HomeMy WebLinkAboutThe Olivia Tree Relocation revision 2021 LP stamped approvedAPPROVED
By Daren Mindham at 2:11 pm, Jul 25, 2015
----- -- -- - -■ - - ---- -•
_ _ _ - _ _ - - - _ -
-
1 ROW entin s to be installed by Others as part of street project
_ __ \- _. ,\ (3)Rihu-a p 9 T
{
I
- - - _
(1)Cer
�1 n _u (a) Cal-x
S7 s
,3 y
tj
INIX
y.
d
i■F l I
—(8) Phy-o?
[21 zsr-s.—�
(14) Cha-I—,
(2) Gin-b
— 9) Bux-x
I'dart
(zz��++) I-x
�19Chi-I f
�"-- (6) Rhu-a
0) Pan-h
, `—(2) Zel-s �(8) Bux-x
I (1)Gle-x �-
-- (6) Bux-x
(3) Rhu-a
2 Glnb
(3Cri-c-{--I (5):le
INTERIOR PARKING: 255 SPACES
1 tree + 5 shrubs/10 spaces
required: 26 tree + 128 shrubs
provided: 26 trees + 135 shrubs
PERIMETER PARKING
4 shed. trees - 20 shrub,vioo 1.f.
West: 180 Lf.
Required: 7 shade trees + 36 shrubs
Provided: see buffer requirements below
South: 653 I.f.
Required: 26 shade trees + 131 shrubs
Provided: 2 existing trees to remain + 25 Shade Trees + 131
shrubs
North: 63 Lf.
Required 2 Shade Trees + 13 Shrubs
Provided: 2 Shade Trees + 14 Shrubs
BUFFERS
Site Use: Multifamily
West: multifamily - 280 I.f.
Type A Buffer s de buffer: 3 Shade Trees � 2 Ornem.ntal Trees -15 Shrubs
Required: 9 shade trees + 6 ornamental trees + 42 shrubs
Proposed: 1 existing tree to remain + 8 shade trees + 6 ornamental
trees + 42 shrubs
South: multifamily - 751 I.f.
Required: 23 shade trees + 15 ornamental trees + 113 shrubs
Proposed: See Perimeter Parking Lot Requirement+ 15
0mamental trees
East: Parkway - 232 I.f. - Building within 20' of Right of Way. No
buffer required per Chapter 33.05.A Perimeter Bufferyard Table"
North: Parkway- 8051.f. - Front door provided within 20' of ROW.
No buffer required per Chapter 33.05.A Perimeter Bufferyard
Table" Extensive utilities exisfing through this corridor.
- `
STREET TREES
Old Meridian: 232 Lf. 1 Shade Tree/50 I.f. min included as part of
City project
Required: 5 Shade Trees
b
Provided: 0 Shade Trees - not adequate planting room
— J
w
West Main Street: 805 I.f.- included as part of City project
Lu nn -�
Required: 16 Shade Trees
z
Provided: 14 Shade Trees. - not able to plant within the utility
J
easements
x
r
INNOVATIVE LANDSCAPE DESIGN APPLICATION
<
5. 75 % of trees are to be native to Central Indiana
r
FOUNDATION PLANTINGS
Ill
Old Meridian Ovarley MU: No more Men 50% or font setback shall be paved.
Part of City Streetscape project.
MLXsiiiib,
Frontage for Mixed Use Areas (after West Main Street
Realignment): 9,300 s.f.
3 + (2) Nys-s— ),J f (2)Lilt— 17) Ile-v (1) Ulm-x (2) Cer-c (3) Nys-s (14) Vib-x (2) Cel-o
,, Gle-t (11
(4) Rhu-a - (1) Vib-x Ame-x -- (5) Ile-v
Cel-o Lk f • \%'J�
tcNd-11- t� 03 fie. -
PLANTING PLAN
Legend
General Landscape & Planting Notes
1. Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule and Planting Details for additional information.
2. All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architectto inspect all plant locations and plant bed
A \ Protected Root Zone, to be protected throughout
1
conditions prior to installation. On -site adjustments may be required.
1 construction. Refer to Specs. & Planting Details L110.
3. RootbalIs shall meet or exceed size standards as set forth in'Amedcan Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT.
4. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material.
5. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and
plant schedule requirements (i.e., spacing), unless otherwise directed by Landscape Architect Contractor to verify bed measurements and install appropriate
quantities as governed by plant spacing per schedule. Plant material quantities shown on plan are minimum quantities. Additional material may be needed to
meet spacing requirements and field conditions.
6. Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or sod treatment
7. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications. Contractor shall coordinate quantity and placement of topsoil.
Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specifications for topsoil source and placement requirements)
6. All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the Landscape Architect Any plant material installed in an incorrect
location, by the judgment of the Landscape Architect, shall be reinstalled at the Contractor's expense.
9. All plant beds shall receive 3' minimum of shredded hardwood bark mulch (unless otherwise noted).
% Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's satisfaction at no additional cost
11. The Contractor shall maintain all plant material and lawns until the project is fully accepted by the Landscape Architect, unless otherwise noted.
12. All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year after Final Acceptance.
13. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work.
14. Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall be installed using tree ph drainage.
15. Trees shall be matched in groups unless otherwise noted.
U a
b
U x
4Z 0
R
8 $
yl
r.
a s�pp
�3
UJI
LU Z
G � Q
Z Q
DU)z
w Q Z
0 > Q J
LU
J
0
UJILU
�U
Scope Drawings:
v:b
'u••'a"tu�I�wwm�me•"'�wM'�'•mry�+ wen
Revisions:
DATE ISSUE REASON
12-10.14 Bid Package 1 Add. 1
02-15.16 1Q -12
Issue Date Drawn By Checked By
09-11-15 JTS APP
Drawing Tge:
PLANTING
PLAN
°•i`'Sp' Sit R47f.'•.
No.
': 2002-132 -
EXPIRES 12/31/2017
EXPIRES 12 31 15
Dmvnng Number:
Li 30
20MProle. Numcer
3. 30