Loading...
HomeMy WebLinkAboutT111 Cover SheetREFRIGBYTENANT DW DOCUMENT APPROVAL TENANT/CLIENT, UPON SIGNATURE, APPROVES ALL ASPECTS OF THE SCOPE OF WORK CONTAINED IN THESE DOCUMENTS. _________________________________________________________________ __________________ TENANT/CLIENT COMPANY NAME DATE _________________________________________ ___________________________________________ TENANT REPRESENTATIVE SIGNATURE TENANT REPRESENTATIVE PRINTED NAME ALL COSTS INCURRED DUE TO ANY CHANGES REQUESTED AFTER SIGN-OFF OF THESE DOCUMENTS SHALL BE THE FULL RESPONSIBILITY OF THE TENANT/CLIENT. THESE DRAWINGS, AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT THE WRITTEN CONSENT OF SCHOTT DESIGN. COVER SHEET AND GENERAL NOTES T111 DESCRIPTIONDATE ISSUE 07.07.21 REVIEW SET 07.12.21 PERMIT SET REVISIONS DESCRIPTIONMARK DATE DB THIS DRAWING, AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT THE WRITTEN CONSENT OF SCHOTT DESIGN.450 E. 96th StreetIndianapolis, IN 46240p: 317.387.1700www.schottdesign.comPROJECT NUMBER DRAWN BYPROJ. MGR REALYNCSUITE 250350 VETERANS WAY, CARMEL, IN 46032ASAS 2021.077 2ND FLOOR T111 COVER SHEET AND GENERAL PROJECT NOTES L100 LIFE SAFETY PLAN D111 DECONSTRUCTION PLAN A111 ARCHITECTURAL FLOOR PLAN A121 REFLECTED CEILING PLAN A131 FINISH PLAN A211 DOOR SCHEDULE / INTERIOR DETAILS E111 ELECTRICAL PLAN INDEX OF DRAWINGS VICINITY MAP NOT TO SCALE NOT TO SCALE KEY PLAN - 2ND FLOOR N GENERAL PROJECT NOTES 1. FIRE EXTINGUISHERS: CONTRACTOR TO ENSURE ALL NEW AND EXISTING FIRE EXTINGUISHERS ARE INSTALLED ACCORDING TO NFPA 10. COORDINATE WITH OWNER/LANDLORD ON EXTINGUISHER TYPE AND HOUSING. MAXIMUM TRAVEL DISTANCE OF 75 FEET FROM ANY POINT TO A VISIBLE EXTINGUISHER. THE FOLLOWING NOTES APPLY ONLY IN EXISTING SPRINKLERED FACILITIES. 2. DESIGN BUILD FIRE PROTECTION SYSTEM: FIRE PROTECTION WORK IS TO BE PROVIDED BY DESIGN/BUILD SERVICES UNDER THE GENERAL CONTRACT. PROVIDE A COMPLETE, WORKING SYSTEM. SCHOTT DESIGN, INC. IS NOT RESPONSIBLE FOR THE DESIGN, INSTALLATION, OR RENOVATION OF THE FIRE SPRINKLER SYSTEM. 3. FIRE PROTECTION SYSTEM CODE COMPLIANCE: THE DESIGN/BUILD CONTRACTOR SHALL COMPLY WITH THE INDIANA BUILDING CODE, THE INDIANA FIRE CODE, AND ALL OTHER APPLICABLE LAWS, CODES, RULES AND REGULATIONS THAT APPLY TO DESIGN AND INSTALLATION OF FIRE SPRINKLER/FIRE SUPPRESSION SYSTEMS. 4. FIRE PROTECTION DESIGN DRAWINGS: THE FIRE PROTECTION CONTRACTOR SHALL GENERATE ALL REQUIRED DRAWINGS, AND SHALL FILE THOSE DRAWINGS, AND RELATED DOCUMENTS, WITH THE STATE AND LOCAL AUTHORITIES HAVING JURISDICTION OVER THE PROJECT. 5. SPRINKLER HEADS: PROVIDE NEW OR RELOCATE EXISTING SPRINKLER HEADS AS REQUIRED. PROVIDE MISSING COVER/ESCUTCHEON PLATES FOR SPRINKLER HEADS WHERE APPLICABLE. FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE START OF WORK. FIRE PROTECTION NOTES 1. STATE BUILDING COMPLIANCE FOR FINISHES: ALL FINISHES SHALL COMPLY WITH CHAPTER 8 (INTERIOR FINISHES) OF THE INDIANA BUILDING CODE FOR CLASS A FIRE RATINGS. 2. GYPSUM ASSOCIATION CONFORMITY: FOR ALL NEW DRYWALL INSTALLATIONS, INSTALL AS RECOMMENDED BY THE GYPSUM ASSOCIATION (SUCH AS, CONTROL JOINTS, FINISH LEVELS, FASTENERS, TAPING DETAILS, CORNER BEADS, ETC.). PROVIDE NEW CEMENT BACKER BOARD AS A SUBSTRATE FOR NEW WALL TILE PER MANUFACTURER'S RECOMMENDATIONS. 