HomeMy WebLinkAboutChange_Order__4_-_Lykins_Contracting,_Inc.; ($5,640.00); Hydrant Extensions; CO #4; Utilties 000uoign Envelope ID:nyn000 eFe4A88 APPROVED Y7XEi/~tE a,Jon^^erl°"der°,^,^,=Aug,**o, a-GNEERS J6NTCOU"CT """"°,~S COMMITTEE Change Order No. 4 Date ofIssuance: April 26, 2O2l Effective Date: (Per Owner Sbg-notunc Owner: City of Carmel Utilities Owner's Contract No.: Contractor: Lykioo Contracting, Inc. Contractor's Project No.: Engineer: Twcua|er Engineering, Inc. Engineer's Project Nu.: 206518.06.001 Project: Division&B West Cuouei and Home Place Contract Name: The Contract is modified as follows upon execution of this Change Order: Description: Lykins Contracting requested additional compensation for twelve (12) hydrant extensions on January 26, 2022. N/ess/erraviewed the request and determined justification for compensation. Ness/erond the City issued on email response mn February l9, 2D21agreeing to pay for five (5) 4f the hydrant extensions. Lykins provided additional justification by emailfor the hydrant extensions on March 24, 2021, Upon review, N/ess/er and the City agreed to pay for 10 of the 12 hydrant extensions. This change order adds $5,640 to Lykins'Contract Price. Attachments: Hydrant Extension Cost Summoryfrom Lykins, Email correspondence with Lykins Contracting, Inc. CHANGE |N CONTRACT PRICE CHANGE |N CONTRACT TIMES Original Contract Price: Original Contract Times: Substantial Completion: 570 $7'995.Z2O.00 Ready for Final Payment: 600 Days increase from previously approved Change Orders No. 1 Nu Change from previously approved Change Orders to No. 3 No. 1 to No. 3 : Substantial Completion: 135 $ 1'84U'QZ4.63 Ready for Final Payment: 135 Days Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: 705 $ 8'O]6,O44.63 Ready for Final Payment: 735 Days Increase of this Change Order: Increase of this Change Order: Substantial Completion: 0 $ 5'640-00 Ready for Final Payment: O Days Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial Completion: 705 $ 9'D41'6Q4.63 Ready for Final Payment: 735 Days RE ACCEPTED: ACCEPTED: By: By: By: � Ehgineer(ifhequined) Owner(Authorized Signature) Contractor(Authorized Signature) Title: Project Manager Title Title Date: 4/26/2021 Date Date e/coc~c-y4z'Change Order. Prepared and published 2013 by the Engineers Joint Contract Documents Committee. ou420-1 000uoign Envelope ID:nyn000 eF84A88 Andrew Gordon From: Andrew Gordon Sent: Friday,April 16, 2021 218 PM To: 'BnbStindt' Cc: Monte Gardner Subject: RE: Hydrant Extensions Bob, See below for Wessler's determination in RED (justified or not-justified) She|bourne 5TA4+S0 This line was parallel to existing gas and needed to be deeper so that reamer did not disturb the gas line. Justified, Lykims and VVesdershifted alignment based upon field discyssimn». Torrey Pines STA9+50 Unknown storm line(not wn drawings)caused extra depth. Justified 1061h STA8+SO Existing watermain tie-in depth created extra depth for this hydrant. JmstiOed'this was ended fu/{her west in anticipate of future tie in east of Central Ax~ on newly acquired 1.6" VViUowmere STA8+SD To avoid existing gas created extra depth for hydrant. Not justified, mo design urfield change. 106tn STA4+S0 To avoid the existing sewer and gas created this extra depth. Justified, Lyk|nsand VVessler shifted alignment based upon field discussions. 