Loading...
HomeMy WebLinkAboutWillow Haven Erosion Control Estimate 20210402ESTIMATE OF PROBABLE COSTS PROJECT: LOT 1 OF 1800 106th STREET SUB.DATE: MARCH 22, 2021 Rev: April 2, 2021 LOCATION: CARMEL ITEM: SUMMARY JOB #: W200317 DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL EROSION CONTROL $13,141 CONTINGENCIES (10%)$1,314 T O T A L $14,456 Note: This estimate was prepared using information depicted in Plot Plan of lot dated December 18, 2020 Weihe Engineers 10505 N. College Avenue Indianapolis, IN 46280 317-846-6611 ESTIMATE OF PROBABLE COSTS PROJECT: LOT 1 OF 1800 106th STREET SUB.DATE: MARCH 22, 2021 Rev: April 2, 2021 LOCATION: CARMEL ITEM: EROSION JOB #: W200317 DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PERM.MULCHED SEEDING 1463 SYDS $0.65 $950.95 SILT FENCE 457 LF $1.50 $685.50 BEEHIVE INLET PROTECTION 4 EA $175.00 $700.00 TEMP. CONST. ENTRANCE 107 SYDS $15.00 $1,605.00 SUMPED INLETS 2 EA $2,500.00 $5,000.00 CONCRETE WASHOUT 1 EA $850.00 $850.00 ISOLATOR ROW 1 EA $3,350.00 $3,350.00 T O T A L E R O S I O N $13,141.45 Weihe Engineers 10505 N. College Avenue Indianapolis, IN 46280 317-846-6611