3. COVER PLATES: REFERENCE REFLECTED CEILING PLAN AND ELECTRICAL PLAN FOR COLOR OF ELECTRICAL AND DATA DEVICES AND PLATES. REMOVE ALL PLATES BEFORE PAINTING AND REINSTALL AFTERWARD. CONTRACTOR TO CONFIRM DESIRED COLOR PRIOR TO PURCHASING NEW. 4. PAINTING: ALL AREAS RECEIVING PAINT ARE TO RECEIVE PRIMER COAT AND TWO (2) FINISH COATS. 5. FLOORING TRANSITION STRIPS: FOR CHANGE IN FLOOR FINISH MATERIAL, PROVIDE TRANSITION STRIP AT DOOR OPENINGS AS NOTED ON FINISH PLAN UNLESS NOTED OTHERWISE (I.E. WHERE VCT MEETS CARPET). 6. DELIVERY OF COMPREHENSIVE WORK PRODUCT: WHERE LIMITS OF WORK ARE SHOWN, OTHER INCIDENTAL WORK LIKE PAINTING WHERE NEW OUTLETS HAVE BEEN INSTALLED, IS CONSIDERED PART OF THE SCOPE OF WORK. PROVIDE A COMPLETE AND FINISHED PRODUCT READY FOR TENANT AND BUILDING OWNER. 7. WALL DEMOLITION: REFINISH SURFACES TO MATCH EXISTING WHERE DEMOLITION HAS OCCURRED. REPAIR GYPSUM WALLBOARD WHERE DEMOLITION HAS OCCURRED AT REMAINING WALLS. REPAIR ANY GYPSUM BOARD DAMAGED BY DEMOLITION. PROVIDE EXPANSION JOINTS IN DRYWALL WHERE NEW WALLS MEET OR ADJOIN TO EXISTING CORE WALLS. 8. PHONE BOARDS: WHERE PHONE BOARD IS PROVIDED, PAINT BOARD WITH FIRE RETARDANT PAINT TO MATCH ADJACENT WALL FINISH. 9. INTERIOR ELEVATION DETAILS: REFERENCE INTERIOR ELEVATION & SECTIONS WHERE PROVIDED FOR ADDITIONAL FINISH INFORMATION. 10. PAINT & ADHESIVE VOC'S: ALL PAINTS AND ADHESIVES/SEALANTS SHALL HAVE ZERO VOC CONTENT. 11. ADHESIVE MANUFACTURER RECOMMENDATIONS: ALL ADHESIVES/SEALANTS TO BE USED AS RECOMMENDED BY PRODUCT MANUFACTURER. FINISH NOTES 1. CASEWORK/MILLORK: CASEWORK AND MILLWORK GENERALLY INDICATED ON THESE DRAWINGS ARE TO BE PROVIDED UNDER THE GENERAL CONTRACT. 2. AWI COMPLIANCE: UNLESS INDICATED OTHERWISE, COMPLY WITH ARCHITECTURAL WOODWORK INSTITUTE (A.W.I.) CURRENT STANDARDS FOR CUSTOM GRADE WOODWORK. 3. MILLWORK SHOP DRAWINGS: FURNISH SHOP DRAWINGS ON ALL MILLWORK AND CASEWORK FOR APPROVAL BY THE TENANT AND SCHOTT DESIGN PRIOR TO FABRICATION. 4. MILLWORK FIELD VERIFICATION: WHERE CASEWORK AND MILLWORK ARE TO BE INSTALLED, VERIFY ALL DIMENSIONS ON PLANS AGAINST DIMENSIONS OF AS-BUILT CONDITIONS IN FIELD. REPORT ANY DISCREPANCIES TO SCHOTT DESIGN THROUGH THE GENERAL CONTRACTOR. MAKE ADJUSTMENTS TO CASEWORK AND MILLWORK TO FIT FIELD CONDITIONS UNLESS DOING SO WILL SIGNIFICANTLY ALTER THE INTENT OF THE DESIGN SHOWN ON THE DRAWINGS. 5. DRAWING REVIEW AND DISCREPANCIES: VERIFY FINISHES (LAMINATE, VENEER, STAINS, ETC.) ON THE SECTIONS AND ELEVATION DRAWINGS WITH FINISHES INDICATED ON THE FINISH PLAN/SCHEDULES. IMMEDIATELY REPORT ANY DISCREPANCIES TO SCHOTT DESIGN THROUGH THE GENERAL CONTRACTOR. 6. MILLWORK REQUIREMENTS: REFER TO MILLWORK SECTIONS & ELEVATIONS . UNLESS OTHERWISE SHOWN, PLASTIC LAMINATE CLAD COUNTERTOPS WITH 4" BACKSPLASH WHERE INDICATED, BACKSPLASH TO BE FIELD APPLIED. REFER TO MILLWORK SECTIONS & ELEVATIONS FOR CABINETRY SPECIFICATIONS (CUSTOM PLASTIC LAMINATE OR PRE-MANUFACTURED STOCK CABINETRY). EDGES OF PLASTIC LAMINATE COUNTERTOPS, CABINETS AND DRAWERS TO BE PLASTIC LAMINATE AND NOT PVC OR OTHER STOCK PLASTIC EDGING UNLESS NOTED OTHERWISE. 