Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Drainage Report
Drainage Report for Carmel Clay Schools Carmel High School Hartman Field Improvements 5201 E Main Street Carmel, Indiana 46033 Prepared by: TLF, Inc. 3901 West 86th Street, Suite 200 Indianapolis, IN 46268 Phone (317) 334-1500 TLF Project No: 2020-340 Submitted by: Brittany N. Heidenreich, PE Herb Windhorst May 12, 2021 Revised: July 27, 2021 Page 1 of 180 Carmel Clay Schools – Carmel High School Hartman Field Improvements May 12, 2021 Revised: July 27, 2021 TLF, Inc. Project No. 2020-340 Table of Contents Project Narrative I. Project Location II. Project Description III. Existing Drainage Conditions IV. Proposed Storm Sewer Design V. Proposed Drainage Conditions VI. Proposed Water Quality Design VII. Summary and Conclusions Appendices Appendix A - Maps · Site Location Map · Soils Map and Data · Flood Insurance Rate Map Appendix B – Existing Drainage Conditions · Existing Drainage Conditions Exhibits – B1 · Existing Drainage Conditions ICPR Model Appendix C - Proposed Storm Sewer Calculations · Rainfall Data · Inlet Basin Area Exhibits – C1 · Inlet Runoff Coefficient Calculations · Storm Sewer System Calculations · Storm Sewer Structure Data Table · Casting Capacity Calculations · Hydraulic Grade Line Calculations – 10YR and 100YR · Typical Swale Channel Design Capacity Calculation – 10YR and 100YR Appendix D - Proposed Drainage Conditions · Proposed Drainage Conditions Exhibits – D1 · Proposed Overall Grading Plan – G2.0 · Proposed Drainage Conditions Runoff Curve Number Calculations · Proposed Drainage StormTech Cumulative Storage Volumes · Proposed East Basin Storage Volume · Proposed Drainage Conditions ICPR Model – Model 1 · Proposed Drainage Conditions ICPR Model – Model 2 · Proposed Storage Capacity Calculations – Model 2 Page 2 of 180 Carmel Clay Schools – Carmel High School Hartman Field Improvements May 12, 2021 TLF, Inc. Project No. 2020-340 Appendix E - Proposed Water Quality Calculations · Water Quality Curve Number Calculation · Water Quality ICPR Model · Water Quality Unit Selection Table · Water Quality Unit Detail · Isolator Row Sizing Calculation · StormTech Isolator Row Letter Appendix F – Previous Project Information · Carmel Clay Educational Services Building and Baseball Field Construction Documents dated September 6, 1985 · Hydrology Report For Facilities and Transportation Building dated 8-3-99 Appendix G – General Project Information · Certificate of Liability Insurance · Waiver of Technical Standards Requests · Downstream Photos of Carmel School Arm of Mitchner Drain Page 3 of 180 Carmel Clay Schools – Carmel High School Hartman Field Improvements May 12, 2021 TLF, Inc. Project No. 2020-340 Project Narrative I. Project Location The proposed project is located at 5201 East Main Street, Carmel, Indiana. The site does not lie within a floodway or floodplain per FEMA panel 18057C0227G effective November 19, 2014. Refer to the Site Location Map and Flood Insurance Rate Map provided in Appendix A. II. Project Description The proposed site improvements will consist of a new parking lot addition, new concrete sidewalks, new restroom building and a new synthetic field for the varsity baseball field. Proposed stormwater infrastructure will include a field underdrain system, storm sewers and underground detention chambers. The existing east dry detention basin will be modified to maximize detention volume in the developed condition. This project will disturb approximately 8.5 acres. The Junior Varsity baseball field will remain largely undisturbed with the exception of a few low areas that will be filled with topsoil removed from other areas on site. IDEM Rule 5 NOI will be a water quality permit required for construction activities associate with this project site. III. Existing Drainage Conditions The project site consists of existing baseball playing fields and pervious lawn areas that mostly sheet drain in a northeasterly direction to the existing east dry detention basin. Approximately 0.58 acres of the project site (Varsity left field) drains to the existing west dry detention basin which is interconnected to the East Basin. Approximately 2.74 acres of the project site drains to the existing south basin. The remainder of the project site drains to the east basin. The site soils mainly consist of Ockley silt loam-Urban land complex and has a “B” hydrologic soil group rating, see Soil Map and related soil data in Appendix A. An Existing Drainage Conditions Exhibit is provided in Appendix B. Discharge from the site is an existing 24” RCP which is located on the north side of the existing east basin which is part of the Carmel School Arm of the Mitchner Legal Drain. An existing drainage report from the 1999 Facilities and Transportation Building Project has been provided in Appendix F. The drainage report for the original 1985 construction of the ESC and fields could not be located, however the construction documents have been included in Appendix F. The existing conditions model was recreated using ICPR4.07.06. The stage-storage table utilizes a recent topographic survey of the west and east basins. The basin information for the west basin was pulled from the existing drainage report. The east basin information was delineated per the recent topographic survey. The results of the model can be found below. In the existing condition model, the west basin overtops the top of bank in the 100-year storm, whereas in the previous report the 100-yr elevation was 778.88. Page 4 of 180 Carmel Clay Schools – Carmel High School Hartman Field Improvements May 12, 2021 TLF, Inc. Project No. 2020-340 Existing Condition Discharges and Elevations 10-yr 100-yr Discharge (cfs) Stage (feet) Discharge (cfs) Stage (feet) West Basin 7.51 777.11 8.11 779.22 East Basin 10.81 774.47 12.66 776.43 IV. Proposed Storm Sewer Design The proposed storm sewer is designed to convey the 10-year stormwater runoff flows from the developed inlet basins. The storm sewer has been designed via the rational method in accordance with the City of Carmel Stormwater Technical Standards Manual. The Proposed Storm Sewer Exhibits, calculations, and pipe sizing are provided in Appendix C. V. Proposed Drainage Design The hydrologic soil group rating for the developed site has been changed from the initially determined group rating “B” to the next less infiltrating group rating “C”. The stormwater runoff from the project site will drain to the modified existing east basin via new storm sewer system and sheet flow. The project improvements will increase the total impervious area by approximately 0.9 acres. The varsity baseball field will have new synthetic turf that will include an underdrain drainage system that will drain to a new underground detention chamber facility and will discharge at a restricted release rate to the new storm sewer system. The new parking lot addition, grass area north of the varsity field, concrete walk and grass area south of the varsity field, southwest portion of the junior varsity field and concrete walk between both fields will also drain to the new storm sewer system. The majority of the existing junior varsity field will continue to sheet drain to the east basin. The outfall from the existing west basin will continue to drain to the east basin through the existing pipe underneath the parking lot. The east basin will be modified to maximize available storage and to store the additional runoff from the proposed project. In addition, approximately 2.74 acres of the south basin that currently drains offsite to Badger Field, will be diverted into the modified east basin to provide drainage relief in that area per a request from the City of Carmel. The east basin has been expanded by 1.6 ac-ft from 5.5 ac-ft to 7.1 ac-ft of storage. The synthetic turf field (East 4) is 3.16 acres with a time of concentration of 10 minutes and curve number of 98 (CN=98). Synthetic turf is modeled in ICPR with a CN of 98 to model the direct contribution of runoff to the underlying underdrains and underground storage, similar to the modeling of a wet pond. However, in reality, it is a highly permeable surface. Runoff from East 4 contributes to the underdrain and underground storage and is released at a controlled rate. Page 5 of 180 Carmel Clay Schools – Carmel High School Hartman Field Improvements May 12, 2021 TLF, Inc. Project No. 2020-340 The field underground detention has been designed such that the 10-yr post developed peak discharge rate is less than 0.1 cfs/acre and the 100-yr post developed peak discharge rate is less than 0.3 cfs/acre. In order to meet the 10-yr allowable discharge, an orifice size less than 6” in diameter is required. To account for this, two different model scenarios were completed to ensure that sufficient detention volume is provided. The first model (utilizing the sizing outlet control structure) was ran using the orifice sizes required to meet the allowable discharge rates. The second model orifices were increased to a 6” minimum diameter. The Educational Services Center has a future 3,000 sft building addition and sidewalk and path expansions. This future impervious area has been accounted for in the calculations for the East 3 and West curve numbers. The tables below indicate the results of ICPR models for each detention basin. Comparing the existing model to Model 2, the 100-yr elevation of the west basin decreases by 0.08 feet, the 100-yr elevation of the east basin increases by 0.09 feet, and the overall site discharge from the east basin decreases by 0.52 cfs. Proposed Condition Discharges and Elevations – Model 1 10-yr 100-yr Existing/ Allowable (cfs) Discharge (cfs) Stage (feet) Existing/ Allowable (cfs) Discharge (cfs) Stage (feet) West Basin - 7.25 777.09 - 7.68 779.12 East Basin 10.81 10.65 774.75 12.66 12.04 776.37 Underground Detention Chambers 0.32 0.32 780.52 0.95 0.93 782.41 Model 1 = 3” orifice at 778.40; 3.75” orifice at 780.50 Proposed Condition Discharges and Elevations – Model 2 10-yr 100-yr Existing/ Allowable (cfs) Discharge (cfs) Stage (feet) Existing/ Allowable (cfs) Discharge (cfs) Stage (feet) West Basin - 7.08 777.13 - 7.49 779.14 East Basin 10.81 10.72 774.85 12.66 12.14 776.52 Underground Detention Chambers 0.32 1.02 780.06 0.95 2.03 781.20 Model 2 = 6” orifice at 778.40; 6” orifice at 780.50 The downstream receiving system for the east basin and the overall site is the Carmel School Arm of the Mitchner Legal Drain. This arm of the legal drain was built as part of the 1985 construction of the school for the existing runoff rates, which have been decreased as part of this project. Photographs of the site, surrounding area, and the downstream system and outlet into the Mitchner Drain have been included in Appendix G. Page 6 of 180 Carmel Clay Schools – Carmel High School Hartman Field Improvements May 12, 2021 TLF, Inc. Project No. 2020-340 VI. Proposed Water Quality Design The proposed site improvements will utilize a manufactured water quality device (Aqua- Swirl XC-7 CCW) to meet the water quality