105^' 3TA9+SO To avoid the existing sewer and gas created this extra depth. Not justified, mudesign nr field change Queens Way STA9+0U To avoid the existing gas created this extra depth. Justified, existing gas that was avoided was not originally marked for incorporation ondrawings. |finagreeance, |will process the change order for Carmel tusign. Please advise...thanks. Andrew Gordon,P.E,C.F.M. | Project Manager U eerj 6219 South East Street Indianapolis Indiana 46227 P: 317-788-4807 [: 3l74OZ-2051 From:Andrew Gordon Sent: Friday, February l9' ZO21229PW1 To: Bob Stindt«bstindt@|ykinsinc.com> Cc: Monte Gardner<MonteG@wess|erenQineehn8.com> Subject: RE: Hydrant Extensions Bob, The City and Wcomlec agree with paying Lykiuo for(i) 24", (2) 10", and [2) d" extensions. These are where the City changed the installation type or added o hydrant that wasn't originally in the hid. This would total $2,060 instead of$6,670 that you were originally asking for. Let cus know your thoughts. Reasoning iushown below... '�-��� DocuSign Envelope ID:590D0BF9-FB77-43A8-955D-3B08FBF84A88 Carmel Hydrant Extension Summary SHT# STREET STA# SIZE 10 SHELBOURNE 4+50 24" Originally bid as HDD 10 SHELBOURNE 7+25 24" This hydrant was added per field chai 13 TORREY PINES 0+00 18" This hydrant was added per field chai 14 TORREY PINES 9+50 6" OrtgaHy bid as HID 17 QUEENSWAY 8+25 6" This Lydrant was added per field chai 18 QUEENS WAY CIRCLE 4+00 6" This hydrant as added per field chai 27 106TH 8+50 18" Originally bid as HOD 34 BROADWAY AVE 19+50 18" Changed from 01„ike Cut to HOD after 38 WILLOWMERE 9+50 12" Origilaliy bid as HOD 41 106TH 4+50 6" Originally bid as HDD 42 106TH 9+50 12" Originally *id as 'OD 19 QUEENS WAY CIRCLE 9+00 6" Originally bid as HDDl Andrew Gordon, PE.,C.FAI. I Project Manager II Wr-vstr,r-l-rqiinnel[DE,Inc 6219 South East Street Indianapolis Indiana 46227 P: 317-788-4807 C:317-402-2051 From: Bob Stindt<bstindtPlykinsinc.com> Sent:Tuesday,January 26, 2021 2:14 PM To: Monte Gardner<MonteG@wesslerengineering.com> Cc:Andrew Gordon <AndrewG@wesslerengineering.com> Subject: Hydrant Extensions **WARNING: External email, verify sender before opening attachments or clicking on links.** Monte, Better late than never. I have attached a CO breakdown along with location summary sheet for the hydrant extensions we have been discussing. Please let me know if you need anything else. Thanks, Bob Stindt GM —Operations 1111111111111,1111111,1111T,11 12783 N State Road UM 2 DocuSign Envelope ID:590D0BF9-FB77-43A8-955D-3608FBF84A88 Sunman, IN 47041 Office:812-623-2244 Fax:812-623-4258 Cell:513-515-8670 bstindtplylansinc.com wwwlykinsinccorn 3 DocuSign Envelope ID:590DOBF9-FB77-43A8-955D-3B08FBF84A88 Carmel Change Order LCO3 Hydrant Extensions PAGE 1 OF 3 �+ Additional Work Detail DATE: 1/26/21 REVISED. CHANGE ORDER NO: LC 003 CONTRACT WPN:206518.04.001 PROJECT: Carmel Water Sytems Improvements Division A&B FORCE ACCOUNT/EXTRA WORK Description: Hydrant Extensions are being required due to directional drilling at lower depths to avoid various utilities versus the contract planswith open cut method. EMPLOYEE REGULAR OVERTIME DOUBLETIME PAY HOURS RATE TOTAL SUPERINTENDENT 41.20 FOREMAN 6 6 36.20 $217.20 OPERATOR 6 6 34.98 $209.88 LABORER 6 6 24.82 $148.92 DUMP TRUCK DRIVER 22.82 TOTAL LABOR $576.00 (I) FICA 7.65% X LINE(1) $44.06 (2) FRINGES: SUPERINTENDENT HRS X $14.09 = FOREMAN 6 HRS X $14.09 = $84.54 OPERATOR 6 FIRS X $14.09 = $84.54 LABORER 6 FIRS X $12.96 = $77.76 DUMP TRUCK DRIVER FIRS X $12.96 = FIRS X = FIRS X = FIRS X = FIRS X = FIRS X = TOTAL FRINGES $246.84 (3) WORKMEN'S COMPENSATION 7.10% X LINE(1) $40.90 (4) BODILY INJURY INSURANCE 2.10% X LINE(1) $12.10 (5) PROPERTY DAMAGE INSURANCE 0.42% X LINE(1) $2.42 (6) STATE UNEMPLOYMENT 5.60% X LINE(1) $32.26 (7) FEDERAL UNEMPLOYMENT 0.95% X LINE(1) $5.47 (8) TRAVEL ALLOWANCE OR SUBSISTENCE (9) TOTAL. LINES (I)+(2)+(3)+(4)+(5)+(6)+(7)+(8) +(9) $960,05 (10) 15% X