7. MILLWORK WALL BLOCKING: PROVIDE BLOCKING IN WALLS FOR ALL MILLWORK, WALL STOPS, HARDWARE, AND CABINETRY WHERE SPECIFIED. ALL WOOD BLOCKING TO BE FIRE RATED. MILL/CASEWORK NOTES 1. DECONSTRUCTION DEFINITION: CAREFULLY DISMANTLE SPACES WITH THE GOAL OF MAXIMIZING THE REUSE POTENTIAL OF ITS COMPONENTS. 2. RECYCLING: GENERAL CONTRACTOR IS RESPONSIBLE FOR RECYCLING OF ALL CARPET AND METALS AT A MINIMUM, AND COORDINATING THE APPROPRIATE HAULING CONTAINERS WITH THE WASTE MANAGEMENT SUB-CONTRACTOR AND KRUSE CARPET RECYCLING. REFER TO DECONSTRUCTION D111 SHEET FOR SPECIFIC INSTRUCTIONS. 3. EXISTING STRUCTURAL ELEMENTS OF BUILDING: NO STRUCTURAL OR LOAD-BEARING CONSTRUCTION SHALL BE REMOVED, DEMOLISHED, OR DAMAGED AS A RESULT OF THIS PROJECT UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS. PROTECT ALL EXISTING STRUCTURAL MEMBERS DURING DEMOLITION/CONSTRUCTION. THE CONTRACTOR SHALL VERIFY IN THE FIELD, PRIOR TO DEMOLITION, THAT ALL ITEMS NOTED TO BE DEMOLISHED ARE NOT STRUCTURAL. CONTACT SCHOTT DESIGN IMMEDIATELY IF THE CONTRACTOR(S) IN THE FIELD SUSPECT THAT AN ITEM NOTED FOR DEMOLITION APPEARS TO BE STRUCTURAL OR OTHERWISE LOAD-BEARING. BEWARE OF STRUCTURAL COLUMNS AND/OR BEAMS THAT MAY BE CONCEALED BEHIND FINISHES THAT ARE NOTED FOR REMOVAL. EXERCISE CAUTION WHEN DEMOLISHING BUILDING FINISHES OR PARTITIONS ADJACENT TO OR AROUND STRUCTURAL MEMBERS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR INADVERTENT DAMAGE TO THE BUILDING STRUCTURAL SYSTEM. 4. EQUIPMENT, FIXTURE, FINISH RE-USE: WHERE EQUIPMENT, FIXTURES, OR FINISHES ARE MOVED FROM ANY OTHER PART OF THE BUILDING TO BE REUSED IN THE PROJECT AREA, THE CONTRACTOR SHALL INCLUDE IN THEIR SCOPE OF WORK ANY NECESSARY PATCHING OR REPAIRING OF THE REMAINING AREAS FROM WHERE THE ITEMS WERE RELOCATED, UNLESS OTHERWISE DIRECTED BY OWNER. 5. DECONSTRUCTION PLANS: REMOVE ALL EXISTING WALLS AND DOORS WHERE INDICATED BY NOTE, SYMBOL, OR DASHED LINES. NOTE THAT SOME ITEMS HAVE NOT BEEN SHOWN ON DECONSTRUCTION PLAN. VISIT AREA OF WORK TO ASSURE EXTENT OF DECONSTRUCTION. 6. FIELD VERIFICATION OF EXISTING CONDITIONS: REMOVE ALL CARPET, VINYL BASE, VCT, WALL FABRIC, AND ANY OTHER FINISHES AS REQUIRED FOR NEW CONSTRUCTION. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. REFER TO FINISH PLAN/SCHEDULE FOR CLARIFICATION OF EXISTING FINISHES TO REMAIN. 7. PROTECTION OF BUILDING ELEMENTS TO REMAIN: USE CARE TO PROTECT EXISTING BUILDING ELEMENTS INDICATED ON THE DRAWINGS TO REMAIN SUCH AS, BUT NOT LIMITED TO, EXISTING CEILING GRID, TILES, FIRE SUPPRESSION EQUIPMENT, DIFFUSERS, LIGHT FIXTURES, EQUIPMENT, CASEWORK, AND FINISHES. THE CONTRACTOR SHALL REPLACE AND/OR REPAIR, AT THE CONTRACTOR'S COST, ANY SUCH ELEMENTS DAMAGED DURING CONSTRUCTION THAT COULD HAVE OTHERWISE BEEN REASONABLY PROTECTED AND MAINTAINED IN GOOD CONDITION FOR THE OWNER'S USE IN THE PROJECT. 8. REMOVAL OF ABANDONED CABLING & WIRING: PER THE INDIANA ELECTRICAL CODE (SPREAD OF FIRE OR PRODUCTS OF COMBUSTION) REMOVE ALL ACCESSIBLE PORTIONS OF ABANDONED CABLES AND WIRING INCLUDING BUT NOT LIMITED TO: DATA WIRING, COMMUNICATIONS WIRING, FIRE ALARM CABLES, AUDIO CABLES, COAXIAL CABLES, FIBER OPTIC CABLES/RACEWAYS, AND PLTC CABLES. REFER TO SECTION 300.21. ANY SUCH CABLE OR WIRING SHOULD BE PULLED AND REMOVED BACK TO THEIR MAIN SOURCES ON THE FLOOR (I.E. ELECTRICAL PANELS, PHONE BOARDS, ETC.) 9. PROTECTION OF ABANDONED/TERMINATED BUILDING SYSTEM ELEMENTS: WHERE FIXTURES OR EQUIPMENT ARE REMOVED FROM ANY ELECTRICAL, PLUMBING, MECHANICAL, OR VOICE/DATA SYSTEMS, ALL REMAINING TERMINATIONS SHALL BE CLOSED AND PROTECTED IN STRICT ACCORDANCE WITH INDUSTRY STANDARDS AND GOVERNING SAFETY REGULATIONS OR PROCEDURES. MARK, LABEL, OR FLAG ALL TERMINATED SYSTEMS FOR FUTURE REFERENCE. CONTRACTOR TO PROVIDE AN "AS-BUILT" SET INDICATING THE LOCATION OF ALL PERMANENTLY ABANDONED SYSTEMS. 