requirements of the 1-inch 24-hour event for the entire disturbed area of 8.5 acres using the City of Indianapolis Sizing Chart. This water quality unit will be installed on-line of the new 24” HDPE prior to discharge into the east basin, where the on-line maximum flow rate is not exceeded. The proposed improvements also includes a underground detention system with an isolator row for water quality treatment. The stormwater quality calculations can be found in Appendix E. VII. Summary and Conclusions The drainage from the proposed site has been designed in accordance with the City of Carmel Stormwater Technical Standards Manual limiting stormwater runoff from the site, therefore no adverse impacts are anticipated to affect adjacent or downstream landowners. This project will disturb approximately 8.5 acres of the overall site. Erosion control measures will be implemented before construction begins and maintained during construction to comply with IDEM Rule 5, Notice of Intent for Construction and Land Disturbance. Page 7 of 180 Carmel Clay Schools – Carmel High School Hartman Field Improvements May 12, 2021 TLF, Inc. Project No. 2020-340 Appendix A Maps Page 8 of 180 SITE LOCATION MAP PROJECT SITE Page 9 of 180 PROJECT SITE Page 10 of 180 Page 11 of 180 PROJECT SITE Page 12 of 180 Carmel Clay Schools – Carmel High School Hartman Field Improvements May 12, 2021 TLF, Inc. Project No. 2020-340 Appendix B Existing Drainage Conditions Page 13 of 180 SOUTH BASIN 12.40 ACRES WEST BASIN (INCLUDES OFF-SITE WEST) 17.87 ACRES CN = 84 tc = 89 min. TOTAL EAST BASIN 13.66 ACRES CN = 80 tc = 34 min. EAST 1 1.83 ACRES CN = 86 EAST 2 2.52 ACRES CN = 96 EAST 3 9.31 ACRES CN = 74 OFF-SITE WEST OFF-SITE EAST 0.25 ACRES CN = 74 tc = 10 min. 50 150050100 ARCHITECT CARMEL CLAY SCHOOLS REV. NO.DESCRIPTION DATE CONSULTANT NOT FOR CONSTRUCTIONTAC SUBMITTAL WWW.FHAI.COM317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. 5201 E MAIN STREET CARMEL, IN 46033 CARMEL HIGH SCHOOL HARTMAN FIELD IMPROVEMENTS PROJECT NUMBER: 220127.00 PROJECT ISSUE DATE: 02/17/2021 DRAWN BY: HHW PROJECT 220127.00 WWW.TLF-ENGINEERS.COM317-334-1500 3901 W 86TH ST #200, INDIANAPOLIS, IN 46268 B1 EXISTING DRAINAGE CONDITIONS Page 14 of 180 1 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Existing Conditions\2021-01-26\5/12/2021 10:15 Background Image: Existing Simple Basin: East 1 Scenario:Icpr3 Node:NZA-0090 Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:5.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:1.8300 ac Curve Number:86.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Simple Basin: East 2 Page 15 of 180 2 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Existing Conditions\2021-01-26\5/12/2021 10:15 Scenario:Icpr3 Node:NZA-0100 Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:5.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:2.5200 ac Curve Number:96.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Simple Basin: East Basin 3 Scenario:Icpr3 Node:East Basin Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:34.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:9.3100 ac Curve Number:74.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Simple Basin: Offsite East Scenario:Icpr3 Node:East Basin Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:10.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Page 16 of 180 3 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Existing Conditions\2021-01-26\5/12/2021 10:15 Unit Hydrograph:UH484 Peaking Factor:484.0 Area:0.2500 ac Curve Number:74.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Simple Basin: West Basin Scenario:Icpr3 Node:West Basin Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:89.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:17.8700 ac Curve Number:84.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Node: East Basin Scenario:Icpr3 Type:Stage/Area Base Flow:0.00 cfs Initial Stage:771.47 ft Warning Stage:779.00 ft Stage [ft]Area [ac]Area [ft2] 771.47 0.0000 0 772.00 0.0040 174 773.00 0.0900 3920 774.00 0.2770 12066 775.00 0.4810 20952 776.00 0.6660 29011 777.00 0.9640 41992 Page 17 of 180 4 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Existing Conditions\2021-01-26\5/12/2021 10:15 Stage [ft]Area [ac]Area [ft2] 778.00 1.5670 68259 779.00 2.8370 123580 Comment: Node: NTZ-0070 Scenario:Icpr3 Type:Time/Stage Base Flow:0.00 cfs Initial Stage:766.00 ft Warning Stage:773.00 ft Boundary Stage: Year Month Day Hour Stage [ft] 0 0 0 0.0000 766.00 0 0 0 99999.0000 766.00 Comment: Node: NZA-0090 Scenario:Icpr3 Type:Stage/Area Base Flow:0.00 cfs Initial Stage:773.63 ft Warning Stage:778.08 ft Stage [ft]Area [ac]Area [ft2] 0.00 0.0000 0 Comment: Node: NZA-0100 Scenario:Icpr3 Type:Stage/Area Base Flow:0.00 cfs Initial Stage:773.05 ft Warning Stage:777.40 ft Comment: Page 18 of 180 5 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Existing Conditions\2021-01-26\5/12/2021 10:15 Node: West Basin Scenario:Icpr3 Type:Stage/Area Base Flow:0.00 cfs Initial Stage:774.64 ft Warning Stage:779.00 ft Stage [ft]Area [ac]Area [ft2] 774.24 0.0000 0 775.00 0.0430 1873 776.00 0.3290 14331 777.00 0.7610 33149 778.00 1.0920 47568 779.00 1.3380 58283 779.50 1.3380 58283 Comment: Pipe Link: L-0040P Scenario:Icpr3 From Node:West Basin To Node:NZA-0090 Link Count:1 Flow Direction:Both Damping:0.0000 ft Length:134.00 ft FHWA Code:0 Entr Loss Coef:0.50 Exit Loss Coef:0.00 Bend Loss Coef:0.00 Bend Location:0.00 dec Energy Switch:Energy Upstream Downstream Invert:774.64 ft Invert:773.63 ft Manning's N:0.0130 Manning's N:0.0130 Geometry: Circular Geometry: Circular Max Depth:1.25 ft Max Depth:1.25 ft Bottom Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Top Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Comment: Pipe Link: L-0050P Scenario:Icpr3 From Node:NZA-0090 To Node:NZA-0100 Link Count:1 Flow Direction:Both Damping:0.0000 ft Length:144.00 ft FHWA Code:0 Entr Loss Coef:0.50 Upstream Downstream Invert:773.73 ft Invert:773.15 ft Manning's N:0.0130 Manning's N:0.0130 Geometry: Circular Geometry: Circular Max Depth:1.75 ft Max Depth:1.75 ft Bottom Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Page 19 of 180 6 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Existing Conditions\2021-01-26\5/12/2021 10:15 Exit Loss Coef:0.00 Bend Loss Coef:0.00 Bend Location:0.00 dec Energy Switch:Energy Top Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Comment: Pipe Link: L-0060P Scenario:Icpr3 From Node:NZA-0100 To Node:East Basin Link Count:1 Flow Direction:Both Damping:0.0000 ft Length:219.00 ft FHWA Code:0 Entr Loss Coef:0.50 Exit Loss Coef:0.00 Bend Loss Coef:0.00 Bend Location:0.00 dec Energy Switch:Energy Upstream Downstream Invert:773.05 ft Invert:772.32 ft Manning's N:0.0130 Manning's N:0.0130 Geometry: Horizontal Ellipse Geometry: Horizontal Ellipse Max Depth:2.00 ft Max Depth:2.00 ft Bottom Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Top Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Comment: Pipe Link: L-0070P Scenario:Icpr3 From Node:East Basin To Node:NTZ-0070 Link Count:1 Flow Direction:Both Damping:0.0000 ft Length:2150.00 ft FHWA Code:0 Entr Loss Coef:0.50 Exit Loss Coef:0.00 Bend Loss Coef:0.00 Bend Location:0.00 dec Energy Switch:Energy Upstream Downstream Invert:771.48 ft Invert:766.00 ft Manning's N:0.0130 Manning's N:0.0130 Geometry: Circular Geometry: Circular Max Depth:2.00 ft Max Depth:2.00 ft Bottom Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Top Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Comment: Simulation: DEV10 Page 20 of 180 7 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Existing Conditions\2021-01-26\5/12/2021 10:15 Scenario:Icpr3 Run Date/Time:2/16/2021 11:30:37 AM Program Version:ICPR4 4.07.06 General Run Mode:Normal Year Month Day Hour [hr] Start Time:0 0 0 0.0000 End Time:0 0 0 60.0000 Hydrology [sec]Surface Hydraulics [sec] Min Calculation Time:60.0000 0.1000 Max Calculation Time:60.0000 Output Time Increments Hydrology Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 13.0000 15.0000 Surface Hydraulics Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 13.0000 15.0000 Restart File Save Restart:False Resources & Lookup Tables Resources Lookup Tables Rainfall Folder:ICPR3 Boundary Stage Set: Extern Hydrograph Set: Unit Hydrograph Folder: ICPR3 Curve Number Set: Green-Ampt Set: Vertical Layers Set: Impervious Set: Tolerances & Options Time Marching:SAOR IA Recovery Time:24.0000 hr Max Iterations:6 Page 21 of 180 8 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Existing Conditions\2021-01-26\5/12/2021 10:15 Over-Relax Weight Fact: 0.5 dec dZ Tolerance:0.0010 ft Smp/Man Basin Rain Opt: Global Max dZ:1.0000 ft Link Optimizer Tol:0.0001 ft Rainfall Name:SCSII-24 Rainfall Amount:3.83 in Edge Length Option:Automatic Storm Duration:24.0000 hr Dflt Damping (1D):0.0050 ft Min Node Srf Area (1D): 113 ft2 Energy Switch (1D):Energy Comment: EXISTING CONDITIONS 10 YEAR/24 HOUR STORM Simulation: DEV100 Scenario:Icpr3 Run Date/Time:2/16/2021 11:44:28 AM Program Version:ICPR4 4.07.06 General Run Mode:Normal Year Month Day Hour [hr] Start Time:0 0 0 0.0000 End Time:0 0 0 60.0000 Hydrology [sec]Surface Hydraulics [sec] Min Calculation Time:60.0000 0.1000 Max Calculation Time:60.0000 Output Time Increments Hydrology Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 12.0000 1.0000 0 0 0 12.4000 5.0000 0 0 0 15.0000 15.0000 Surface Hydraulics Page 22 of 180 9 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Existing Conditions\2021-01-26\5/12/2021 10:15 Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 12.0000 1.0000 0 0 0 12.4000 5.0000 0 0 0 15.0000 15.0000 Restart File Save Restart:False Resources & Lookup Tables Resources Lookup Tables Rainfall Folder:ICPR3 Boundary Stage Set: Extern Hydrograph Set: Unit Hydrograph Folder: ICPR3 Curve Number Set: Green-Ampt Set: Vertical Layers Set: Impervious Set: Tolerances & Options Time Marching:SAOR IA Recovery Time:24.0000 hr Max Iterations:6 Over-Relax Weight Fact: 0.5 dec dZ Tolerance:0.0010 ft Smp/Man Basin Rain Opt: Global Max dZ:1.0000 ft Link Optimizer Tol:0.0001 ft Rainfall Name:Scsii-24 Rainfall Amount:6.46 in Edge Length Option:Automatic Storm Duration:24.0000 hr Dflt Damping (1D):0.0050 ft Min Node Srf Area (1D): 113 ft2 Energy Switch (1D):Energy Comment: EXISTING CONDITIONS 100 YEAR/24 HOUR STORM Simulation: DEV2 Scenario:Icpr3 Run Date/Time:1/26/2021 12:50:15 PM Program Version:ICPR4 4.07.06 Page 23 of 180 10 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Existing Conditions\2021-01-26\5/12/2021 10:15 General Run Mode:Normal Year Month Day Hour [hr] Start Time:0 0 0 0.0000 End Time:0 0 0 60.0000 Hydrology [sec]Surface Hydraulics [sec] Min Calculation Time:60.0000 0.1000 Max Calculation Time:60.0000 Output Time Increments Hydrology Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 13.0000 15.0000 Surface Hydraulics Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 13.0000 15.0000 Restart File Save Restart:False Resources & Lookup Tables Resources Lookup Tables Rainfall Folder:ICPR3 Boundary Stage Set: