ALCOVE BEDROOM #4 BEDROOM #5 WALK-IN CLOSET WALK-IN CLOSETATTIC BATHROOM WALK-IN CLOSET BEDROOM #3 LANDING BATHROOM MASTER BEDROOM SITTING AREA WALK-IN CLOSET GFI GFI GFI GFI GFI WP FAN ONLY FAN ONLY SSSSS SSSSSSSSSSSSSSSSS SSSSSSSSD CO2SDCO2 SD CO2SD SD SD SD SSSSSSGFI SSS1/2 S LIGHT FIXTURE OUTLET - STANDARD EXHAUST FAN SWITCH RECESSED LIGHT SMOKE DETECTOR HALF HOT OUTLET (SWITCHED OUTLET) EXHAUST FAN W/LIGHT CEILING FAN ELECTRICAL SYMBOLS OUTLET - GFIGFI S SWITCH 3-WAY3W OUTLET - WP-GFIWP GFI OUTLET -220220 - C/O DETECTORS ARE REQUIRED TO BE INSTALLED IN THE IMMEDIATE VICINITY OF ALL BEDROOMS, HARDWIRED, INTERCONNECTED WITH A BATTERY BACK-UP, MUST BE A MINIMUM OF 36" FROM ALL HVAC GRILLES OR BATHROOMS THAT CONTAIN A SHOWER OR TUB. PER R315 OF THE 2020 INDIANA RESIDENTIAL CODE. CARBON MONOXIDE DETECTOR NOTES: SD CO2STAIRS LIGHT Date: 07-14-2021Plan number #201125Designed For:Futrell - StrupNVL 320H. G. McCULLOUGH DESIGNERS, INCCONSTRUCTION DRAWINGS BY:- 2146 Glenview Drive, Evansville, IN 47720 - Email: designers@hgmccullough.com- Telephone: 812 . 428 . 0174 - www.hgmccullough.comMake yourself at homeMcKENZIECOLLECTION.COM4631 Lisborn Drive Carmel, IN 46033317.574.7617 PSCALE: 1/4"=1'-0"SECOND LEVEL FLOOR PLAN - ELECTRICAL "C 2002 H. G. McCullough Designers, Inc. All rights reserved There shall be NO reproduction of this work, its technical aspects or creative content without the express written consent of H. G. McCullough Designers, Inc. This work is fully protected by copyright under U.S. copyright law and is strictly enforced by H. G. McCullough Designer, Inc." 4ADrawings & blueprints are intended solely as a plan layout& basis for materialestimate. H.G. McCullough Designers Inc.assumes no responsibility for structuralor material adequacy of drawings nor for compliance with appropriate building codes.H.G. McCullough Designers Inc. is not liable for, nor does it guarantee or controlcontractor or subcontractor's performance, nor their errors or omission. Customersshould have qualified engineer or architect review construction detailsSHEET NUMBER 6.22.2021 08/03/21