10. HAZARDOUS MATERIALS: GENERAL CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING ANY AND ALL ITEMS THAT MAY CONTAIN HAZARDOUS OR HARMFUL MATERIALS. ALL IDENTIFIED ITEMS MUST BE PROPERLY DISPOSED OF PER EPA AND INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT RULES AND REGULATIONS. DECONSTRUCTION NOTES 1. BUILDING CODE COMPLIANCE: ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE EXISTING BUILDING CONSTRUCTION TYPE AS DEFINED BY SECTION 601 OF THE INDIANA BUILDING CODE AND ALL APPLICABLE STATE AND LOCAL BUILDING CODES. CONTRACTORS ARE RESPONSIBLE FOR VERIFYING THE CURRENT APPLICABLE BUILDING CODE(S) FOR THEIR RESPECTIVE SCOPE OF WORK. ENSURE THAT ALL MATERIALS AND LABOR ARE IN ACCORDANCE WITH THE BEST QUALITY STANDARDS OF EACH RESPECTIVE TRADE WHETHER SPECIFIED OR NOT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL WORK IS IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL BUILDING CODES, AND STANDARDS FOR GENERAL, MECHANICAL, AND ELECTRICAL CONSTRUCTION. 2. CONTRACTOR SITE VISITS: CONTRACTOR(S) SHALL VISIT THE WORK SITE PRIOR TO COMMENCEMENT. THE DRAWINGS CONTAINED HEREIN MAY NOT BE ALL INCLUSIVE OF EXISTING CONDITIONS OR NEW WORK REQUIREMENTS. CONTRACTOR(S) SHALL MAKE THEMSELVES FAMILIAR WITH THE WORK SITE IN THE FIELD IN ORDER TO BE FULLY AWARE OF THE REQUIREMENTS OF THE SCOPE OF WORK. 3. CONTRACTOR FIELD VERIFICATION: FIELD VERIFY ALL DIMENSIONS AND MEASUREMENTS. INFORM THE GENERAL CONTRACTOR BEFORE BEGINNING ANY CONSTRUCTION IF EXISTING CONDITIONS PREVENT OBTAINING RESULTS AS SHOWN OR SPECIFIED. DO NOT SCALE DRAWINGS; NOTED DIMENSIONS TAKE PRECEDENCE. VERIFY EXISTING CONDITIONS INDICATED ON THE DRAWINGS AND REPORT ANY DISCREPANCIES THROUGH THE GENERAL CONTRACTOR TO SCHOTT DESIGN, INC. 4. GENERAL CONTRACTOR COORDINATION WITH OWNER: THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE OWNER REGARDING ALL ON-SITE ACTIVITIES SUCH AS, BUT NOT LIMITED TO: WORK SCHEDULE, MATERIALS STORAGE AND HANDLING, DELIVERIES, ACCESS TO THE WORK SITE, TRAFFIC CONTROL, AND BUILDING/PUBLIC SAFETY PROCEDURES DURING CONSTRUCTION. THE CONTRACTOR SHALL ALSO COORDINATE WORK "BY OTHERS" WITH HIS/HER OWN ACTIVITIES AS NECESSARY TO EXECUTE THE OVERALL PROJECT SCOPE. THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, DAILY WORKING HOURS, WEEKEND HOURS AND HOURS THAT MAY BE WORKED PRIOR TO AND DURING HOLIDAYS. LANDLORD RESERVES THE RIGHT TO RESTRICT CONSTRUCTION TO NIGHTS AND WEEKENDS WHEN THAT CONSTRUCTION IS DEEMED TO INTERFERE WITH THE OPERATIONS OF ADJACENT TENANTS. 5. PROJECT MATERIAL LEAD TIMES: FOR THOSE ITEMS TO BE ORDERED REQUIRING LEAD TIME, THE CONTRACTOR SHALL COORDINATE THE PROJECT SCHEDULE ACCORDINGLY AND COMMUNICATE TO THE OWNER, TENANT, AND SCHOTT DESIGN WHEN DECISIONS MUST BE RENDERED IN ORDER FOR THE CONTRACTOR TO MEET THE PROJECT SCHEDULE. THE OWNER, TENANT, OR DESIGNER/ARCHITECT IS NOT RESPONSIBLE FOR DELAYS RESULTING FROM THE CONTRACTOR'S FAILURE TO COMMUNICATE MATERIAL LEAD TIMES. 