Extern Hydrograph Set: Unit Hydrograph Folder: ICPR3 Curve Number Set: Green-Ampt Set: Vertical Layers Set: Impervious Set: Tolerances & Options Time Marching:SAOR IA Recovery Time:24.0000 hr Max Iterations:6 Over-Relax Weight Fact: 0.5 dec dZ Tolerance:0.0010 ft Smp/Man Basin Rain Opt: Global Page 24 of 180 11 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Existing Conditions\2021-01-26\5/12/2021 10:15 Max dZ:1.0000 ft Link Optimizer Tol:0.0001 ft Rainfall Name:SCSII-24 Rainfall Amount:2.66 in Edge Length Option:Automatic Storm Duration:24.0000 hr Dflt Damping (1D):0.0050 ft Min Node Srf Area (1D): 113 ft2 Energy Switch (1D):Energy Comment: DEVELOPED CONDITIONS DETENTION POND DESIGN 2 YEAR/24 HOUR STORM Simulation: DEV50 Scenario:Icpr3 Run Date/Time:1/26/2021 12:51:21 PM Program Version:ICPR4 4.07.06 General Run Mode:Normal Year Month Day Hour [hr] Start Time:0 0 0 0.0000 End Time:0 0 0 60.0000 Hydrology [sec]Surface Hydraulics [sec] Min Calculation Time:60.0000 0.1000 Max Calculation Time:60.0000 Output Time Increments Hydrology Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 13.0000 15.0000 Surface Hydraulics Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 13.0000 15.0000 Restart File Page 25 of 180 12 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Existing Conditions\2021-01-26\5/12/2021 10:15 Save Restart:False Resources & Lookup Tables Resources Lookup Tables Rainfall Folder:ICPR3 Boundary Stage Set: Extern Hydrograph Set: Unit Hydrograph Folder: ICPR3 Curve Number Set: Green-Ampt Set: Vertical Layers Set: Impervious Set: Tolerances & Options Time Marching:SAOR IA Recovery Time:24.0000 hr Max Iterations:6 Over-Relax Weight Fact: 0.5 dec dZ Tolerance:0.0010 ft Smp/Man Basin Rain Opt: Global Max dZ:1.0000 ft Link Optimizer Tol:0.0001 ft Rainfall Name:SCSII-24 Rainfall Amount:5.52 in Edge Length Option:Automatic Storm Duration:24.0000 hr Dflt Damping (1D):0.0050 ft Min Node Srf Area (1D): 113 ft2 Energy Switch (1D):Energy Comment: DEVELOPED CONDITIONS DETENTION POND DESIGN 50 YEAR/24 HOUR STORM Page 26 of 180 1D Nodes - Max 1 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Existing Conditions\2021-01-26\2/16/2021 17:19 Sim Node Name Warning Stage [ft]Maximum Stage [ft]Time to Maximum Stage [hrs]Maximum Total Inflow Rate [cfs]Time to Maximum Total Inflow Rate [hrs]Maximum Total Outflow Rate [cfs]Time to Maximum Total Outflow Rate [hrs] DEV10 East Basin 779.00 774.47 12.9001 24.11 12.0219 10.81 12.9248 DEV10 NTZ-0070 773.00 766.00 0.0000 10.81 12.9248 0.00 0.0000 DEV10 West Basin 779.00 777.11 13.8766 15.81 12.9001 7.51 13.9131 DEV100 East Basin 779.00 776.43 13.2678 41.94 12.0174 12.66 13.2885 DEV100 NTZ-0070 773.00 766.00 0.0000 12.66 13.2885 0.00 0.0000 DEV100 West Basin 779.00 779.22 14.6040 32.88 12.8669 8.11 15.9546 5/12/2021 10:16 Page 27 of 180 Carmel Clay Schools – Carmel High School Hartman Field Improvements May 12, 2021 TLF, Inc. Project No. 2020-340 Appendix C Proposed Storm Sewer Calculations Page 28 of 180 Description:Carmel - Hartman Field Reviewing Entity:City of Carmel Job #:2020340 Date:02/08/21 Duration Duration (min)(hr)2-Year 5-Year 10-Year 25-Year 50-Year 100-Year 5 0.083 4.63 5.43 6.12 7.17 8.09 9.12 10 0.167 3.95 4.63 5.22 6.12 6.90 7.78 30 0.5 2.46 2.88 3.25 3.81 4.29 4.84 60 1 1.54 1.80 2.03 2.38 2.68 3.03 120 2 0.83 0.95 1.11 1.37 1.60 1.87 180 3 0.59 0.72 0.84 1.04 1.22 1.42 360 6 0.35 0.43 0.50 0.62 0.72 0.85 720 12 0.20 0.24 0.29 0.35 0.41 0.48 1440 24 0.11 0.14 0.16 0.20 0.23 0.27 Rainfall Intensity (in/hr) City of Carmel Data Job Information RAINFALL INTENSITIES & DEPTHS Frequency Page 29 of 180 TBM#2 = 791.71 TBM#3 = 775.53 TBM#1 = 782.26 THE GRAY ESTATE LOT 1 P.C. 3, SLIDE 557 INSTR. #2005001106 TBM#2 = 791.71 TBM#3 = 775.53 TBM#1 = 782.26 THE GRAY ESTATE LOT 1 P.C. 3, SLIDE 557 INSTR. #2005001106 STSTST STSTSTSTST ST STSTSTST ST SAN SANWTR WTR STR. 110 0.30 ACRES STR. 111 0.27 ACRES STR. 106 0.48 ACRES STR. 107 STR. 108 STR. 109 0.44 ACRES STR. 105 STR. 112 STR. 113 STR. 114 STR. 102 STR. 104 0.24 ACRES STR. 103 0.53 ACRES STR. 101 1.04 ACRES VARSITY FIELD UNDERDRAIN SYSTEM AND UNDERGROUND DETENTION CHAMBERS (SC-740) AREA = 3.16 ACRES 40 12004080 ARCHITECT CARMEL CLAY SCHOOLS REV. NO.DESCRIPTION DATE CONSULTANT NOT FOR CONSTRUCTIONTAC SUBMITTAL WWW.FHAI.COM317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. 5201 E MAIN STREET CARMEL, IN 46033 CARMEL HIGH SCHOOL HARTMAN FIELD IMPROVEMENTS PROJECT NUMBER: 220127.00 PROJECT ISSUE DATE: 02/17/2021 DRAWN BY: HHW PROJECT 220127.00 WWW.TLF-ENGINEERS.COM317-334-1500 3901 W 86TH ST #200, INDIANAPOLIS, IN 46268 C1 INLET BASIN AREAS Page 30 of 180 Carmel - Hartman Field - Runoff Coefficient Roof 0.90 - Grass 0.30 - Pavement 0.85 - Roof Area Pervious Area Pavement Area Total Area Weighted Runoff Coefficient Weighted Curve Number (acres)(acres)(acres)(acres)C CN 101 101 - 0.81 0.43 1.24 0.49 - 102 102 - - -- - - 103 103 - 0.23 0.19 0.42 0.55 - 104 104 - 0.19 0.05 0.24 0.41 - 105 105 - - -- - - 106 106 - 0.48 -0.48 0.30 - 107 107 - 0.01 -0.01 0.30 - 108 108 - 1.10 -1.10 0.30 - 109 109 - 0.44 -0.44 0.30 - 110 110 - 0.07 0.23 0.30 0.72 - 111 111 - 0.06 0.21 0.27 0.73 - 112 112 - - -- - - 113 113 - - -- - - 114 114 - - -- - - Inlet Runoff Coefficient Calculations Job Information City of Carmel 2020-340 Basin Structure Description: Entity: Job #: Date: Page 31 of 180 Description:Carmel - Hartman Field Reviewing Entity: Job #: Date: 10-yr Entity Data Invert Drop 0.1 INLET CASTING TO INLET CASTING INLET c AREA c AREA INLET CASTING CUM. cA Tc Tcum CASTING INLET CASTING INLET Q CUM. Q U.S. D.S. U.S. D.S. U.S. D.S (ft)(acres)(acres)(min)(min)(CFS)(CFS)(inches)(%)(cfs)(%)(ft/sec)(ft)(ft/sec)(min)(ft)(ft)(ft)(ft)(ft)(ft) 101 102 289.62 HDPE 0.49 1.24 - - 0.61 0.61 0.61 5.00 5.00 - - 6.12 6.12 3.72 3.72 15 0.30 0.012 3.83 97% 3.12 0.99 3.56 1.55 - 781.83 777.83 776.96 - 3.43 102 104 28.75 HDPE - - - - - - 0.61 - 6.55 - - - 5.84 - 3.55 15 0.30 0.012 3.83 93% 3.12 0.95 3.55 0.15 781.83 778.96 776.86 776.77 3.53 0.75 103 104 107.80 HDPE 0.55 0.42 - - 0.23 0.23 0.23 5.00 5.00 - - 6.12 6.12 1.41 1.41 12 0.30 0.012 2.11 67% 2.69 0.60 2.88 0.67 780.05 778.96 777.10 776.77 1.79 1.02 104 105 142.69 HDPE 0.41 0.24 - - 0.10 0.10 0.94 5.00 6.70 - - 6.12 5.81 0.61 5.46 18 0.30 0.012 6.23 88% 3.53 1.09 3.98 0.67 778.96 780.00 776.67 776.25 0.58 2.05 105 112 80.06 HDPE - - - - - - 0.94 - 7.37 - - - 5.69 - 5.34 18 0.30 0.012 6.23 86% 3.53 1.07 3.96 0.38 780.00 780.44 776.15 775.91 2.15 2.83 106 107 56.89 HDPE 0.30 0.48 - - 0.14 0.14 0.14 5.00 5.00 - - 6.12 6.12 0.88 0.88 12 0.30 0.012 2.11 42% 2.69 0.45 2.57 0.35 778.90 780.89 776.69 776.52 1.04 3.20 107 109 92.64 HDPE 0.30 0.01 - - 0.00 0.00 0.15 5.00 5.35 - - 6.12 6.06 0.02 0.89 12 0.30 0.012 2.11 42% 2.69 0.45 2.58 0.57 780.89 780.80 776.42 776.14 3.30 3.49 108 109 135.84 HDPE 0.30 1.10 - - 0.33 0.33 0.33 5.00 5.00 - - 6.12 6.12 2.03 2.03 15 0.30 0.012 3.83 53% 3.12 0.65 3.17 0.72 784.24 780.80 778.40 777.99 4.40 1.37 109 112 46.17 HDPE 0.30 0.44 - - 0.13 0.13 0.61 5.00 5.93 - - 6.12 5.95 0.81 3.63 15 0.30 0.012 3.83 95% 3.12 0.97 3.55 0.25 780.80 780.44 776.04 775.91 3.32 3.10 110 111 32.00 HDPE 0.72 0.30 - - 0.22 0.22 0.22 5.00 5.00 - - 6.12 6.12 1.32 1.32 12 3.13 0.012 6.82 19% 8.69 0.30 6.72 0.06 - 778.56 777.76 776.76 - 0.63 111 112 65.24 HDPE 0.73 0.27 - - 0.20 0.20 0.41 5.00 5.06 - - 6.12 6.11 1.20 2.52 12 1.16 0.012 4.16 61% 5.29 0.56 5.55 0.21 778.56 780.44 776.66 775.91 0.73 3.37 112 113 193.14 HDPE - - - - - - 1.96 - 7.75 - - - 5.62 - 11.03 24 0.30 0.012 13.42 82% 4.27 1.38 4.77 0.75 780.44 780.17 775.81 775.23 2.38 2.69 113 114 42.00 HDPE - - - - - - 1.96 - 8.50 - - - 5.49 - 10.77 24 0.30 0.012 13.42 80% 4.27 1.36 4.75 0.16 780.17 - 775.13 775.00 2.79 - 114 Out -- - - - - - - 1.96 - 8.67 - - - 5.46 - 10.71 - - - - - - - - - - - 775.00 775.00 - - TRAVEL TIME DIRECT TO INLET i FLOW DEPTH FLOW VELOCITY CAPACITY UTILIZATIONMANNING'S NSTR. PROPOSED STORM SEWER SYSTEM STORM SEWER DESIGN TABLE - RATIONAL METHOD Job Information City of Carmel 2020-340 COVERLENGTH Drop Amount: INVERTRIMENTITY DATA i PIPE DIAMETER PIPE SLOPE FULL PIPE CAPACITY ELEV.ELEV.FULL FLOW VELOCITY 03/24/21 (in/hr) CHEN'S METHOD Design Storm: TO STR. DIRECT TO CASTINGPIPE MATERIAL Design Parameters Intensity Calculation Method: cA Invert Calculation Method: FLOW (in/hr) Page 32 of 180 Description:Carmel - Hartman Field Reviewing Entity:City of Carmel Job #:2020-340 Date:3/24/2021 STR. STRUCTURE CASTING GRADE CONNECT TO REMARKS NO.TYPE TYPE L.F.SIZE TYPE T.O.R.UPSTM DNSTM (%)STRUCT. 101 END SECTION - 290 15 HDPE - 777.83 776.96 0.30 102 102 TYPE ''C'' MANHOLE R-1772 29 15 HDPE 781.83 776.86 776.77 0.30 104 103 ACO TRENCH DRAIN R-4342 108 12 HDPE 780.05 777.10 776.77 0.30 104 104 TYPE ''E'' INLET R-4215-C 143 18 HDPE 778.96 776.67 776.25 0.30 105 105 TYPE ''C'' MANHOLE R-1772 80 18 HDPE 780.00 776.15 775.91 0.30 112 106 TYPE ''E'' INLET R-4215-C 57 12 HDPE 778.90 776.69 776.52 0.30 107 107 TYPE ''C'' MANHOLE R-4342 93 12 HDPE 780.89 776.42 776.14 0.30 109 108 TYPE ''C'' MANHOLE R-1772 136 15 HDPE 784.24 778.40 777.99 0.30 109 109 TYPE ''C'' MANHOLE R-4342 46 15 HDPE 780.80 776.04 775.91 0.30 112 110 END SECTION - 32 12 HDPE - 777.76 776.76 3.13 111 111 TYPE ''E'' INLET R-4215-C 65 12 HDPE 778.56 776.66 775.91 1.16 112 112 TYPE ''C'' MANHOLE R-1772 193 24 HDPE 780.44 775.81 775.23 0.30 113 113 AQUA-SWIRL XC-7 PER MANUF.42 24 HDPE 780.17 775.13 775.00 0.30 114 114 END SECTION - - - - - 775.00 - - Out *ALL STORM SEWER CASTING SHALL BE MARKED "DUMP TO WASTE DRAINS TO WATERWAYS" PROPOSED STORM SEWER SYSTEM STORM SEWER STRUCTURE DATA TABLE PIPE ELEVATIONSPIPE Job Information STORM SEWER - STRUCTURE DATA TABLE Page 33 of 180 Job Information Description: Reviewing Entity:City of Carmel Job #:2020-340 Date:03/24/21 10-yr 50% Entity Data SPECIFIED SPECIFIED PIPE STRUCTURE CASTING CASTING CASTING ENTITY DATA CASTING ORIFICE FLOW WEIR FLOW PONDING DEPTH STR.STRUCTURE CASTING COVER DEPTH c A Tc i FLOW DEPTH DEPTH NO.TYPE TYPE (ft)(ft)(acres)(min)(in/hr)(cfs)(ft)(ft)(ft) 101 END SECTION - - - 0.49 1.24 5.00 6.12 3.72 - - 0.00 102 TYPE ''C'' MANHOLE R-1772 3.53 4.97 - - - - - - - 0.00 103 ACO TRENCH DRAIN R-4342 1.79 2.95 0.55 0.42 5.00 6.12 1.41 0.09 0.30 0.30 104 TYPE ''E'' INLET R-4215-C 0.58 2.29 0.41 0.24 5.00 6.12 0.61 0.01 0.12 0.12 105 TYPE ''C'' MANHOLE R-1772 2.15 3.85 - - - - - - - 0.00 106 TYPE ''E'' INLET R-4215-C 1.04 2.21 0.30 0.48 5.00 6.12 0.88 0.01 0.15 0.15 107 TYPE ''C'' MANHOLE R-4342 3.30 4.47 0.30 0.01 5.00 6.12 0.02 0.00 0.02 0.02 108 TYPE ''C'' MANHOLE R-1772 4.67 5.84 0.30 1.10 5.00 6.12 2.03 - - 0.00 109 TYPE ''C'' MANHOLE R-4342 3.32 4.76 0.30 0.44 5.00 6.12 0.81 0.03 0.21 0.21 110 END SECTION - - - 0.72 0.30 5.00 6.12 1.32 - - 0.00 111 TYPE ''E'' INLET R-4215-C 0.73 1.90 0.73 0.27 5.00 6.12 1.20 0.02 0.18 0.18 112 TYPE ''C'' MANHOLE R-1772 2.38 4.63 - - - - - - - 0.00 113 AQUA-SWIRL XC-7 PER MANUF. 