Loading...
HomeMy WebLinkAbout22_G2.03-GRADING PLAN-SOUTHEAST1 MATCH LINE (NORTH/SOUTH) WTR WTR SAN SANWTR ST-103 RIM. = 780.05 ST-101 INV. 777.83 (N) ST-104 RIM. = 778.96 779.80 780.15 780.15 779.87 779.81 781.79 781.59 779.61 779.60 781.21 781.63 780.05 779.86 779.86780.05 780.05 780.05 779.68 779.60 779.51 BW 779.44 784.25 784.06 783.85 UNDERGROUND DETENTION CHAMBERS (SC-740) CHAMBER AREA = 196' x 102' MINIMUM FINISH GRADE ELEV. = 783.00 TOP OF STONE = 782.50 TOP OF CHAMBERS = 781.50 BOTTOM OF CHAMBERS = 779.00 BOTTOM OF STONE = 778.50 21 ROWS OF 27 CHAMBERS = 47,355 CFT. CONTRIBUTING DRAINAGE AREA = 3.16 ACRES 10 YR. DISCHARGE = 1.02 CFS 10 YR. STAGE ELEV.= 780.06 10 YR. STORAGE VOLUME = 0.49 AC/FT 100 YR. DISCHARGE = 2.03 CFS 100 YR. STAGE ELEV.= 781.20 100 YR. STORAGE VOLUME = 0.85 AC/FT 782.90 1 1 1 1 1 1 1 779.30 779.20 TW 781.27 781.27 BW 779.33 TW 781.27 ST-102 RIM. = 781.90 780.15BW 780.31 BW 780.34 TW 781.27 TW 781.27 BW 779.79 TW 781.27 779.60 BW 779.49 TW 781.27 BW 780.42 BW 780.60TW 782.75 TW 781.27 BW 781.00TW 782.75 BW 781.49 BW 782.18 TW 782.90 TW 783.04 BW 782.02 782.00 782.18 FF 782.20 FF 782.20 FF 780.87FF 780.87 781.30 780.85 780.33 780.75 780.75 780.54 781.79 TW 783.10783.10 782.71 780.26 779.83 FL 778.80 779.75 784.70 784.70 2 2 3 FL 778.99 FL 777.83FL 777.83 3 EXIST. STORAGE BUILDING (WEST SIDE) FINISH FLOOR ELEV.= 782.20 PROPOSED RESTROOM BUILDING (EAST SIDE) FINISH FLOOR ELEV.= 780.87 FL 781.17 MEG 786.70 784.20 784.32 ST-202 INV. 781.17 (W) BENCHMARKS: INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! USGS BENCHMARK INFORMATION ARCHITECT Carmel Clay Schools CONSULTANT Construction Documents WWW.FHAI.COM317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. 5201 East Main Street Carmel, Indiana 46033 CARMEL HARTMAN FIELD IMPROVEMENTS PROJECT NUMBER: 220127.00 PROJECT ISSUE DATE: May 12, 2021 DRAWN BY: HHW WWW.TLF-ENGINEERS.COM317-334-1500 3901 W 86TH ST #200, INDIANAPOLIS, IN 46268 REV. NO. DESCRIPTION DATE G2.03 GRADING PLAN - SOUTHEAST 30 900 30 60 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. GENERAL NOTES GRADING PLAN LEGEND EXISTING SPOT ELEVATION MATCH EXISTING GRADE TOP OF CURB BOTTOM OF CURB TOP OF WALL BOTTOM OF WALL FINISH FLOOR FLOWLINE EXISTING CONTOUR W/ ELEVATION PROPOSED CONTOUR W/ ELEVATION PROPOSED SPOT ELEVATION PROPOSED SURFACE DRAINAGE FLOW ARROW MEG TC BC FF 750.65 FL TW BW GRADING KEYNOTES 1. CONTRACTOR TO COORDINATE WITH OWNERS REPRESENTATIVE ON LOW SPOT REGRADING. APPROXIMATE AREAS HAVE BEEN DELINEATED WITHIN THE JV OUTFIELD. FINAL AREAS TO BE DETERMINED PRIOR TO CONSTRUCTION. SOD TO BE STRIPPED PRIOR TO GRADING ACTIVITY. 2. PROPOSED SWALE @ 1.0% MIN. SLOPE 3. BOTTOM OF DRY BASIN @ 1.0% MIN. SLOPE 08/19/21