6. MATERIAL SUBSTITUTIONS: SUBSTITUTIONS FOR SPECIFICALLY NAMED PRODUCTS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL FROM THE DESIGNER. SUBMIT REQUESTS FOR SUBSTITUTIONS WITH APPROPRIATE SUPPORT INFORMATION TO THE DESIGNER. ALLOW REASONABLY SUFFICIENT TIME FOR THE DESIGNER TO REVIEW THE REQUEST AND RENDER A DECISION. 7. SAFE WORK AREA: SCHOTT DESIGN, INC., SHALL NOT HAVE CONTROL OVER, BE IN CHARGE OF, OR BE RESPONSIBLE FOR A CONTRACTOR'S CONSTRUCTION MEANS, METHODS, SCHEDULES, SEQUENCES, OR SAFETY. THE CONTRACTORS SHALL BE RESPONSIBLE FOR MAINTAINING A SAFE ENVIRONMENT FOR WORKERS AND THE PUBLIC AT ALL TIMES. 8. GENERAL CONTRACTOR CLEANUP PROCEDURES: THE GENERAL CONTRACTOR SHALL ESTABLISH WITH THE LANDLORD CLEANUP PROCEDURES AND GUIDELINES TO BE FOLLOWED ON A DAILY BASIS IN ORDER TO CONDUCT BUSINESS IN A SAFE AND CLEAN ENVIRONMENT. 9. STAGING/ PARKING/ DUMPSTERS/ RESTROOMS: THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD AN AREA FOR STAGING OF CONSTRUCTION MATERIALS, EQUIPMENT, DUMPSTER AND PARKING CONSTRUCTION AND DELIVERY VEHICLES. THE USE OF EXISTING RESTROOM FACILITIES SHALL BE APPROVED BY THE LANDLORD. ONLY THOSE DESIGNATED AREAS SHALL BE USED BY CONSTRUCTION CREWS. 10. DUST CONTROL: THE GENERAL CONTRACTOR SHALL USE DUST PARTITIONS TO MINIMIZE DISTURBANCES OF DAILY TENANT OPERATIONS DURING DEMOLITION AND CONSTRUCTION WORK. DUST PARTITIONS SHALL BE CONSTRUCTED OF 2X4 WOOD STUDS @ 24"O.C., INSULATION AND 6 MIL VAPOR BARRIER ON EACH SIDE. 11. PROJECT INSTALLATION CONFLICTS: CONTACT THE DESIGNER IMMEDIATELY IF CONFLICTS ARE DISCOVERED IN THE FIELD BETWEEN COMPONENTS OF DIFFERENT SYSTEMS THAT PREVENT THE INSTALLATION OF THOSE COMPONENTS AS INDICATED ON THE DRAWINGS. (I.E. WHERE EXISTING MECHANICAL DUCTWORK MAY PREVENT THE INSTALLATION OF LIGHTING FIXTURES AS INDICATED ON THE CEILING PLAN). 12. SCHOTT DESIGN HAZARDOUS MATERIALS WAIVER: SCHOTT DESIGN, INC., IS NOT RESPONSIBLE FOR THE IDENTIFICATION, DISCOVERY, PRESENCE, HANDLING, REMOVAL, DISPOSAL OF, OR EXPOSURE TO ANY PERSONS, THAT OF HAZARDOUS MATERIALS IN ANY FORM ON THE PROJECT SITE. 13. WOOD BLOCKING IN WALLS: PROVIDE FIRE-TREATED WOOD BLOCKING IN WALLS FOR ALL WALL HUNG ITEMS INCLUDING MILLWORK, WALL STOPS, CABINETRY, ETC. 14. SHOP DRAWINGS: SHOP DRAWINGS OR CATALOG CUTS MUST BE SUBMITTED TO SCHOTT DESIGN, INC. FOR APPROVAL ON ALL MATERIALS OR ITEMS WHERE THE CONTRACTOR CHOOSES TO DEVIATE FROM WHAT IS SHOWN ON THE DRAWINGS, OR IF THE DRAWINGS DO NOT INDICATE A SPECIFIC MANUFACTURER OR MODEL NUMBER. EXPEDITE PREPARATION AND SUBMITTAL OF ALL SHOP DRAWINGS TO ALLOW SUFFICIENT TIME FOR CHECKING, APPROVAL, ORDERING, FABRICATION, AND DELIVERY OF MATERIALS AND EQUIPMENT. 15. PROJECT APPROVALS: ALL DETAILS, MATERIALS, AND INSTALLATIONS ARE SUBJECT TO FIRST APPROVAL BY SCHOTT DESIGN, INC., AND FINAL APPROVAL BY THE OWNER. 16. CHANGE ORDERS: REVIEW AND COORDINATE ALL NEW WORK AND EXISTING CONDITIONS WITH ALL OTHER TRADES. FIELD WORK ORDERS & CHANGE ORDERS WILL NOT BE APPROVED FOR ANY CONDITIONS OR CONFLICTS THAT COULD HAVE BEEN ACCOUNTED FOR BY THE BIDDER DURING PRE-BID FIELD INSPECTION AND AFTER AWARD OF CONTRACT. 