2.79 5.04 - - - - - - - 0.00 114 END SECTION - - - - - - - - - - 0.00 Design Parameters Design Storm: PROPOSED STORM SEWER SYSTEM ORIFICE FLOW CASTING CAPACITY CALCULATIONS Clogging (%): Carmel - Hartman Field Intensity Calculation Method: Page 34 of 180 Description:Carmel - Hartman Field Entity:City of Carmel Job #:2020-340 Date:03/24/21 10-yr Entity Data (dc+D)/2 Structure Coefficient (ft)(ft)(ft)(ft)(min)(in/hr)(cfs)(in.)%(sq. ft)(ft.)(ft.)(ft.)(ft)(ft/s)(ft)(ft)(ft/s)(ft.)(ft.)(ft.)(ft.)(ft/s)(ft)(ft)(ft)(ft.)(ft.)(ft.) 102 101 776.96 778.21 777.97 778.47 5.00 6.12 3.72 15 0.30 1.046 2.753 0.380 0.994 0.780 3.56 290 0.012 0.864 - 0.10 0.10 0.10 0.10 - 1.25 3.55 - 0.246 1.110 779.58 - 779.08 104 102 776.77 778.02 777.78 778.39 6.55 5.84 3.55 15 0.30 1.002 2.651 0.378 0.951 0.761 3.55 29 0.012 0.086 3.56 1.10 1.10 1.10 1.10 - 0.50 3.98 - 0.001 0.086 778.47 781.83 778.11 104 103 776.77 777.77 777.53 778.39 5.00 6.12 1.41 12 0.30 0.489 1.767 0.277 0.597 0.503 2.88 108 0.012 0.322 - 2.10 2.10 2.10 2.10 - 1.25 3.98 - 0.161 0.483 778.87 780.05 778.10 105 104 776.25 777.75 777.45 777.94 6.70 5.81 5.46 18 0.30 1.372 3.056 0.449 1.087 0.900 3.98 143 0.012 0.426 3.55 3.10 3.10 3.10 3.10 - 0.50 3.96 - 0.025 0.451 778.39 778.96 778.17 112 105 775.91 777.41 777.10 777.70 7.37 5.69 5.34 18 0.30 1.348 3.016 0.447 1.069 0.891 3.96 80 0.012 0.239 3.98 4.10 4.10 4.10 4.10 - 0.50 4.77 - 0.001 0.240 777.94 780.00 777.65 107 106 776.52 777.52 777.22 778.16 5.00 6.12 0.88 12 0.30 0.343 1.471 0.233 0.450 0.393 2.57 57 0.012 0.170 - 5.10 5.10 5.10 5.10 - 1.25 2.58 - 0.128 0.298 778.45 778.90 777.69 109 107 776.14 777.14 776.84 777.88 5.35 6.06 0.89 12 0.30 0.346 1.476 0.234 0.453 0.395 2.58 93 0.012 0.276 2.57 6.10 6.10 6.10 6.10 - 0.50 3.55 - 0.000 0.277 778.16 780.89 777.42 109 108 777.99 778.99 778.80 778.80 5.00 6.12 2.03 12 0.30 0.661 2.176 0.304 0.784 0.607 3.06 136 0.012 0.405 - 7.10 7.10 7.10 7.10 - 1.25 3.55 - 0.182 0.588 779.39 784.24 779.40 112 109 775.91 777.16 776.92 777.70 5.93 5.95 3.63 15 0.30 1.022 2.694 0.379 0.970 0.770 3.55 46 0.012 0.138 2.58 8.10 8.10 8.10 8.10 - 0.50 4.77 - 0.047 0.184 777.88 780.80 777.29 111 110 776.76 777.76 777.51 778.56 5.00 6.12 1.32 12 3.13 0.197 1.157 0.170 0.299 0.486 6.72 32 0.012 0.993 - 9.10 9.10 9.10 9.10 - 1.25 5.55 - 0.877 1.871 780.43 - 778.76 112 111 775.91 776.91 776.75 777.70 5.06 6.11 2.52 12 1.16 0.455 1.696 0.268 0.562 0.680 5.55 65 0.012 0.753 6.72 10.10 10.10 10.10 10.10 - 0.50 4.77 - 0.112 0.865 778.56 778.56 777.66 113 112 775.23 777.23 776.82 777.07 7.75 5.62 11.03 24 0.30 2.313 3.922 0.590 1.380 1.191 4.77 193 0.012 0.576 3.96 11.10 11.10 11.10 11.10 - 0.50 4.75 - 0.055 0.631 777.70 780.44 777.81 114 113 775.00 777.00 776.59 776.59 8.50 5.49 10.77 24 0.30 2.267 3.869 0.586 1.356 1.176 4.75 42 0.012 0.125 4.77 12.10 12.10 12.10 12.10 1.00 0.50 - 0.350 0.002 0.477 777.07 780.17 777.13 Intensity Calculation Method: Starting Elevation: Calculation Method: INTENSITY PROPOSED STORM SEWER SYSTEM HYDRAULIC GRADE LINE CALCULATIONS Job Information Design Parameters Design Storm: D.S. STR. U.S. STR. D.S. INV. ELEV.D.S. CROWN ELEV.CRITICAL DEPTH(dc+D)/2 ELEV.STARTING ELEV. Tc ENTITY DATA UPSTREAM MAXIMUM INFLUENT VELOCITYFLOW DIAMETER SLOPE AREA WETTED PERIMETER HYDRAULIC RADIUS FLOW DEPTH VELOCITY LENGTH MANNING'S N FRICTION LOSS "A" LOSS "B" LOSS "C" LOSS TOTAL LOSS U.S. HGL ELEV. U.S. STR. CROWN"D" LOSS OUTLET STRUCTURE COEFFICIENT UPSTREAM STRUCTURE COEFFICIENT EFFLUENT PIPE VELOCITY OUTLET STRUCTURE LOSS UPSTREAM STRUCTURE LOSS U.S. STR. TOR Page 35 of 180 Description:Carmel - Hartman Field Entity:City of Carmel Job #:2020-340 Date:03/24/21 100-yr Entity Data (dc+D)/2 Structure Coefficient (ft)(ft)(ft)(ft)(min)(in/hr)(cfs)(in.)%(sq. ft)(ft.)(ft.)(ft.)(ft)(ft/s)(ft)(ft)(ft/s)(ft.)(ft.)(ft.)(ft.)(ft/s)(ft)(ft)(ft)(ft.)(ft.)(ft.) 102 101 776.96 778.21 778.06 779.56 5.00 9.12 5.55 15 0.30 1.227 3.927 0.313 1.250 0.954 4.52 290 0.012 1.812 - 0.10 0.10 0.10 0.10 - 1.25 4.32 - 0.397 2.209 781.76 - 779.08 104 102 776.77 778.02 777.87 779.38 6.55 8.71 5.30 15 0.30 1.227 3.927 0.313 1.250 0.933 4.32 29 0.012 0.164 4.52 1.10 1.10 1.10 1.10 - 0.50 4.60 - 0.014 0.178 779.56 781.83 778.11 104 103 776.77 777.77 777.58 779.38 5.00 9.12 2.10 12 0.30 0.685 2.251 0.304 0.815 0.619 3.07 108 0.012 0.322 - 2.10 2.10 2.10 2.10 - 1.25 4.60 - 0.183 0.504 779.88 780.05 778.10 105 104 776.25 777.75 777.55 778.63 6.70 8.66 8.13 18 0.30 1.767 4.712 0.375 1.500 1.105 4.60 143 0.012 0.725 4.32 3.10 3.10 3.10 3.10 - 0.50 4.51 - 0.020 0.744 779.38 778.96 778.17 112 105 775.91 777.41 777.20 778.24 7.37 8.48 7.96 18 0.30 1.767 4.712 0.375 1.500 1.093 4.51 80 0.012 0.390 4.60 4.10 4.10 4.10 4.10 - 0.50 5.23 - 0.007 0.397 778.63 780.00 777.65 107 106 776.52 777.52 777.26 778.88 5.00 9.12 1.31 12 0.30 0.463 1.712 0.270 0.571 0.484 2.84 57 0.012 0.170 - 5.10 5.10 5.10 5.10 - 1.25 2.84 - 0.156 0.326 779.20 778.90 777.69 109 107 776.14 777.14 776.89 778.60 5.35 9.03 1.33 12 0.30 0.467 1.720 0.271 0.574 0.487 2.84 93 0.012 0.276 2.84 6.10 6.10 6.10 6.10 - 0.50 4.41 - 0.000 0.277 778.88 780.89 777.42 109 108 777.99 779.24 778.97 778.97 5.00 9.12 3.02 15 0.30 0.872 2.394 0.364 0.836 0.699 3.46 136 0.012 0.405 - 7.10 7.10 7.10 7.10 - 1.25 4.41 - 0.232 0.638 779.61 784.24 779.65 112 109 775.91 777.16 777.00 778.24 5.93 8.87 5.41 15 0.30 1.227 3.927 0.313 1.250 0.943 4.41 46 0.012 0.275 2.84 8.10 8.10 8.10 8.10 - 0.50 5.23 - 0.088 0.363 778.60 780.80 777.29 111 110 776.76 777.76 777.56 779.15 5.00 9.12 1.97 12 3.13 0.263 1.304 0.201 0.368 0.599 7.52 32 0.012 0.994 - 9.10 9.10 9.10 9.10 - 1.25 5.99 - 1.097 2.091 781.24 - 778.76 112 111 775.91 776.91 776.82 778.24 5.06 9.10 3.76 12 1.16 0.627 2.082 0.301 0.745 0.825 5.99 65 0.012 0.753 7.52 10.10 10.10 10.10 10.10 - 0.50 5.23 - 0.160 0.913 779.15 778.56 777.66 113 112 775.23 777.23 776.96 777.32 7.75 8.38 16.44 24 0.30 3.142 6.283 0.500 2.000 1.462 5.23 193 0.012 0.865 4.51 11.10 11.10 11.10 11.10 - 0.50 5.11 - 0.055 0.920 778.24 780.44 777.81 114 113 775.00 777.00 776.72 776.72 8.50 8.18 16.05 24 0.30 3.142 6.283 0.500 2.000 1.444 5.11 42 0.012 0.179 5.23 12.10 12.10 12.10 12.10 1.00 0.50 - 0.405 0.010 0.594 777.32 780.17 777.13 Intensity Calculation Method: Starting Elevation: Calculation Method: INTENSITY PROPOSED STORM SEWER SYSTEM HYDRAULIC GRADE LINE CALCULATIONS Job Information Design Parameters Design Storm: D.S. STR. U.S. STR. D.S. INV. ELEV.D.S. CROWN ELEV.CRITICAL DEPTH(dc+D)/2 ELEV.STARTING ELEV. Tc ENTITY DATA UPSTREAM MAXIMUM INFLUENT VELOCITYFLOW DIAMETER SLOPE AREA WETTED PERIMETER HYDRAULIC RADIUS FLOW DEPTH VELOCITY LENGTH MANNING'S N FRICTION LOSS "A" LOSS "B" LOSS "C" LOSS TOTAL LOSS U.S. HGL ELEV. U.S. STR. CROWN"D" LOSS OUTLET STRUCTURE COEFFICIENT UPSTREAM STRUCTURE COEFFICIENT EFFLUENT PIPE VELOCITY OUTLET STRUCTURE LOSS UPSTREAM STRUCTURE LOSS U.S. STR. TOR 100-YR FULLY CLOGGED CONDITION 100-YR HGL ELEVATIONS BELOW FFE OF EXISTING ESC BUILDING (779.75) Page 36 of 180 Description:Entity:Job #:Date:03/24/21The Flow Rate shown above has the capacity to accommodate the 10 yearcumulative runoff values provided in the Storm Sewer System Calculations.Top Width (ft):7.06Velocity (ft/s):2.84Cross Sectional Area (ft2): 4.00Wetted Perimeter (ft):7.32Hydraulic Radius (ft):0.55Depth of Flow (ft):1.00Maximum Flow Rate (cfs): -Flow Rate (cfs):11.35Slope of Channel (ft/ft):0.0100Manning's Roughness Coefficient:0.035Freeboard (ft):0.0100Side Slope (x:1):3.0000Location of Channel:Typical Swale Channel Design (min.slope)Geometry:TrapezoidalSolve For:Flow Rate10-yrDiameter (ft):-Bottom Width (ft):1.00002020-340PROPOSED STORMWATER SYSTEM OPEN CHANNEL CALCULATIONJob InformationCarmel - Hartman FieldCity of CarmelPage 37 of 180 Description:Entity:Job #:Date:03/24/21The Flow Rate shown above has the capacity to accommodate the 100 yearcumulative runoff values of 16.44 cfs (rational method).Top Width (ft):8.26Velocity (ft/s):3.16Cross Sectional Area (ft2): 5.52Wetted Perimeter (ft):8.59Hydraulic Radius (ft):0.64Depth of Flow (ft):1.20Maximum Flow Rate (cfs): -Flow Rate (cfs):17.45Slope of Channel (ft/ft):0.0100Manning's Roughness Coefficient:0.035Freeboard (ft):0.0100100-yrDiameter (ft):-Bottom Width (ft):1.0000Side Slope (x:1):3.0000Location of Channel:Typical Swale Channel Design (min.slope)Geometry:TrapezoidalSolve For:Flow RatePROPOSED STORMWATER SYSTEM OPEN CHANNEL CALCULATIONJob InformationCarmel - Hartman FieldCity of Carmel2020-340Page 38 of 180 Carmel Clay Schools – Carmel High School Hartman Field Improvements May 12, 2021 TLF, Inc. Project No. 2020-340 Appendix D Proposed Drainage Conditions Page 39 of 180 TBM#2 = 791.71 TBM#3 = 775.53 ADJOINER MOHAWK CROSSING SECTION 3 P.B. 10, PG. 20-21 MOHAWK CROSSING SECTION 2 P.B. 7, PG. 166-167 LOT 58 LOT 57 LOT 56 LOT 55 LOT 54 LOT 52 LOT 51 LOT 50 LOT 49 LOT 33 LOT 32 LOT 31 TBM#1 = 782.26 ADJOINER ADJOINERTHE GRAY ESTATE LOT 1 P.C. 3, SLIDE 557 INSTR. #2005001106 ADJOINER TBM#4 = 779.85 TBM#2 = 781.44 E. MAIN STREET STSTST STSTSTSTST ST STSTSTST ST SAN SANWTR WTR EAST 1 1.83 ACRES CN = 86 EAST 2 2.52 ACRES CN = 96 EAST 3 9.48 ACRES CN = 77 EAST 4 3.16 ACRES CN = 98 SOUTH BASIN 9.66 ACRES EAST BASIN 16.99 ACRES CN = 85 tc = 34 min. WEST BASIN (INCLUDES OFF-SITE WEST) 17.29 ACRES CN = 84 tc = 89 min. OFF-SITE WEST OFF-SITE EAST 0.25 ACRES CN = 74 tc = 10 min. 50 150050100 ARCHITECT CARMEL CLAY SCHOOLS REV. NO.DESCRIPTION DATE CONSULTANT NOT FOR CONSTRUCTIONTAC SUBMITTAL WWW.FHAI.COM317-848-0966 350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204 COPYRIGHT 2020 BY FANNING/HOWEY ASSOCIATES, INC. 5201 E MAIN STREET CARMEL, IN 46033 CARMEL HIGH SCHOOL HARTMAN FIELD IMPROVEMENTS PROJECT NUMBER: 220127.00 PROJECT ISSUE DATE: 02/17/2021 DRAWN BY: HHW PROJECT 220127.00 WWW.TLF-ENGINEERS.COM317-334-1500 3901 W 86TH ST #200, INDIANAPOLIS, IN 46268 D1 PROPOSED DRAINAGE CONDITIONS Page 40 of 180 TBM#2 = 791.71TBM#3 = 775.53ADJOINERTBM#1 = 782.26ADJOINERADJOINERADJOINERTBM#4 = 779.85TBM#2 = 781.44E. MAIN STREET12WTRSANWTRWTRSANSANWTRSANSAN SANWTR ST-108ST-102ST-104ST-103ST-107ST-112ST-105ST-113ST-109ST-111ST-101ST-110ST-106ST-114ST-108ACONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTION LIMITSBUILDING INFORMATIONFINISH FLOOR ELEV.= 779.75MIN. LOWEST ADJACENT GRADE = 779.25MIN. FLOOD PROTECTION GRADE = 778.52EAST BASIN PROPOSED CONDITIONSCONTRIBUTING DRAINAGE AREA = 13.8310 YR. DISCHARGE = 10.72 CFS10 YR. STAGE ELEV.= 774.8510 YR. STORAGE VOLUME = 0.77 AC/FT100 YR. DISCHARGE = 12.14 CFS100 YR. STAGE ELEV.= 776.52100 YR. STORAGE VOLUME REQUIRED = 2.30 AC/FT100 YR. STORAGE VOLUME PROVIDED = 6.0 AC/FTUNDERGROUND DETENTION CHAMBERS (SC-740)CONTRIBUTING DRAINAGE AREA = 3.16 ACRESMINIMUM FINISH GRADE ELEV. = 783.00TOP OF STONE = 782.50TOP OF CHAMBERS = 781.50BOTTOM OF CHAMBERS = 779.00BOTTOM OF STONE = 778.5021 ROWS OF 27 CHAMBERS = 47,355 CFT.10 YR. DISCHARGE = 1.02 CFS10 YR. STAGE ELEV.= 780.0610 YR. STORAGE VOLUME = 0.49 AC/FT100 YR. DISCHARGE = 2.03 CFS100 YR. STAGE ELEV.= 781.20100 YR. STORAGE VOLUME REQUIRED = 0.85 AC/FT100 YR. STORAGE VOLUME PROVIDED = 1.09 AC/FTWEST BASIN PROPOSED CONDITIONSCONTRIBUTING DRAINAGE AREA = 17.2910 YR. DISCHARGE = 7.08 CFS10 YR. STAGE ELEV.= 777.1310 YR. STORAGE VOLUME = 0.83 AC/FT100 YR. DISCHARGE = 7.49 CFS100 YR. STAGE ELEV.