Loading...
HomeMy WebLinkAboutThe Olivia Tree Relocation revision 2021 LP stamped approvedAPPROVED By Daren Mindham at 2:11 pm, Jul 25, 2015 ----- -- -- - -■ - - ---- -• _ _ _ - _ _ - - - _ - - 1 ROW entin s to be installed by Others as part of street project _ __ \- _. ,\ (3)Rihu-a p 9 T { I - - - _ (1)Cer �1 n _u (a) Cal-x S7 s ,3 y tj INIX y. d i■F l I —(8) Phy-o? [21 zsr-s.—� (14) Cha-I—, (2) Gin-b — 9) Bux-x I'dart (zz��++) I-x �19Chi-I f �"-- (6) Rhu-a 0) Pan-h , `—(2) Zel-s �(8) Bux-x I (1)Gle-x �- -- (6) Bux-x (3) Rhu-a 2 Glnb (3Cri-c-{--I (5):le INTERIOR PARKING: 255 SPACES 1 tree + 5 shrubs/10 spaces required: 26 tree + 128 shrubs provided: 26 trees + 135 shrubs PERIMETER PARKING 4 shed. trees - 20 shrub,vioo 1.f. West: 180 Lf. Required: 7 shade trees + 36 shrubs Provided: see buffer requirements below South: 653 I.f. Required: 26 shade trees + 131 shrubs Provided: 2 existing trees to remain + 25 Shade Trees + 131 shrubs North: 63 Lf. Required 2 Shade Trees + 13 Shrubs Provided: 2 Shade Trees + 14 Shrubs BUFFERS Site Use: Multifamily West: multifamily - 280 I.f. Type A Buffer s de buffer: 3 Shade Trees � 2 Ornem.ntal Trees -15 Shrubs Required: 9 shade trees + 6 ornamental trees + 42 shrubs Proposed: 1 existing tree to remain + 8 shade trees + 6 ornamental trees + 42 shrubs South: multifamily - 751 I.f. Required: 23 shade trees + 15 ornamental trees + 113 shrubs Proposed: See Perimeter Parking Lot Requirement+ 15 0mamental trees East: Parkway - 232 I.f. - Building within 20' of Right of Way. No buffer required per Chapter 33.05.A Perimeter Bufferyard Table" North: Parkway- 8051.f. - Front door provided within 20' of ROW. No buffer required per Chapter 33.05.A Perimeter Bufferyard Table" Extensive utilities exisfing through this corridor. - ` STREET TREES Old Meridian: 232 Lf. 1 Shade Tree/50 I.f. min included as part of City project Required: 5 Shade Trees b Provided: 0 Shade Trees - not adequate planting room — J w West Main Street: 805 I.f.- included as part of City project Lu nn -� Required: 16 Shade Trees z Provided: 14 Shade Trees. - not able to plant within the utility J easements x r INNOVATIVE LANDSCAPE DESIGN APPLICATION < 5. 75 % of trees are to be native to Central Indiana r FOUNDATION PLANTINGS Ill Old Meridian Ovarley MU: No more Men 50% or font setback shall be paved. Part of City Streetscape project. MLXsiiiib, Frontage for Mixed Use Areas (after West Main Street Realignment): 9,300 s.f. 3 + (2) Nys-s— ),J f (2)Lilt— 17) Ile-v (1) Ulm-x (2) Cer-c (3) Nys-s (14) Vib-x (2) Cel-o ,, Gle-t (11 (4) Rhu-a - (1) Vib-x Ame-x -- (5) Ile-v Cel-o Lk f • \%'J� tcNd-11- t� 03 fie. - PLANTING PLAN Legend General Landscape & Planting Notes 1. Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule and Planting Details for additional information. 2. All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architectto inspect all plant locations and plant bed A \ Protected Root Zone, to be protected throughout 1 conditions prior to installation. On -site adjustments may be required. 1 construction. Refer to Specs. & Planting Details L110. 3. RootbalIs shall meet or exceed size standards as set forth in'Amedcan Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. 4. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material. 5. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i.e., spacing), unless otherwise directed by Landscape Architect Contractor to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule. Plant material quantities shown on plan are minimum quantities. Additional material may be needed to meet spacing requirements and field conditions. 6. Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or sod treatment 7. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications. Contractor shall coordinate quantity and placement of topsoil. Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specifications for topsoil source and placement requirements) 6. All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the Landscape Architect Any plant material installed in an incorrect location, by the judgment of the Landscape Architect, shall be reinstalled at the Contractor's expense. 9. All plant beds shall receive 3' minimum of shredded hardwood bark mulch (unless otherwise noted). % Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's satisfaction at no additional cost 11. The Contractor shall maintain all plant material and lawns until the project is fully accepted by the Landscape Architect, unless otherwise noted. 12. All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year after Final Acceptance. 13. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work. 14. Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall be installed using tree ph drainage. 15. Trees shall be matched in groups unless otherwise noted. U a b U x 4Z 0 R 8 $ yl r. a s�pp �3 UJI LU Z G � Q Z Q DU)z w Q Z 0 > Q J LU J 0 UJILU �U Scope Drawings: v:b 'u••'a"tu�I�wwm�me•"'�wM'�'•mry�+ wen Revisions: DATE ISSUE REASON 12-10.14 Bid Package 1 Add. 1 02-15.16 1Q -12 Issue Date Drawn By Checked By 09-11-15 JTS APP Drawing Tge: PLANTING PLAN °•i`'Sp' Sit R47f.'•. No. ': 2002-132 - EXPIRES 12/31/2017 EXPIRES 12 31 15 Dmvnng Number: Li 30 20MProle. Numcer 3. 30