17. FURNITURE AND EQUIPMENT EXCLUSIONS: FURNITURE, OFFICE EQUIPMENT, OFFICE PARTITION SYSTEMS, REFRIGERATORS, VENDING MACHINES, AND OTHER SIMILAR ITEMS SHOWN DASHED ON THIS DRAWING AND NOT ATTACHED TO THE BUILDING ARE FOR REFERENCE ONLY AND ARE NOT TO BE PROVIDED AS PART OF THE WORK UNLESS SPECIFICALLY STATED TO BE PROVIDED. 18. WALL PATCHING: PATCH ALL GYPSUM WALLBOARD AT AREAS OF ELECTRICAL, DATA AND SWITCH DEVICES BEING REMOVED. PATCH HOLE WITH DRYWALL, TAPE, SPACKLE AND PREPARE FOR FINISH. 19. CONSTRUCTION CLEANING: EXECUTE A THOROUGH FINAL CLEAN AND INSPECTION OF THE SPACE UPON COMPLETION OF THE PROJECT. ALL SURFACES, FIXTURES, AND EQUIPMENT SHALL BE CLEAN, AND THE SPACE SHALL BE TURNED OVER TO THE OWNER IN A CONDITION THAT REPRESENTS THE HIGHEST LEVEL OF CARE AND PROFESSIONALISM. ENSURE ALL GENERAL CONTRACTOR INSTALLED APPLIANCES WORK & DO NOT LEAK. 20. O & M MATERIALS: PROVIDE TO THE OWNER ALL OPERATION AND/OR MAINTENANCE MANUALS, OR INSTRUCTIONS FOR ALL EQUIPMENT AND SYSTEMS AT THE COMPLETION OF THE PROJECT. 21. PLAN DIMENSIONS: ALL PLAN DIMENSIONS ARE FROM FACE OF EXISTING FINISH TO FACE OF NEW GYPSUM BOARD WALL, OR FACE TO FACE OF NEW GYPSUM BOARD WALL. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 22. WINDOW BLINDS: CONTRACTOR TO PROVIDE AN ALLOWANCE FOR CLEANING EXISTING WINDOW BLINDS. REPLACE ANY DAMAGED OR MISSING WINDOW BLINDS WITH NEW TO MATCH BUILDING STANDARD. 23. PERMITTING: THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE REQUIREMENTS REGARDING LOCAL PLAN REVIEW, PERMITS, INSPECTIONS, AND FEES. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING ALL REQUIRED DRAWINGS AND SUPPORTING DOCUMENTS TO THE LOCAL BUILDING OFFICIAL AND/OR PERMIT DEPARTMENT. ALL REQUIRED LOCAL PERMIT FEES SHALL BE PAID BY THE GENERAL CONTRACTOR UNLESS STIPULATED OTHERWISE IN THE OWNER/CONTRACTOR AGREEMENT. 24. FIRE SEALING: FIRE SEAL ALL PENETRATIONS THROUGH RATED WALLS, FLOORS, AND CEILINGS WITH APPROVED FIRE-RATED CAULK AS DIRECTED BY LOCAL JURISDICTIONS. CONTRACTOR TO BE AWARE THAT EXISTING CONDITIONS ARE NOT NECESSARILY AN INDICATOR OF BUILDING TYPE. BUILDING TYPE LISTED ON LIFE SAFETY PLAN IS BASED UPON AVAILABLE INFORMATION AND FIELD VERIFICATION. 25. WALL PENETRATIONS: WHERE STRUCTURAL BEAMS, DUCTWORK, ETC. PENETRATE SOUND OR FIRE RATED PARTITIONS, GYPSUM WALLBOARD WALL TO BE SCRIBED TO FIT TIGHT, CAULKED AND FIRE DAMPERED IF REQUIRED. 26. FLOOR LEVELING: CONTRACTOR TO ALLOW FOR UNLEVEL FLOOR CONDITIONS. ALL EXISTING FLOOR AND WALL SUBSTRATES SHALL BE LEVELED AND PATCHED AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES. ADJUST DOORS AND FRAMES AS REQUIRED. 27. REPAIR GYPSUM WALLBOARD: REPAIR GYPSUM WALLBOARD WHERE DEMOLITION HAS OCCURRED AT REMAINING WALLS. REPAIR ANY GYPSUM BOARD DAMAGED BY DEMOLITION. PROVIDE EXPANSION JOINTS IN DRYWALL WHERE NEW WALLS MEET OR ADJOIN TO EXISTING CORE WALLS. 28. EQUIPMENT INSTALLATION: ALL EQUIPMENT AND/OR FIXTURES SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS OR INSTRUCTIONS. 