= 779.14100 YR. STORAGE VOLUME REQUIRED = 3.07 AC/FT100 YR. STORAGE VOLUME PROVIDED = 3.07 AC/FT22333332ST-202ST-2014444444444444444EXIST. STORAGE BUILDING (WEST SIDE)FINISH FLOOR ELEV.= 782.20PROPOSED RESTROOM BUILDING (EAST SIDE)FINISH FLOOR ELEV.= 780.874OVERTOPPING FLOODELEVATION: 780.50±OVERTOPPING FLOODELEVATION: 782.50±OVERTOPPING FLOODELEVATION: 778.50±OVERTOPPING FLOODELEVATION: 781.10±CARMEL SCHOOL ARM OFTHE UG MITCHNER DRAIN30.0'30.0'30' REGULATEDDRAINAGE EASEMENTBENCHMARKS:60180060120INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! G2.0OVERALL GRADING PLAN1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONALLEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWNWERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC.THE ENGINEER MAKES NO GUARANTEES THAT THEUNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIESIN THE AREA, EITHER IN SERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THEPROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS,LOCATION AND DEPTH PRIOR TO ANY OTHER SITECONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER.4.THE MINIMUM FLOOD PROTECTION GRADE OF ALL STRUCTURESFRONTING A POND OR OPEN DITCH SHALL BE NO LESS THAN 2FEET ABOVE ANY ADJACENT 100-YR LOCAL OR REGIONAL FLOODELEVATIONS, WHICHEVER IS GREATER, FOR ALL WINDOWS,DOORS, PIPE ENTRANCES, WINDOW WELLS, AND ANY OTHERSTRUCTURE MEMBER WHERE FLOODWATERS CAN ENTER ABUILDING.GENERAL NOTESCONSULTANTCarmel Clay SchoolsWWW.FHAI.COMARCHITECT317-848-0966350 E NEW YORK ST# 300, INDIANAPOLIS, IN 46204COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC.5201 East Main StreetCarmel, Indiana 46033CARMEL HARTMANFIELD IMPROVEMENTSNOT FOR CONSTRUCTIONConstruction DocumentsREV.NO.DESCRIPTIONDATETAC SUBMITTAL02/17/2021APROJECT NUMBER: 220127.00PROJECT ISSUE DATE: March 1, 2021DRAWN BY: HHWWWW.TLF-ENGINEERS.COM317-334-15003901 W 86TH ST #200, INDIANAPOLIS, IN 46268GRADING PLAN LEGENDEXISTING SPOT ELEVATIONMATCH EXISTING GRADETOP OF CURBBOTTOM OF CURBEDGE OF PAVEMENTFLOWLINEEXISTING CONTOUR W/ ELEVATIONPROPOSED CONTOUR W/ ELEVATIONPROPOSED SPOT ELEVATIONPROPOSED SURFACE DRAINAGE FLOW ARROWFLOOD ROUTING PATH100-YEAR OVERFLOW PATHS/PONDING AREASMEGTCBCEP750.65FLUSGS BENCHMARK INFORMATION GRADING KEYNOTES1.CONTRACTOR TO COORDINATE WITH OWNERSREPRESENTATIVE ON LOW SPOT REGRADING. FINAL AREASTO BE DETERMINED PRIOR TO CONSTRUCTION. SOD TO BESTRIPPED PRIOR TO GRADING ACTIVITY.2.PROPOSED SWALE @ 1.0% MIN. SLOPE3.BOTTOM OF DRY BASIN @ 1.0% MIN. SLOPE4.FLOOD ROUTING PATH FROM THE PROJECT SITE WHEN THE100 YEAR FLOOD IS EXCEEDED.Page 41 of 180 Carmel - Hartman Field - Roof 98 Grass 74 Pavement 98 Roof Area Pervious Area Pavement Area Total Area Weighted Runoff Coefficient Weighted Curve Number (acres)(acres)(acres)(acres)C CN Exist. West -- 10.61 7.26 17.87 - 84 East 1 -- 0.91 0.93 1.83 - 86 East 2 -- 0.25 2.27 2.52 - 96 Exist. East 3 -- 9.31 -9.31 - 74 Pro. West -- 9.82 7.47 17.29 - 84 Pro. East 3 -- 8.26 1.22 9.48 - 77 Pro. East 4 -- - 3.16 3.16 - 98 Date: Basin Structure Proposed Drainage Conditions Runoff Curve Number Calculations Job Information Description: Entity:City of Carmel Job #:2020-340 Runoff Curve Number Group Rating "C" Page 42 of 180 Project:Chamber Model - SC-740Units -ImperialNumber of chambers - 567Voids in the stone (porosity) - 40 %Base of Stone Elevation - 778.50 ftAmount of Stone Above Chambers - 12 inAmount of Stone Below Chambers - 6 in9Area of system - 19992 sf Min. Area - Height of System Incremental Single ChamberIncremental Total ChamberIncremental StoneIncremental Ch & StCumulative Chamber Elevation(inches) (cubic feet) (cubic feet) (cubic feet) (cubic feet) (cubic feet) (feet)48 0.00 0.00 666.40 666.40 47619.68 782.5047 0.00 0.00 666.40 666.40 46953.28 782.4246 0.00 0.00 666.40 666.40 46286.88 782.3345 0.00 0.00 666.40 666.40 45620.48 782.2544 0.00 0.00 666.40 666.40 44954.08 782.1743 0.00 0.00 666.40 666.40 44287.68 782.0842 0.00 0.00 666.40 666.40 43621.28 782.0041 0.00 0.00 666.40 666.40 42954.88 781.9240 0.00 0.00 666.40 666.40 42288.48 781.8339 0.00 0.00 666.40 666.40 41622.08 781.7538 0.00 0.00 666.40 666.40 40955.68 781.6737 0.00 0.00 666.40 666.40 40289.28 781.5836 0.05 31.18 653.93 685.11 39622.88 781.5035 0.16 92.38 629.45 721.83 38937.77 781.4234 0.28 159.86 602.46 762.32 38215.94 781.3333 0.60 342.45 529.42 871.87 37453.63 781.2532 0.80 454.57 484.57 939.14 36581.76 781.1731 0.95 539.03 450.79 989.82 35642.61 781.0830 1.07 609.25 422.70 1031.95 34652.80 781.0029 1.18 669.34 398.66 1068.00 33620.85 780.9228 1.27 717.63 379.35 1096.98 32552.84 780.8327 1.36 768.29 359.08 1127.37 31455.87 780.7526 1.45 824.47 336.61 1161.08 30328.49 780.6725 1.52 864.52 320.59 1185.11 29167.41 780.58241.58897.18307.531204.7127982.29780.50StormTech SC-740 Cumulative Storage Volumes 19167 sf min. areaClick Here for MetricInclude Perimeter Stone in Calculations241.58897.18307.531204.7127982.29780.5023 1.64 931.17 293.93 1225.10 26777.59 780.4222 1.70 963.62 280.95 1244.57 25552.48 780.3321 1.75 993.91 268.84 1262.75 24307.91 780.2520 1.80 1022.19 257.52 1279.72 23045.16 780.1719 1.85 1051.78 245.69 1297.47 21765.45 780.0818 1.89 1073.38 237.05 1310.43 20467.97 780.0017 1.93 1096.58 227.77 1324.35 19157.55 779.9216 1.97 1119.82 218.47 1338.29 17833.20 779.8315 2.01 1139.63 210.55 1350.18 16494.90 779.7514 2.04 1159.51 202.60 1362.11 15144.73 779.6713 2.07 1176.50 195.80 1372.30 13782.62 779.5812 2.10 1193.49 189.01 1382.49 12410.32 779.5011 2.13 1208.73 182.91 1391.64 11027.83 779.4210 2.15 1221.24 177.91 1399.14 9636.19 779.339 2.18 1234.39 172.64 1407.04 8237.05 779.258 2.20 1246.47 167.81 1414.28 6830.01 779.177 2.21 1251.55 165.78 1417.33 5415.73 779.086 0.00 0.00 666.40 666.40 3998.40 779.005 0.00 0.00 666.40 666.40 3332.00 778.924 0.00 0.00 666.40 666.40 2665.60 778.833 0.00 0.00 666.40 666.40 1999.20 778.752 0.00 0.00 666.40 666.40 1332.80 778.671 0.00 0.00 666.40 666.40 666.40 778.58 Include Perimeter Stone in CalculationsPage 43 of 180 Description:Reviewing Entity:Job #:Date:5/12/2021Existing East BasinElevation Area Incremental Volume Total Volume(ft) (acre) (ac-ft) (ac-ft)771.47 0.000.000 0.0772 0.000.001 0.0773 0.090.047 0.0774 0.280.184 0.2775 0.480.379 0.6776 0.670.574 1.2777 0.960.815 2.0778 1.571.266 3.3779 2.842.202 5.5Proposed East BasinElevation Area Incremental Volume Total Volume(ft) (acre) (ac-ft) (ac-ft)771.47 0.000.000 0.0772 0.000.015 0.0773 0.090.125 0.1774 0.280.334 0.5775 0.480.765 1.2776 0.670.993 2.2777 0.961.203 3.4778 1.571.455 4.9779 2.842.223 7.12020-340PROPOSED STORMWATER SYSTEM DETENTION POND VOLUMEJob InformationCarmel - Hartman FieldCity of Carmel778.50 6 ac-ft(overflow elevation)Page 44 of 180 Model 1 Proposed Conditions Report 1 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:50 Background Image: Proposed Conditions Simple Basin: East 1 Scenario:Icpr3 Node:NZA-0090 Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:5.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:1.8300 ac Curve Number:86.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Page 45 of 180 Model 1 Proposed Conditions Report 2 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:50 Simple Basin: East 2 Scenario:Icpr3 Node:NZA-0100 Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:5.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:2.5200 ac Curve Number:96.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Simple Basin: East 4 Scenario:Icpr3 Node:StormTech Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:10.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:3.1600 ac Curve Number:98.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Simple Basin: East Basin 3 Scenario:Icpr3 Node:East Basin Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:34.0000 min Max Allowable Q:0.00 cfs Page 46 of 180 Model 1 Proposed Conditions Report 3 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:50 Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:9.4800 ac Curve Number:77.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Simple Basin: Offsite East Scenario:Icpr3 Node:East Basin Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:10.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:0.2500 ac Curve Number:74.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Simple Basin: West Basin Scenario:Icpr3 Node:West Basin Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:89.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:17.2900 ac Curve Number:84.0 % Impervious:0.00 % DCIA:0.00 Page 47 of 180 Model 1 Proposed Conditions Report 4 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:50 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Node: BMP Scenario:Icpr3 Type:Time/Stage Base Flow:0.00 cfs Initial Stage:100.00 ft Warning Stage:101.00 ft Boundary Stage: Year Month Day Hour Stage [ft] 0 0 0 0.0000 100.00 0 0 0 99999.0000 100.00 Comment: Node: East Basin Scenario:Icpr3 Type:Stage/Area Base Flow:0.00 cfs Initial Stage:771.47 ft Warning Stage:779.00 ft Stage [ft]Area [ac]Area [ft2] 771.47 0.0000 0 772.00 0.0150 653 773.00 0.1250 5445 774.00 0.3440 14985 775.00 0.7650 33323 776.00 0.9930 43255 777.00 1.2030 52403 778.00 1.4550 63380 779.00 2.2230 96834 Comment: Node: NTZ-0070 Scenario:Icpr3 Type:Time/Stage Page 48 of 180 Model 1 Proposed Conditions Report 5 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:50 Base Flow:0.00 cfs Initial Stage:766.00 ft Warning Stage:773.00 ft Boundary Stage: Year Month Day Hour Stage [ft] 0 0 0 0.0000 766.00 0 0 0 99999.0000 766.00 Comment: Node: NZA-0090 Scenario:Icpr3 Type:Stage/Area Base Flow:0.00 cfs Initial Stage:773.63 ft Warning Stage:778.08 ft Stage [ft]Area [ac]Area [ft2] 0.00 0.0000 0 Comment: Node: NZA-0100 Scenario:Icpr3 Type:Stage/Area Base Flow:0.00 cfs Initial Stage:773.05 ft Warning Stage:777.40 ft Comment: Node: StormTech Scenario:Icpr3 Type:Stage/Volume Base Flow:0.00 cfs Initial Stage:778.50 ft Warning Stage:782.50 ft Stage [ft]Volume [ac-ft]Volume [ft3] 778.50 0.00 0 Page 49 of 180 Model 1 Proposed Conditions Report 6 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:50 Stage [ft]Volume [ac-ft]Volume [ft3] 778.58 0.02 666 778.67 0.03 1333 778.75 0.05 1999 778.83 0.06 2666 778.92 0.08 3332 779.00 0.09 3998 779.08 0.12 5416 779.17 0.16 6830 779.25 0.19 8237 779.33 0.22 9636 779.42 0.25 11028 779.50 0.28 12410 779.58 0.32 13783 779.67 0.35 15145 779.75 0.38 16495 779.83 0.41 17833 779.92 0.44 19158 780.00 0.47 20468 780.08 0.50 21765 780.17 0.53 23045 780.25 0.56 24308 780.33 0.59 25552 780.42 0.61 26778 780.50 0.64 27982 780.58 0.67 29167 780.67 0.70 30328 780.75 0.72 31456 780.83 0.75 32553 780.92 0.77 33621 781.00 0.80 34653 781.08 0.82 35643 781.17 0.84 36582 781.25 0.86 37454 781.33 0.88 38216 781.42 0.89 38938 781.50 0.91 39623 781.58 0.92 40289 781.67 0.94 40956 781.75 0.96 41622 781.83 0.97 42288 781.92 0.99 42955 782.00 1.00 43621 782.08 1.02 44288 782.17 1.03 44954 782.25 1.05 45620 782.33 1.06 46287 782.42 1.08 46953 782.50 1.09 47620 782.51 1.09 47620 Page 50 of 180 Model 1 Proposed Conditions Report 7 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:50 Comment: Node: West Basin Scenario:Icpr3 Type:Stage/Area