HomeMy WebLinkAbout24_G2.05-EROSION CONTROL PLAN-SOUTHWESTSFSFSFSFSF SFSF SF SF WTR SAN WTR WTR SAN SAN WTR SAN SAN SANWTR SF SFSFS F SFSF 1 1 2 6 6 6 6 6 8 3 2 ST-104 ST-102 ST-103 ST-101 CONSTRUCTION LIMITS CONSTRUCTION LIMITS 6 6 UNDERGROUND DETENTION CHAMBERS MATCH LINE (NORTH/SOUTH) ST-202 ST-201 9 3 8 ISOLATOR ROW BMP 2 BENCHMARKS: INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what'sbelow. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! ARCHITECT Carmel Clay Schools CONSULTANT Construction Documents WWW.FHAI.COM317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. 5201 East Main Street Carmel, Indiana 46033 CARMEL HARTMAN FIELD IMPROVEMENTS PROJECT NUMBER: 220127.00 PROJECT ISSUE DATE: May 12, 2021 DRAWN BY: HHW WWW.TLF-ENGINEERS.COM317-334-1500 3901 W 86TH ST #200, INDIANAPOLIS, IN 46268 REV. NO. DESCRIPTION DATE G2.05 EROSION CONTROL PLAN - SOUTHWEST USGS BENCHMARK INFORMATIONEROSION CONTROL LEGEND CW PT SF 30 900 30 60 EROSION CONTROL NOTES 1. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MY BE REQUIRED BY THE INSPECTOR. 2. DURING CONSTRUCTION KEEP PAVEMENTS AND SIDEWALKS CLEAN AND WORK AREAS IN AN ORDERLY CONDITION. CLEAN WHEELS OF VEHICLES BEFORE LEAVING THE SITE TO AVOID TRACKING SOIL ONTO ROADS, WALKS, OR OTHER PAVED AREAS. 3. ALL PROPOSED EROSION AND SEDIMENT CONTROL SHALL BE IN CONFORMANCE WITH CHAPTER 600 OF THE CITY OF CARMEL STORMWATER TECHNICAL STANDARDS MANUAL, LATEST EDITION. DISCREPANCIES BETWEEN THE PLANS AND THE MANUAL SHALL NOT ALLEVIATE THE CONTRACTOR FROM ADHERING TO THE REQUIREMENTS AS SET FORTH IN THE MANUAL. 1. SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2. TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4. SEE EROSION CONTROL DETAILS ON SHEET G4.2 5. NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 6. UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 7. DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. GENERAL NOTES EROSION CONTROL KEYNOTES 1. SEDIMENT BAG INLET PROTECTION 2. TEMPORARY SEEDING 3. EROSION CONTROL BLANKET 4. CONCRETE WASHOUT 5. PORTABLE TOILETS 6. SILT FENCE 7. CONSTRUCTION ENTRANCE 8. ROCK DONUT 9. RIPRAP OUTLET CONTROL 08/19/21