1. M/E/P: THE MECHANICAL, ELECTRICAL AND PLUMBING SCOPES OF WORK ARE LIMITED TO BASIC DESIGN-BUILD ALTERATIONS WHICH ARE OUTLINED IN THESE PLANS. THE DESIGN-BUILD CONTRACTORS FOR EACH TRADE MUST NOTIFY THE ARCHITECT IF THEY FIND THAT THE SCOPE OF WORK EXCEEDS THE LEVEL OF MECHANICAL, ELECTRICAL OR PLUMBING WORK INDICATED ON THESE DRAWINGS SO THAT ANY NECESSARY ENGINEERING CAN OCCUR AND ADDITIONAL PLANS CAN BE FILED, OR IF ADDITIONAL INFORMATION IS NEEDED IN ORDER TO COMPLETE THE WORK IN THE FIELD. 2. HVAC: MECHANICAL WORK IS LIMITED TO A DESIGN-BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS. NO NEW MAIN MECHANICAL APPLIANCES OR MAIN EQUIPMENT ARE BEING PROVIDED. ALL MECHANICAL WORK IS LIMITED TO RELOCATION OF DIFFUSERS AND FLEX DUCT PER NEW WALL LAYOUT. MECHANICAL CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY WITH THE INDIANA MECHANICAL CODE AND ALL OTHER APPLICABLE CODES. 3. HVAC HEAT LOADS: VERIFY HEAT LOADS OF ANY SPECIAL EQUIPMENT IN THE TENANT SPACE, AND PROVIDE ADDITIONAL AIR FLOW IF REQUIRED. CONFIRM WITH OWNER PRIOR TO ANY PURCHASE OF NEW EQUIPMENT. REVISE ZONING IF REQUIRED. CONTRACTOR TO ENSURE THAT ALL HVAC ZONES ARE LOCATED APPROPRIATELY SUCH THAT NO SPLIT ZONES ARE IN OFFICES OR CONFERENCE ROOMS UNLESS APPROVED BY BUILDING OWNER/LANDLORD. 4. HVAC DIFFUSER LOCATIONS: RELOCATE AIR-SUPPLY DIFFUSERS AND RETURN-AIR GRILLES AS REQUIRED. PROVIDE PROPER AIR SUPPLY FOR DIFFUSERS AND RETURN AIR FROM RETURN AIR GRILLES. CONTRACTOR SHALL PLACE DIFFUSERS AND RETURN AIR GRILLES AS REQUIRED BY CODE. 5. HVAC THERMOSTAT LOCATIONS: POSITION ALL THERMOSTATS WHERE APPROPRIATE PER MECHANICAL DESIGN. COORDINATE WITH TENANT AND BUILDING OWNER FOR FURNITURE PANEL OR OTHER CONFLICTS. 6. ELECTRICAL: ELECTRICAL WORK IS LIMITED TO A DESIGN-BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS. ALL ELECTRICAL WORK IS LIMITED TO ADDITIONS OR RELOCATIONS OF ELECTRICAL OUTLET DEVICES AND LIGHTING THAT DO NOT EXCEED THE CAPACITY OF THE EXISTING ELECTRICAL SERVICE IN THE BUILDING. ELECTRICAL CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY WITH ALL APPLICABLE CODES. 7. ELECTRICAL CODE COMPLIANCE: COMPLY WITH THE INDIANA ELECTRICAL AND MECHANICAL CODE AND ALL OTHER APPLICABLE CODES. 8. ELECTRICAL CIRCUITING: SIZE AND CIRCUIT ELECTRICAL POWER ITEMS. PROVIDE OR REUSE ELECTRICAL POWER AND DATA OUTLETS AS REQUIRED. 9. GFCI OUTLETS: ALL ELECTRICAL OUTLETS WITHIN 6'-0" OF WATER ARE TO BE GFCI. 10. PHONE AND DATA ACCOMMODATIONS: AT EACH PHONE/DATA JACK, PROVIDE PULL STRING FROM ABOVE CEILING TO BOX. TENANT'S DATA CONTRACTOR IS RESPONSIBLE FOR PULLING CONDUCTORS AND PROVIDING APPROPRIATE TERMINALS AT FACE PLATE. 11. ELECTRICAL SWITCH PLATES: PROVIDE COLORED FACEPLATES FOR ELECTRICAL OUTLETS & SWITCH PLATES TO MATCH EXISTING, UNLESS OTHERWISE NOTED. ELECTRICIAN TO FIELD VERIFY PRIOR TO PURCHASE. 12. WORK STATION POWER: PROVIDE JUNCTION BOXES OR POWER POLES AT WORKSTATIONS WHERE SHOWN. REFER TO THE PLAN FOR THE APPROPRIATE DESIGNATIONS. DATA WILL BE RUN BY THE TENANT'S DATA VENDOR. ELECTRICIAN TO MAKE FINAL CONNECTION FROM WORKSTATION WHIP TO JUNCTION BOX. THE FURNITURE VENDOR IS RESPONSIBLE FOR WIRING THE BASE PANELS OF THE WORKSTATIONS. CONTRACTOR TO COORDINATE WITH TENANT ON WORKSTATION FURNITURE SPECIFICATIONS TO OBTAIN CIRCUITRY REQUIREMENTS PRIOR TO RUNNING ELECTRICAL CONDUITS TO JUNCTION BOXES. 13. LIGHTING CIRCUITS: VERIFY EXISTING LIGHTING CIRCUITING; SIZE NEW CIRCUITS AS REQUIRED. PROVIDE NEW OR REVISE EXISTING CIRCUITING FOR NEW LAYOUT OF LIGHT FIXTURES. 