Base Flow:0.00 cfs Initial Stage:774.64 ft Warning Stage:779.00 ft Stage [ft]Area [ac]Area [ft2] 774.24 0.0000 0 775.00 0.0430 1873 776.00 0.3290 14331 777.00 0.7610 33149 778.00 1.0920 47568 779.00 1.3380 58283 Comment: Pipe Link: L-0040P Scenario:Icpr3 From Node:West Basin To Node:NZA-0090 Link Count:1 Flow Direction:Both Damping:0.0000 ft Length:134.00 ft FHWA Code:0 Entr Loss Coef:0.50 Exit Loss Coef:0.00 Bend Loss Coef:0.00 Bend Location:0.00 dec Energy Switch:Energy Upstream Downstream Invert:774.64 ft Invert:773.63 ft Manning's N:0.0130 Manning's N:0.0130 Geometry: Circular Geometry: Circular Max Depth:1.25 ft Max Depth:1.25 ft Bottom Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Top Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Comment: Pipe Link: L-0050P Scenario:Icpr3 From Node:NZA-0090 To Node:NZA-0100 Link Count:1 Upstream Downstream Invert:773.73 ft Invert:773.15 ft Manning's N:0.0130 Manning's N:0.0130 Geometry: Circular Geometry: Circular Max Depth:1.75 ft Max Depth:1.75 ft Page 51 of 180 Model 1 Proposed Conditions Report 8 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:50 Flow Direction:Both Damping:0.0000 ft Length:144.00 ft FHWA Code:0 Entr Loss Coef:0.50 Exit Loss Coef:0.00 Bend Loss Coef:0.00 Bend Location:0.00 dec Energy Switch:Energy Bottom Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Top Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Comment: Pipe Link: L-0060P Scenario:Icpr3 From Node:NZA-0100 To Node:East Basin Link Count:1 Flow Direction:Both Damping:0.0000 ft Length:219.00 ft FHWA Code:0 Entr Loss Coef:0.50 Exit Loss Coef:0.00 Bend Loss Coef:0.00 Bend Location:0.00 dec Energy Switch:Energy Upstream Downstream Invert:773.05 ft Invert:772.32 ft Manning's N:0.0130 Manning's N:0.0130 Geometry: Horizontal Ellipse Geometry: Horizontal Ellipse Max Depth:2.00 ft Max Depth:2.00 ft Bottom Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Top Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Comment: Drop Structure Link: L-0120DS Scenario:Icpr3 From Node:StormTech To Node:East Basin Link Count:1 Flow Direction:Both Solution:Combine Increments:0 Pipe Count:1 Damping:0.0000 ft Length:436.00 ft FHWA Code:0 Entr Loss Coef:0.50 Exit Loss Coef:0.00 Bend Loss Coef:0.00 Bend Location:0.00 dec Upstream Pipe Downstream Pipe Invert:778.40 ft Invert:775.00 ft Manning's N:0.0120 Manning's N:0.0120 Geometry: Circular Geometry: Circular Max Depth:1.00 ft Max Depth:1.00 ft Bottom Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Top Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Page 52 of 180 Model 1 Proposed Conditions Report 9 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:50 Energy Switch:Energy Pipe Comment: Weir Component Weir:1 Weir Count:1 Weir Flow Direction:Both Damping:0.0000 ft Weir Type:Sharp Crested Vertical Geometry Type:Circular Invert:778.40 ft Control Elevation:778.40 ft Max Depth:0.25 ft Bottom Clip Default:0.00 ft Op Table: Ref Node: Top Clip Default:0.00 ft Op Table: Ref Node: Discharge Coefficients Weir Default:3.200 Weir Table: Orifice Default:0.600 Orifice Table: Weir Comment: Model 1: 3" orifice Model 2: 6" orifice Weir Component Weir:2 Weir Count:1 Weir Flow Direction:Both Damping:0.0000 ft Weir Type:Sharp Crested Vertical Geometry Type:Circular Invert:780.50 ft Control Elevation:780.50 ft Max Depth:0.31 ft Bottom Clip Default:0.00 ft Op Table: Ref Node: Top Clip Default:0.00 ft Op Table: Ref Node: Discharge Coefficients Weir Default:3.200 Weir Table: Orifice Default:0.600 Orifice Table: Weir Comment: Model 1 = 3.75" orifice Model 2 = 6" orifice Drop Structure Comment: Drop Structure Link: L-0130DS Scenario:Icpr3 From Node:East Basin To Node:NTZ-0070 Link Count:1 Flow Direction:Both Solution:Combine Increments:0 Upstream Pipe Downstream Pipe Invert:771.48 ft Invert:766.00 ft Manning's N:0.0130 Manning's N:0.0130 Geometry: Circular Geometry: Circular Max Depth:2.00 ft Max Depth:2.00 ft Bottom Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Page 53 of 180 Model 1 Proposed Conditions Report 10 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:50 Pipe Count:1 Damping:0.0000 ft Length:2150.00 ft FHWA Code:0 Entr Loss Coef:0.50 Exit Loss Coef:0.00 Bend Loss Coef:0.00 Bend Location:0.00 dec Energy Switch:Energy Ref Node:Ref Node: Manning's N:0.0130 Manning's N:0.0130 Top Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0130 Manning's N:0.0130 Pipe Comment: Weir Component Weir:1 Weir Count:1 Weir Flow Direction:Both Damping:0.0000 ft Weir Type:Sharp Crested Vertical Geometry Type:Circular Invert:771.48 ft Control Elevation:771.48 ft Max Depth:2.00 ft Bottom Clip Default:0.00 ft Op Table: Ref Node: Top Clip Default:0.00 ft Op Table: Ref Node: Discharge Coefficients Weir Default:3.200 Weir Table: Orifice Default:0.600 Orifice Table: Weir Comment: 24" pipe Drop Structure Comment: Simulation: DEV10 Scenario:Icpr3 Run Date/Time:2/16/2021 3:09:10 PM Program Version:ICPR4 4.07.06 General Run Mode:Normal Year Month Day Hour [hr] Start Time:0 0 0 0.0000 End Time:0 0 0 60.0000 Hydrology [sec]Surface Hydraulics [sec] Min Calculation Time:60.0000 0.1000 Max Calculation Time:60.0000 Output Time Increments Page 54 of 180 Model 1 Proposed Conditions Report 11 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:50 Hydrology Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 13.0000 15.0000 Surface Hydraulics Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 13.0000 15.0000 Restart File Save Restart:False Resources & Lookup Tables Resources Lookup Tables Rainfall Folder:ICPR3 Boundary Stage Set: Extern Hydrograph Set: Unit Hydrograph Folder: ICPR3 Curve Number Set: Green-Ampt Set: Vertical Layers Set: Impervious Set: Tolerances & Options Time Marching:SAOR IA Recovery Time:24.0000 hr Max Iterations:6 Over-Relax Weight Fact: 0.5 dec dZ Tolerance:0.0010 ft Smp/Man Basin Rain Opt: Global Max dZ:1.0000 ft Link Optimizer Tol:0.0001 ft Rainfall Name:SCSII-24 Rainfall Amount:3.83 in Edge Length Option:Automatic Storm Duration:24.0000 hr Dflt Damping (1D):0.0050 ft Min Node Srf Area (1D): 113 ft2 Energy Switch (1D):Energy Comment: DEVELOPED CONDITIONS DETENTION POND DESIGN 10 YEAR/24 HOUR STORM Page 55 of 180 Model 1 Proposed Conditions Report 12 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:50 Simulation: DEV100 Scenario:Icpr3 Run Date/Time:2/16/2021 3:22:48 PM Program Version:ICPR4 4.07.06 General Run Mode:Normal Year Month Day Hour [hr] Start Time:0 0 0 0.0000 End Time:0 0 0 60.0000 Hydrology [sec]Surface Hydraulics [sec] Min Calculation Time:60.0000 0.1000 Max Calculation Time:60.0000 Output Time Increments Hydrology Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 12.0000 1.0000 0 0 0 12.4000 5.0000 0 0 0 15.0000 15.0000 Surface Hydraulics Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 12.0000 1.0000 0 0 0 12.4000 5.0000 0 0 0 15.0000 15.0000 Restart File Save Restart:False Resources & Lookup Tables Resources Lookup Tables Rainfall Folder:ICPR3 Boundary Stage Set: Extern Hydrograph Set: Unit Hydrograph Folder: ICPR3 Curve Number Set: Green-Ampt Set: Vertical Layers Set: Impervious Set: Page 56 of 180 Model 1 Proposed Conditions Report 13 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:50 Tolerances & Options Time Marching:SAOR IA Recovery Time:24.0000 hr Max Iterations:6 Over-Relax Weight Fact: 0.5 dec dZ Tolerance:0.0010 ft Smp/Man Basin Rain Opt: Global Max dZ:1.0000 ft Link Optimizer Tol:0.0001 ft Rainfall Name:Scsii-24 Rainfall Amount:6.46 in Edge Length Option:Automatic Storm Duration:24.0000 hr Dflt Damping (1D):0.0050 ft Min Node Srf Area (1D): 113 ft2 Energy Switch (1D):Energy Comment: DEVELOPED CONDITIONS DETENTION POND DESIGN 100 YEAR/24 HOUR STORM Page 57 of 180 1D Nodes - Max 1 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 14:50 Sim Node Name Warning Stage [ft]Maximum Stage [ft]Time to Maximum Stage [hrs]Maximum Total Inflow Rate [cfs]Time to Maximum Total Inflow Rate [hrs]Maximum Total Outflow Rate [cfs]Time to Maximum Total Outflow Rate [hrs] DEV10 East Basin 779.00 774.75 13.0883 25.43 12.0172 10.65 13.0826 DEV10 NTZ-0070 773.00 766.00 0.0000 10.65 13.1152 0.00 0.0000 DEV10 StormTech 782.50 780.52 15.3536 13.16 12.0167 0.32 15.3536 DEV10 West Basin 779.00 777.09 13.8810 15.29 12.8999 7.25 14.1037 DEV100 East Basin 779.00 776.37 14.0533 44.16 12.0178 12.04 14.0295 DEV100 NTZ-0070 773.00 766.00 0.0000 12.04 14.0979 0.00 0.0000 DEV100 StormTech 782.50 782.41 13.8261 22.31 12.0166 0.93 13.8244 DEV100 West Basin 779.00 779.12 14.6106 31.81 12.8669 7.68 14.7670 5/12/2021 18:50 Model 1 Page 58 of 180 Model 2 Proposed Conditions Report 1 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:52 Background Image: Proposed Conditions Simple Basin: East 1 Scenario:Icpr3 Node:NZA-0090 Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:5.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:1.8300 ac Curve Number:86.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Page 59 of 180 Model 2 Proposed Conditions Report 2 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:52 Simple Basin: East 2 Scenario:Icpr3 Node:NZA-0100 Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:5.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:2.5200 ac Curve Number:96.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Simple Basin: East 4 Scenario:Icpr3 Node:StormTech Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:10.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:3.1600 ac Curve Number:98.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Simple Basin: East Basin 3 Scenario:Icpr3 Node:East Basin Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:34.0000 min Max Allowable Q:0.00 cfs Page 60 of 180 Model 2 Proposed Conditions Report 3 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:52 Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:9.4800 ac Curve Number:77.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Simple Basin: Offsite East Scenario:Icpr3 Node:East Basin Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:10.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:0.2500 ac Curve Number:74.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Simple Basin: West Basin Scenario:Icpr3 Node:West Basin Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:89.0000 min Max Allowable Q:0.