LINE (10) $144.01 (II) DocuSign Envelope ID:590D0BF9-FB77-43A8-955D-3B08FBF84A88 Carmel Change Order LCO3 Hydrant Extensions PAGE 2 OF 3 GRAND TOTAL LABOR: LINES (10)+(11) $1,104.06 (12) INSURANCE, TAXES : INSURANCE: [ 1.80% X LINES (12)+ (20) +(26) ] $166.33 (13) TAXES (14) TOTAL: LINES (13) + (14) $166.33 (15) 15% X LINE (15) $24.95 (16) GRAND TOTAL FOR INSURANCE, TAXES: LINES (15) +(16) $191.28 (17) MATERIALS : TOTAL MATERIALS $6,670,00 (18) 15% X LINE (18) $1,000.50 (19) GRAND TOTAL MATERIALS: LINES (18)+(19) $7,670.50 (20) EQUIPMENT : CONTRACTOR OWNED EQUIPMENT: MACHINERY OR SPECIAL EQUIPMENT BASE FUEIfMAINT TOTAL COST NO. OF EXTENSION PER HOUR HOURS Service Truck 1 $10.25 $13.48 $23.73 6 $142.38 85 Excavator 2 $28.48 $15.32 $43.80 6 $262.80 300 Skid Steer 3 $21.25 $19.10 $40.35 Sgl Axl Dump Truck 4 $22.75 $24.74 $47.49 Vactron Trailer 5 $38.40 $8.10 $46.50 225 Excavator 6 $55.55 47.23 $102.78 135 Excavator 7 $37.63 $29.95 $67.58 450 Excavator 8 $150.00 $87.52 $237.52 624 Wheel Loader 9 $80.00 $22.58 $102.58 310Backhoe 10 $27.71 $12.35 $40.06 Mack Triaxle Dump 11 $23.48 $16.90 $40.38 Mack Triaxle Dump 12 $23.48 $16.90 $40.38 350 Excavator 13 $97.63 $62.73 $160.36 Kenworth T800 Semi&Talbert Trailer 14 $46.20 $51.25 $97.45 2440 Drill Rig 15 $115.73 $15.38 $131.11 Mud Truck 16 $23.48 $16.90 $40.38 TOTAL CONTRACTOR OWNED EQUIPMENT $405.18 (21) RENTED EQUIPMENT (22) FUEL, LUBRICANTS, & TRANSPORTATION COSTS (23) TOTAL: LINES (21) +(22)+ (23) $405.18 (24) DocuSign Envelope ID:590D0BF9-FB77-43A8-955D-3B08FBF84A88 Carmel Change Order LCO3 Hydrant Extensions PAGE 3 OF 3 15% X LINE (24) $60.78 (25) GRAND TOTAL EQUIPMENT : LINES (24) + (25) $465.96 (26) SUBCONTRACTS : SUBCONTRACTS WEEK ENDING : DESCRIPTION : HOURS RATE AMOUNT TOTAL SUBCONTRACTS WEEK ENDING (27) TOTAL SUBCONTRACTS TO DATE (28) 10% X LINE(28), FOR FIRST $3,000.00 (29) 7% X BALANCE OF LINE(28),IF LINE (28) IS OVER$3,000 (30) GRAND TOTAL SUBCONTRACTS: LINES (28) + (29) + (30) (31) TOTAL: LINES (12), (17), (20), (26), & (31) $9,431.80 (32) 1.1% BOND RATE BASED UPON LINE (32) $103.75 (33) 10% X LINE(33) $10.38 (34) TOTAL EXTRA WORK : LINES (32) + (33) + (34) 59,545.93 (35) NOTES I) ATTACH COPIES OF DAILY TIME SHEETS SHOWING LABOR AND CON ISACTOR.OWNED EQUIPMENT 2) SUBCONTRACTORS USE PAGES I AND 2 AND PRIME CONTRACTORS ATTACH TO PAGE 3. 3) ATTACH BREAKDOWN FOR EACH INDIVIDUAL. DocuSign Envelope ID:590D0BF9-FB77-43A8-955D-3B08FBF84A88 Carmel Change Order LCO3 Hydrant Extensions Description: LC-03 Install Hydrant Extensions MATERIALS : Qty Unit Description Unit Cost Total Cost 2 EA 24" Hydrant Extension $950.00 $1,900.00 3 EA 18" Hydrant Extension $525.00 $1,575.00 2 EA 12" Hydrant Extension $515.00 $1,030.00 5 EA 6" Hydrant Extension $433.00 $2,165.00 Total Above $6,670.00 Total Materials $6,670.00 DocuSign Envelope ID:590D0BF9-FB77-43A8-955D-3B08FBF84A88 Carmel Hydrant Extension Summary SHT# STREET STA# SIZE 10 SHELBOURNE 4+50 24" 10 SHELBOURNE 7+25 24" 13 TORREY PINES 0+00 18" 14 TORREY PINES 9+50 6" 17 QUEENSWAY 8+25 6" 18 QUEENS WAY CIRCLE 4+00 6" 27 106TH 8+50 18" 34 BROADWAY AVE 19+50 18" 38 WILLOWMERE 9+50 12" 41 106TH 4+50 6" 42 106TH 9+50 12" 19 QUEENS WAY CIRCLE 9+00 6" DocuSign Envelope ID:590D0BF9-FB77-43A8-955D-3B08FBF84A88 Approved and Adopted this day of 8/18/2021 , 20 CITY OF CARMEL, INDIANA By and through its Board of Public Works and Safety BY: Not Present James Brainard, Presiding Officer Date: �DocuSigned by: `—6Es7i,Gui,u68 EnGu... Mary Ann Burke, Member Date: 8/18/2021 �DocuSigned by: Lavi Mot& iK A 1 6 434... Lor Wasson, Member Date: 8/18/2021 ATTEST: DocuSigned by: []—! WOWTA0 Sues oirgang, Clerk Date: 8/18/2021