14. ELECTRICAL OUTLETS: ENSURE THAT ALL MOUNTING HEIGHTS OF ELECTRICAL DEVICES MEET ADA REQUIREMENTS. 15. LIGHTING SWITCH PLATES: WHERE MULTIPLE SWITCHES ARE SHOWN, PROVIDE (1) GANG BOX WITH A SINGLE COVER PLATE. 16. FIXTURE PLACEMENT: CENTER CEILING ELEMENTS IN CEILING TILES, INCLUDING RECESSED DOWN LIGHTS, SMOKE DETECTORS, SPRINKLER HEADS, AND EXIT SIGNS UNLESS OTHERWISE NOTED. 17. EMERGENCY LIGHTING: PROVIDE EMERGENCY LIGHTING IN TENANT SPACE AS REQUIRED PER NEMA AND IBC. EMERGENCY BATTERY PACKS OR LIGHTS CONNECTED TO AN EMERGENCY POWER SOURCE ARE REQUIRED IF THE SPACE CONTAINS 50 PERSONS OR MORE. FIXTURES SHOWN ON PLAN ARE FOR REFERENCE ONLY. 18. FIRE ALARM SYSTEM: FIRE SUPPRESSION AND FIRE ALARM SYSTEMS SHALL BE INSTALLED BY THE APPROPRIATE DESIGN-BUILD CONTRACTOR AND MUST COMPLY WITH ALL APPLICABLE STATE AND LOCAL BUILDING CODES. FIRE SUPPRESSION AND FIRE ALARM DESIGN-BUILD CONTRACTORS ARE RESPONSIBLE FOR COMPLETING AND FILING THEIR PLANS AND OBTAINING THEIR PERMITS. PROVIDE ALARM NOTIFICATION APPLIANCES (HORNS/STROBES), EMERGENCY SPEAKERS, SMOKE DETECTORS, FIRE PULLS, AND ANY OTHER REQUIRED ALARM & DETECTION SYSTEMS AS NECESSARY TO MEET ALL APPLICABLE CODES (INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE, NFPA). 19. FIRE ALARM DEVICE LOCATIONS: COORDINATE WITH OWNER/TENANT PRIOR TO INSTALLATION OF FIRE DETECTION DEVICES REGARDING ALL DEVICE LOCATIONS TO AVOID CONFLICT WITH FEATURE WALLS (CONFERENCE ROOMS AND RECEPTION AREAS) AND TENANT-INSTALLED ITEMS (I.E. PRESENTATION BOARDS, A/V EQUIPMENT AND PROJECTION SCREENS). FAILURE TO DO SO MAY RESULT IN CONTRACTOR RELOCATING THESE ITEMS AT THEIR EXPENSE. 20. EXISTING LIGHT FIXTURE RELAMP: IF REQUIRED, AND AS NECESSARY, PROVIDE NEW BALLASTS AND LAMPS IN ALL LIGHTS IN EXISTING SPACES. CONSULT WITH LANDLORD. 21. HVAC CONTRACTOR AIR BALANCE: CONTRACTOR TO PERFORM AIR BALANCE UPON COMPLETION OF HVAC SCOPE. PROVIDE REPORT TO LANDLORD. 22. HVAC FLEX DUCT: FLEX DUCT MUST MEET ASHRAE STANDARD BUILDING CODES FOR FLEX DUCT LENGTH. 23. ENGINEERED MEP DRAWINGS: THE MECHANICAL, ELECTRICAL AND PLUMBING DESIGN-BUILD CONTRACTORS SHALL COMPLY WITH ALL APPLICABLE STATE AND LOCAL BUILDING CODES. WHEN REQUIRED BY STATE BUILDING CODE, THE CONTRACTOR(S) SHALL PROVIDE DESIGN/BUILD DRAWINGS FOR MECHANICAL, PLUMBING, ELECTRICAL, OR FIRE SUPPRESSION. DRAWINGS SHALL BE CERTIFIED BY A LICENSED ENGINEER AND SUBMITTED BY THE CONTRACTOR FOR STATE DESIGN REVIEW. 24. EQUIPMENT INSTALLATIONS: ALL EQUIPMENT AND/OR FIXTURES SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS OR INSTRUCTIONS. MECHANICAL & ELECTRICAL NOTES - GENERAL ADMINISTRATIVE RULES (675 IAC 12) - 1NDIANA BUILDING CODE, 2014 EDITION (IBC, 2012 EDITION, 675 IAC 13-2.6) - HANDICAPPED ACCESSIBILITY CODE: 2014 INDIANA BUILDING CODE CHAPTER 11, ANSI A117.1-2009, 675 IAC 13-2.6-12) - INDIANA FIRE CODE, 2014 EDITION (IFC 2012 EDITION, 675 IAC 22-2.5) - INDIANA PLUMBING CODE, 2006 EDITION (675 IAC 16-1.4) - INDIANA ELECTRICAL CODE, 2009 EDITION (2008 NFPA 70, 675 IAC 17-1.8) - INDIANA MECHANICAL CODE, 2014 EDITION (IMC, 2012 EDITION, 675 IAC 18-1.6) - ENERGY CONSERVATION CODE, 2010 (ASHREA 90.1, 2007 EDITION, 675 IAC 19.3) EFFECTIVE CODES 08/13/21