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Area:17.2900 ac Curve Number:84.0 % Impervious:0.00 % DCIA:0.00 Page 61 of 180 Model 2 Proposed Conditions Report 4 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:52 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Node: BMP Scenario:Icpr3 Type:Time/Stage Base Flow:0.00 cfs Initial Stage:100.00 ft Warning Stage:101.00 ft Boundary Stage: Year Month Day Hour Stage [ft] 0 0 0 0.0000 100.00 0 0 0 99999.0000 100.00 Comment: Node: East Basin Scenario:Icpr3 Type:Stage/Area Base Flow:0.00 cfs Initial Stage:771.47 ft Warning Stage:779.00 ft Stage [ft]Area [ac]Area [ft2] 771.47 0.0000 0 772.00 0.0150 653 773.00 0.1250 5445 774.00 0.3440 14985 775.00 0.7650 33323 776.00 0.9930 43255 777.00 1.2030 52403 778.00 1.4550 63380 779.00 2.2230 96834 Comment: Node: NTZ-0070 Scenario:Icpr3 Type:Time/Stage Page 62 of 180 Model 2 Proposed Conditions Report 5 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:52 Base Flow:0.00 cfs Initial Stage:766.00 ft Warning Stage:773.00 ft Boundary Stage: Year Month Day Hour Stage [ft] 0 0 0 0.0000 766.00 0 0 0 99999.0000 766.00 Comment: Node: NZA-0090 Scenario:Icpr3 Type:Stage/Area Base Flow:0.00 cfs Initial Stage:773.63 ft Warning Stage:778.08 ft Stage [ft]Area [ac]Area [ft2] 0.00 0.0000 0 Comment: Node: NZA-0100 Scenario:Icpr3 Type:Stage/Area Base Flow:0.00 cfs Initial Stage:773.05 ft Warning Stage:777.40 ft Comment: Node: StormTech Scenario:Icpr3 Type:Stage/Volume Base Flow:0.00 cfs Initial Stage:778.50 ft Warning Stage:782.50 ft Stage [ft]Volume [ac-ft]Volume [ft3] 778.50 0.00 0 Page 63 of 180 Model 2 Proposed Conditions Report 6 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:52 Stage [ft]Volume [ac-ft]Volume [ft3] 778.58 0.02 666 778.67 0.03 1333 778.75 0.05 1999 778.83 0.06 2666 778.92 0.08 3332 779.00 0.09 3998 779.08 0.12 5416 779.17 0.16 6830 779.25 0.19 8237 779.33 0.22 9636 779.42 0.25 11028 779.50 0.28 12410 779.58 0.32 13783 779.67 0.35 15145 779.75 0.38 16495 779.83 0.41 17833 779.92 0.44 19158 780.00 0.47 20468 780.08 0.50 21765 780.17 0.53 23045 780.25 0.56 24308 780.33 0.59 25552 780.42 0.61 26778 780.50 0.64 27982 780.58 0.67 29167 780.67 0.70 30328 780.75 0.72 31456 780.83 0.75 32553 780.92 0.77 33621 781.00 0.80 34653 781.08 0.82 35643 781.17 0.84 36582 781.25 0.86 37454 781.33 0.88 38216 781.42 0.89 38938 781.50 0.91 39623 781.58 0.92 40289 781.67 0.94 40956 781.75 0.96 41622 781.83 0.97 42288 781.92 0.99 42955 782.00 1.00 43621 782.08 1.02 44288 782.17 1.03 44954 782.25 1.05 45620 782.33 1.06 46287 782.42 1.08 46953 782.50 1.09 47620 782.51 1.09 47620 Page 64 of 180 Model 2 Proposed Conditions Report 7 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:52 Comment: Node: West Basin Scenario:Icpr3 Type:Stage/Area Base Flow:0.00 cfs Initial Stage:774.64 ft Warning Stage:779.00 ft Stage [ft]Area [ac]Area [ft2] 774.24 0.0000 0 775.00 0.0430 1873 776.00 0.3290 14331 777.00 0.7610 33149 778.00 1.0920 47568 779.00 1.3380 58283 Comment: Pipe Link: L-0040P Scenario:Icpr3 From Node:West Basin To Node:NZA-0090 Link Count:1 Flow Direction:Both Damping:0.0000 ft Length:134.00 ft FHWA Code:0 Entr Loss Coef:0.50 Exit Loss Coef:0.00 Bend Loss Coef:0.00 Bend Location:0.00 dec Energy Switch:Energy Upstream Downstream Invert:774.64 ft Invert:773.63 ft Manning's N:0.0130 Manning's N:0.0130 Geometry: Circular Geometry: Circular Max Depth:1.25 ft Max Depth:1.25 ft Bottom Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Top Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Comment: Pipe Link: L-0050P Scenario:Icpr3 From Node:NZA-0090 To Node:NZA-0100 Link Count:1 Upstream Downstream Invert:773.73 ft Invert:773.15 ft Manning's N:0.0130 Manning's N:0.0130 Geometry: Circular Geometry: Circular Max Depth:1.75 ft Max Depth:1.75 ft Page 65 of 180 Model 2 Proposed Conditions Report 8 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:52 Flow Direction:Both Damping:0.0000 ft Length:144.00 ft FHWA Code:0 Entr Loss Coef:0.50 Exit Loss Coef:0.00 Bend Loss Coef:0.00 Bend Location:0.00 dec Energy Switch:Energy Bottom Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Top Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Comment: Pipe Link: L-0060P Scenario:Icpr3 From Node:NZA-0100 To Node:East Basin Link Count:1 Flow Direction:Both Damping:0.0000 ft Length:219.00 ft FHWA Code:0 Entr Loss Coef:0.50 Exit Loss Coef:0.00 Bend Loss Coef:0.00 Bend Location:0.00 dec Energy Switch:Energy Upstream Downstream Invert:773.05 ft Invert:772.32 ft Manning's N:0.0130 Manning's N:0.0130 Geometry: Horizontal Ellipse Geometry: Horizontal Ellipse Max Depth:2.00 ft Max Depth:2.00 ft Bottom Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Top Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Comment: Drop Structure Link: L-0120DS Scenario:Icpr3 From Node:StormTech To Node:East Basin Link Count:1 Flow Direction:Both Solution:Combine Increments:0 Pipe Count:1 Damping:0.0000 ft Length:436.00 ft FHWA Code:0 Entr Loss Coef:0.50 Exit Loss Coef:0.00 Bend Loss Coef:0.00 Bend Location:0.00 dec Upstream Pipe Downstream Pipe Invert:778.40 ft Invert:775.00 ft Manning's N:0.0120 Manning's N:0.0120 Geometry: Circular Geometry: Circular Max Depth:1.00 ft Max Depth:1.00 ft Bottom Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Top Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0000 Manning's N:0.0000 Page 66 of 180 Model 2 Proposed Conditions Report 9 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:52 Energy Switch:Energy Pipe Comment: Weir Component Weir:1 Weir Count:1 Weir Flow Direction:Both Damping:0.0000 ft Weir Type:Sharp Crested Vertical Geometry Type:Circular Invert:778.40 ft Control Elevation:778.40 ft Max Depth:0.50 ft Bottom Clip Default:0.00 ft Op Table: Ref Node: Top Clip Default:0.00 ft Op Table: Ref Node: Discharge Coefficients Weir Default:3.200 Weir Table: Orifice Default:0.600 Orifice Table: Weir Comment: Model 1: 3" orifice Model 2: 6" orifice Weir Component Weir:2 Weir Count:1 Weir Flow Direction:Both Damping:0.0000 ft Weir Type:Sharp Crested Vertical Geometry Type:Circular Invert:780.50 ft Control Elevation:780.50 ft Max Depth:0.50 ft Bottom Clip Default:0.00 ft Op Table: Ref Node: Top Clip Default:0.00 ft Op Table: Ref Node: Discharge Coefficients Weir Default:3.200 Weir Table: Orifice Default:0.600 Orifice Table: Weir Comment: Model 1 = 3.75" orifice Model 2 = 6" orifice Drop Structure Comment: Drop Structure Link: L-0130DS Scenario:Icpr3 From Node:East Basin To Node:NTZ-0070 Link Count:1 Flow Direction:Both Solution:Combine Increments:0 Upstream Pipe Downstream Pipe Invert:771.48 ft Invert:766.00 ft Manning's N:0.0130 Manning's N:0.0130 Geometry: Circular Geometry: Circular Max Depth:2.00 ft Max Depth:2.00 ft Bottom Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Page 67 of 180 Model 2 Proposed Conditions Report 10 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:52 Pipe Count:1 Damping:0.0000 ft Length:2150.00 ft FHWA Code:0 Entr Loss Coef:0.50 Exit Loss Coef:0.00 Bend Loss Coef:0.00 Bend Location:0.00 dec Energy Switch:Energy Ref Node:Ref Node: Manning's N:0.0130 Manning's N:0.0130 Top Clip Default:0.00 ft Default:0.00 ft Op Table:Op Table: Ref Node:Ref Node: Manning's N:0.0130 Manning's N:0.0130 Pipe Comment: Weir Component Weir:1 Weir Count:1 Weir Flow Direction:Both Damping:0.0000 ft Weir Type:Sharp Crested Vertical Geometry Type:Circular Invert:771.48 ft Control Elevation:771.48 ft Max Depth:2.00 ft Bottom Clip Default:0.00 ft Op Table: Ref Node: Top Clip Default:0.00 ft Op Table: Ref Node: Discharge Coefficients Weir Default:3.200 Weir Table: Orifice Default:0.600 Orifice Table: Weir Comment: 24" pipe Drop Structure Comment: Simulation: DEV10 Scenario:Icpr3 Run Date/Time:2/16/2021 3:09:10 PM Program Version:ICPR4 4.07.06 General Run Mode:Normal Year Month Day Hour [hr] Start Time:0 0 0 0.0000 End Time:0 0 0 60.0000 Hydrology [sec]Surface Hydraulics [sec] Min Calculation Time:60.0000 0.1000 Max Calculation Time:60.0000 Output Time Increments Page 68 of 180 Model 2 Proposed Conditions Report 11 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:52 Hydrology Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 13.0000 15.0000 Surface Hydraulics Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 13.0000 15.0000 Restart File Save Restart:False Resources & Lookup Tables Resources Lookup Tables Rainfall Folder:ICPR3 Boundary Stage Set: Extern Hydrograph Set: Unit Hydrograph Folder: ICPR3 Curve Number Set: Green-Ampt Set: Vertical Layers Set: Impervious Set: Tolerances & Options Time Marching:SAOR IA Recovery Time:24.0000 hr Max Iterations:6 Over-Relax Weight Fact: 0.5 dec dZ Tolerance:0.0010 ft Smp/Man Basin Rain Opt: Global Max dZ:1.0000 ft Link Optimizer Tol:0.0001 ft Rainfall Name:SCSII-24 Rainfall Amount:3.83 in Edge Length Option:Automatic Storm Duration:24.0000 hr Dflt Damping (1D):0.0050 ft Min Node Srf Area (1D): 113 ft2 Energy Switch (1D):Energy Comment: DEVELOPED CONDITIONS DETENTION POND DESIGN 10 YEAR/24 HOUR STORM Page 69 of 180 Model 2 Proposed Conditions Report 12 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:52 Simulation: DEV100 Scenario:Icpr3 Run Date/Time:2/16/2021 3:22:48 PM Program Version:ICPR4 4.07.06 General Run Mode:Normal Year Month Day Hour [hr] Start Time:0 0 0 0.0000 End Time:0 0 0 60.0000 Hydrology [sec]Surface Hydraulics [sec] Min Calculation Time:60.0000 0.1000 Max Calculation Time:60.0000 Output Time Increments Hydrology Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 12.0000 1.0000 0 0 0 12.4000 5.0000 0 0 0 15.0000 15.0000 Surface Hydraulics Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 11.0000 5.0000 0 0 0 12.0000 1.0000 0 0 0 12.4000 5.0000 0 0 0 15.0000 15.0000 Restart File Save Restart:False Resources & Lookup Tables Resources Lookup Tables Rainfall Folder:ICPR3 Boundary Stage Set: Extern Hydrograph Set: Unit Hydrograph Folder: ICPR3 Curve Number Set: Green-Ampt Set: Vertical Layers Set: Impervious Set: Page 70 of 180 Model 2 Proposed Conditions Report 13 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 18:52 Tolerances & Options Time Marching:SAOR IA Recovery Time:24.0000 hr Max Iterations:6 Over-Relax Weight Fact: 0.5 dec dZ Tolerance:0.0010 ft Smp/Man Basin Rain Opt: Global Max dZ:1.0000 ft Link Optimizer Tol:0.0001 ft Rainfall Name:Scsii-24 Rainfall Amount:6.46 in Edge Length Option:Automatic Storm Duration:24.0000 hr Dflt Damping (1D):0.0050 ft Min Node Srf Area (1D): 113 ft2 Energy Switch (1D):Energy Comment: DEVELOPED CONDITIONS DETENTION POND DESIGN 100 YEAR/24 HOUR STORM Page 71 of 180 1D Nodes - Max 1 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 15:40 Sim Node Name Warning Stage [ft]Maximum Stage [ft]Time to Maximum Stage [hrs]Maximum Total Inflow Rate [cfs]Time to Maximum Total Inflow Rate [hrs]Maximum Total Outflow Rate [cfs]Time to Maximum Total Outflow Rate [hrs] DEV10 East Basin 779.00 774.85 13.3162 25.97 12.0175 10.72 13.2990 DEV10 NTZ-0070 773.00 766.00 0.0000 10.72 13.2990 0.00 0.0000 DEV10 StormTech 782.50 780.06 12.8597 13.16 12.0168 1.02 12.8597 DEV10 West Basin 779.00 777.12 13.9092 15.29 12.8999 7.08 14.1906 DEV100 East Basin 779.00 776.52 14.3398 44.78 12.0179 12.14 14.3342 DEV100 NTZ-0070 773.00 766.00 0.0000 12.14 14.3794 0.00 0.0000 DEV100 StormTech 782.50 781.20 12.6777 22.31 12.0167 2.03 12.6777 DEV100 West Basin 779.00 779.14 14.6430 31.81 12.8669 7.49 14.7567 Model 2 5/12/2021 18:52 Page 72 of 180 100% Storage Capacity availableat 48 hours for all basins (refer toNode-Volume chart)Max Storage 2.3 ac-ft @ 14.3 hoursMax Storage 3.07 ac-ft@ 14.6 hoursMax Storage 0.85 ac-ft @ 12.6 hoursPage 73 of 180 1D Nodes - Volume 1 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 East Basin 0.0000 771.47 779.00 0.00 0.00 0.00 0.00 DEV100 East Basin 0.2511 771.52 779.00 0.00 0.00 0.00 0.00 DEV100 East Basin 0.5050 771.51 779.00 0.00 0.00 0.00 0.00 DEV100 East Basin 0.7506 771.50 779.00 0.00 0.00 0.00 