Loading...
HomeMy WebLinkAbout11_GD1.06-SITE UTILITY DEMOLITION PLAN-NORTHMATCH LINE (NORTH/SOUTH) 3 3 4 4 4 4 6 6 77 TBM#3 = 775.53 ADJOINER MODIFY EXISTING CONCRETE PAVED SWALE IN THIS AREA TO MATCH PROPOSED GRADES 3 INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! ARCHITECT Carmel Clay Schools CONSULTANT Construction Documents WWW.FHAI.COM317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. 5201 East Main Street Carmel, Indiana 46033 CARMEL HARTMAN FIELD IMPROVEMENTS PROJECT NUMBER: 220127.00 PROJECT ISSUE DATE: May 12, 2021 DRAWN BY: HHW WWW.TLF-ENGINEERS.COM317-334-1500 3901 W 86TH ST #200, INDIANAPOLIS, IN 46268 REV. NO. DESCRIPTION DATE GD1.06 30 900 30 60 DEMOLITION KEYNOTES 1. RELOCATE PORTION OF EXISTING ELECTRICAL LINE AS REQUIRED TO INSTALL PROPOSED STORM SEWER. 2. REMOVE EXISTING STORM DRAIN. 3. REMOVE PORTION OF EXISTING STORM PIPE WHICH INTERFERES WITH PROPOSED CONSTRUCTION. 4. PROTECT EXISTING FIBER OPTIC LINE TO REMAIN IN PLACE. 5. PROTECT EXISTING WATER PUMP TO REMAIN IN PLACE. 6. PROTECT EXISTING ELECTRICAL LINE TO REMAIN IN PLACE. 7. PROTECT EXISTING LIGHT POLE TO REMAIN IN PLACE. 8. ADJUST UTILITY BOX TO NEW FINISH GRADE AND LOWER EXISTING UTILITY AS REQUIRED TO MEET MINIMUM COVER REQUIREMENTS. RELOCATE IF NECESSARY, COORDINATE WITH UTILITY OWNER. 9. CONTRACTOR TO REMOVE EXISTING UNDERDRAIN SYSTEM LOCATED WITHIN THE VARSITY FIELD. 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7. DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATE ALL ITEMS WHICH INTERFERE WITH NEW CONSTRUCTION. GENERAL NOTES SITE UTILITY DEMOLITION PLAN - NORTH DEMOLITION LEGEND APPROXIMATE LIMITS OF UTILITY OR SEWER LINE REMOVAL 08/19/21