0.00 DEV100 East Basin 1.0026 771.55 779.00 0.00 0.00 0.00 0.00 DEV100 East Basin 1.2521 771.56 779.00 0.00 0.00 0.00 0.00 DEV100 East Basin 1.5018 771.58 779.00 0.00 0.00 0.00 0.00 DEV100 East Basin 1.7569 771.61 779.00 0.00 0.00 0.00 0.00 DEV100 East Basin 2.0060 771.64 779.00 0.00 0.00 0.00 0.00 DEV100 East Basin 2.2543 771.65 779.00 0.00 0.00 0.01 0.00 DEV100 East Basin 2.5003 771.67 779.00 0.00 0.00 0.01 0.01 DEV100 East Basin 2.7557 771.68 779.00 0.00 0.00 0.01 0.01 DEV100 East Basin 3.0053 771.69 779.00 0.00 0.00 0.01 0.01 DEV100 East Basin 3.2511 771.71 779.00 0.00 0.00 0.02 0.02 DEV100 East Basin 3.5087 771.71 779.00 0.00 0.00 0.02 0.02 DEV100 East Basin 3.7554 771.73 779.00 0.00 0.00 0.02 0.02 DEV100 East Basin 4.0031 771.75 779.00 0.00 0.00 0.03 0.03 DEV100 East Basin 4.2533 771.77 779.00 0.00 0.00 0.03 0.03 DEV100 East Basin 4.5001 771.78 779.00 0.00 0.00 0.04 0.04 DEV100 East Basin 4.7508 771.79 779.00 0.00 0.00 0.05 0.04 DEV100 East Basin 5.0043 771.81 779.00 0.00 0.00 0.05 0.05 DEV100 East Basin 5.2505 771.81 779.00 0.00 0.00 0.06 0.06 DEV100 East Basin 5.5053 771.83 779.00 0.00 0.00 0.07 0.07 DEV100 East Basin 5.7535 771.83 779.00 0.00 0.00 0.08 0.07 DEV100 East Basin 6.0068 771.85 779.00 0.00 0.00 0.09 0.08 DEV100 East Basin 6.2511 771.89 779.00 0.00 0.00 0.10 0.09 DEV100 East Basin 6.5040 771.91 779.00 0.00 0.00 0.11 0.11 DEV100 East Basin 6.7545 771.94 779.00 0.00 0.00 0.12 0.12 DEV100 East Basin 7.0053 771.96 779.00 0.00 0.00 0.14 0.13 DEV100 East Basin 7.2530 771.99 779.00 0.00 0.00 0.15 0.15 DEV100 East Basin 7.5063 772.02 779.00 0.00 0.00 0.17 0.17 DEV100 East Basin 7.7562 772.05 779.00 0.01 0.01 0.19 0.19 DEV100 East Basin 8.0000 772.08 779.00 0.01 0.01 0.22 0.21 DEV100 East Basin 8.2541 772.11 779.00 0.01 0.01 0.24 0.24 DEV100 East Basin 8.5027 772.17 779.00 0.01 0.01 0.27 0.27 DEV100 East Basin 8.7519 772.19 779.00 0.01 0.01 0.31 0.30 DEV100 East Basin 9.0011 772.24 779.00 0.01 0.01 0.34 0.33 DEV100 East Basin 9.2520 772.29 779.00 0.01 0.01 0.39 0.37 DEV100 East Basin 9.5009 772.33 779.00 0.02 0.01 0.43 0.42 DEV100 East Basin 9.7501 772.38 779.00 0.02 0.02 0.49 0.47 DEV100 East Basin 10.0006 772.43 779.00 0.02 0.02 0.55 0.52 DEV100 East Basin 10.2503 772.49 779.00 0.03 0.03 0.61 0.58 Page 74 of 180 1D Nodes - Volume 2 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 East Basin 10.5008 772.55 779.00 0.03 0.03 0.68 0.65 DEV100 East Basin 10.7518 772.65 779.00 0.04 0.04 0.77 0.73 DEV100 East Basin 11.0001 772.77 779.00 0.05 0.05 0.87 0.82 DEV100 East Basin 11.0844 772.81 779.00 0.06 0.06 0.91 0.85 DEV100 East Basin 11.1677 772.86 779.00 0.06 0.06 0.95 0.89 DEV100 East Basin 11.2503 772.90 779.00 0.07 0.07 0.99 0.93 DEV100 East Basin 11.3341 772.95 779.00 0.07 0.07 1.04 0.97 DEV100 East Basin 11.4171 773.01 779.00 0.08 0.08 1.09 1.01 DEV100 East Basin 11.5008 773.08 779.00 0.09 0.09 1.14 1.05 DEV100 East Basin 11.5835 773.22 779.00 0.11 0.11 1.22 1.10 DEV100 East Basin 11.6669 773.48 779.00 0.17 0.17 1.33 1.16 DEV100 East Basin 11.7503 773.71 779.00 0.23 0.23 1.45 1.22 DEV100 East Basin 11.8334 774.01 779.00 0.32 0.32 1.61 1.29 DEV100 East Basin 11.9167 774.40 779.00 0.49 0.49 1.85 1.36 DEV100 East Basin 12.0001 774.76 779.00 0.70 0.70 2.14 1.43 DEV100 East Basin 12.0167 774.83 779.00 0.75 0.75 2.20 1.45 DEV100 East Basin 12.0334 774.89 779.00 0.80 0.80 2.26 1.46 DEV100 East Basin 12.0500 774.95 779.00 0.84 0.84 2.32 1.48 DEV100 East Basin 12.0667 775.01 779.00 0.88 0.88 2.37 1.49 DEV100 East Basin 12.0834 775.06 779.00 0.92 0.92 2.43 1.51 DEV100 East Basin 12.1002 775.10 779.00 0.96 0.95 2.48 1.52 DEV100 East Basin 12.1168 775.15 779.00 0.99 0.99 2.53 1.54 DEV100 East Basin 12.1335 775.19 779.00 1.03 1.03 2.58 1.55 DEV100 East Basin 12.1502 775.24 779.00 1.06 1.06 2.63 1.57 DEV100 East Basin 12.1669 775.28 779.00 1.10 1.10 2.68 1.58 DEV100 East Basin 12.1836 775.32 779.00 1.14 1.14 2.73 1.60 DEV100 East Basin 12.2001 775.37 779.00 1.17 1.17 2.79 1.61 DEV100 East Basin 12.2168 775.41 779.00 1.21 1.21 2.84 1.63 DEV100 East Basin 12.2337 775.46 779.00 1.25 1.25 2.90 1.65 DEV100 East Basin 12.2502 775.50 779.00 1.29 1.29 2.95 1.66 DEV100 East Basin 12.2669 775.55 779.00 1.33 1.33 3.00 1.68 DEV100 East Basin 12.2835 775.59 779.00 1.37 1.37 3.06 1.69 DEV100 East Basin 12.3002 775.63 779.00 1.40 1.40 3.11 1.71 DEV100 East Basin 12.3169 775.67 779.00 1.44 1.44 3.16 1.72 DEV100 East Basin 12.3334 775.71 779.00 1.48 1.47 3.21 1.74 DEV100 East Basin 12.3504 775.75 779.00 1.51 1.51 3.26 1.76 DEV100 East Basin 12.3670 775.78 779.00 1.54 1.54 3.31 1.77 DEV100 East Basin 12.3835 775.81 779.00 1.58 1.57 3.36 1.79 DEV100 East Basin 12.4004 775.85 779.00 1.61 1.61 3.41 1.80 DEV100 East Basin 12.4834 775.99 779.00 1.74 1.74 3.63 1.88 DEV100 East Basin 12.5669 776.10 779.00 1.85 1.85 3.82 1.96 DEV100 East Basin 12.6501 776.18 779.00 1.93 1.93 3.98 2.05 Page 75 of 180 1D Nodes - Volume 3 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 East Basin 12.7337 776.24 779.00 2.00 2.00 4.13 2.13 DEV100 East Basin 12.8171 776.29 779.00 2.05 2.05 4.26 2.21 DEV100 East Basin 12.9002 776.33 779.00 2.09 2.09 4.38 2.29 DEV100 East Basin 12.9837 776.36 779.00 2.13 2.13 4.50 2.37 DEV100 East Basin 13.0667 776.39 779.00 2.15 2.15 4.61 2.46 DEV100 East Basin 13.1502 776.41 779.00 2.18 2.18 4.72 2.54 DEV100 East Basin 13.2335 776.43 779.00 2.20 2.20 4.82 2.62 DEV100 East Basin 13.3170 776.44 779.00 2.22 2.22 4.92 2.71 DEV100 East Basin 13.4001 776.46 779.00 2.23 2.23 5.02 2.79 DEV100 East Basin 13.4834 776.47 779.00 2.25 2.25 5.12 2.87 DEV100 East Basin 13.5677 776.48 779.00 2.26 2.26 5.21 2.96 DEV100 East Basin 13.6505 776.49 779.00 2.27 2.27 5.31 3.04 DEV100 East Basin 13.7338 776.50 779.00 2.27 2.27 5.40 3.12 DEV100 East Basin 13.8172 776.50 779.00 2.28 2.28 5.49 3.21 DEV100 East Basin 13.9006 776.51 779.00 2.29 2.29 5.58 3.29 DEV100 East Basin 13.9845 776.51 779.00 2.29 2.29 5.67 3.38 DEV100 East Basin 14.0681 776.52 779.00 2.30 2.30 5.75 3.46 DEV100 East Basin 14.1521 776.52 779.00 2.30 2.30 5.84 3.54 DEV100 East Basin 14.2337 776.52 779.00 2.30 2.30 5.92 3.63 DEV100 East Basin 14.3179 776.52 779.00 2.30 2.30 6.01 3.71 DEV100 East Basin 14.4005 776.52 779.00 2.30 2.30 6.09 3.79 DEV100 East Basin 14.4840 776.52 779.00 2.30 2.30 6.18 3.88 DEV100 East Basin 14.5685 776.52 779.00 2.30 2.30 6.26 3.96 DEV100 East Basin 14.6513 776.51 779.00 2.29 2.29 6.34 4.04 DEV100 East Basin 14.7334 776.51 779.00 2.29 2.29 6.42 4.13 DEV100 East Basin 14.8182 776.51 779.00 2.29 2.29 6.50 4.21 DEV100 East Basin 14.9026 776.50 779.00 2.28 2.28 6.58 4.30 DEV100 East Basin 14.9842 776.50 779.00 2.28 2.27 6.65 4.38 DEV100 East Basin 15.0685 776.49 779.00 2.27 2.27 6.73 4.46 DEV100 East Basin 15.3174 776.47 779.00 2.25 2.25 6.96 4.71 DEV100 East Basin 15.5671 776.45 779.00 2.23 2.22 7.19 4.96 DEV100 East Basin 15.8168 776.43 779.00 2.20 2.20 7.41 5.21 DEV100 East Basin 16.0684 776.40 779.00 2.17 2.17 7.63 5.46 DEV100 East Basin 16.3177 776.37 779.00 2.14 2.13 7.84 5.71 DEV100 East Basin 16.5679 776.34 779.00 2.10 2.10 8.06 5.96 DEV100 East Basin 16.8197 776.30 779.00 2.07 2.07 8.27 6.21 DEV100 East Basin 17.0667 776.27 779.00 2.03 2.03 8.48 6.45 DEV100 East Basin 17.3178 776.23 779.00 1.99 1.99 8.69 6.70 DEV100 East Basin 17.5679 776.19 779.00 1.95 1.95 8.89 6.94 DEV100 East Basin 17.8171 776.15 779.00 1.90 1.90 9.09 7.19 DEV100 East Basin 18.0681 776.10 779.00 1.86 1.86 9.29 7.43 DEV100 East Basin 18.3176 776.05 779.00 1.81 1.81 9.48 7.68 Page 76 of 180 1D Nodes - Volume 4 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 East Basin 18.5680 776.00 779.00 1.76 1.76 9.67 7.92 DEV100 East Basin 18.8169 775.95 779.00 1.70 1.70 9.86 8.16 DEV100 East Basin 19.0672 775.89 779.00 1.65 1.65 10.05 8.40 DEV100 East Basin 19.3181 775.84 779.00 1.60 1.60 10.24 8.64 DEV100 East Basin 19.5667 775.78 779.00 1.54 1.54 10.42 8.88 DEV100 East Basin 19.8174 775.72 779.00 1.49 1.49 10.60 9.12 DEV100 East Basin 20.0679 775.66 779.00 1.43 1.43 10.78 9.35 DEV100 East Basin 20.3175 775.59 779.00 1.37 1.37 10.96 9.59 DEV100 East Basin 20.5687 775.52 779.00 1.31 1.31 11.13 9.82 DEV100 East Basin 20.8180 775.45 779.00 1.24 1.24 11.30 10.06 DEV100 East Basin 21.0667 775.38 779.00 1.18 1.18 11.47 10.29 DEV100 East Basin 21.3168 775.30 779.00 1.12 1.11 11.63 10.52 DEV100 East Basin 21.5669 775.22 779.00 1.05 1.05 11.79 10.74 DEV100 East Basin 21.8177 775.14 779.00 0.98 0.98 11.96 10.97 DEV100 East Basin 22.0667 775.05 779.00 0.92 0.92 12.11 11.20 DEV100 East Basin 22.3170 774.97 779.00 0.85 0.85 12.27 11.42 DEV100 East Basin 22.5673 774.87 779.00 0.78 0.78 12.42 11.64 DEV100 East Basin 22.8169 774.76 779.00 0.71 0.71 12.57 11.86 DEV100 East Basin 23.0673 774.65 779.00 0.63 0.63 12.72 12.08 DEV100 East Basin 23.3171 774.51 779.00 0.55 0.55 12.85 12.30 DEV100 East Basin 23.5667 774.27 779.00 0.43 0.43 12.94 12.51 DEV100 East Basin 23.8169 773.93 779.00 0.29 0.29 13.01 12.72 DEV100 East Basin 24.0669 773.45 779.00 0.16 0.16 13.08 12.92 DEV100 East Basin 24.3171 772.90 779.00 0.06 0.06 13.13 13.07 DEV100 East Basin 24.5668 772.47 779.00 0.02 0.02 13.18 13.16 DEV100 East Basin 24.8175 772.28 779.00 0.01 0.01 13.22 13.21 DEV100 East Basin 25.0676 772.19 779.00 0.01 0.01 13.25 13.24 DEV100 East Basin 25.3195 772.12 779.00 0.01 0.01 13.28 13.27 DEV100 East Basin 25.5670 772.06 779.00 0.00 0.00 13.30 13.30 DEV100 East Basin 25.8170 772.00 779.00 0.00 0.00 13.32 13.32 DEV100 East Basin 26.0672 771.96 779.00 0.00 0.00 13.34 13.34 DEV100 East Basin 26.3183 771.94 779.00 0.00 0.00 13.35 13.35 DEV100 East Basin 26.5735 771.91 779.00 0.00 0.00 13.37 13.36 DEV100 East Basin 26.8224 771.89 779.00 0.00 0.00 13.38 13.38 DEV100 East Basin 27.0717 771.87 779.00 0.00 0.00 13.39 13.39 DEV100 East Basin 27.3174 771.84 779.00 0.00 0.00 13.40 13.40 DEV100 East Basin 27.5672 771.81 779.00 0.00 0.00 13.40 13.40 DEV100 East Basin 27.8189 771.80 779.00 0.00 0.00 13.41 13.41 DEV100 East Basin 28.0695 771.78 779.00 0.00 0.00 13.42 13.42 DEV100 East Basin 28.3207 771.76 779.00 0.00 0.00 13.42 13.42 DEV100 East Basin 28.5715 771.75 779.00 0.00 0.00 13.43 13.43 DEV100 East Basin 28.8224 771.73 779.00 0.00 0.00 13.43 13.43 Page 77 of 180 1D Nodes - Volume 5 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 East Basin 29.0722 771.72 779.00 0.00 0.00 13.44 13.44 DEV100 East Basin 29.3282 771.71 779.00 0.00 0.00 13.44 13.44 DEV100 East Basin 29.5762 771.70 779.00 0.00 0.00 13.44 13.44 DEV100 East Basin 29.8328 771.69 779.00 0.00 0.00 13.45 13.45 DEV100 East Basin 30.0828 771.68 779.00 0.00 0.00 13.45 13.45 DEV100 East Basin 30.3328 771.67 779.00 0.00 0.00 13.45 13.45 DEV100 East Basin 30.5828 771.66 779.00 0.00 0.00 13.45 13.45 DEV100 East Basin 30.8328 771.65 779.00 0.00 0.00 13.45 13.46 DEV100 East Basin 31.0828 771.64 779.00 0.00 0.00 13.46 13.46 DEV100 East Basin 31.3328 771.64 779.00 0.00 0.00 13.46 13.46 DEV100 East Basin 31.5828 771.63 779.00 0.00 0.00 13.46 13.46 DEV100 East Basin 31.8328 771.63 779.00 0.00 0.00 13.46 13.46 DEV100 East Basin 32.0828 771.62 779.00 0.00 0.00 13.46 13.46 DEV100 East Basin 32.3328 771.62 779.00 0.00 0.00 13.46 13.46 DEV100 East Basin 32.5828 771.61 779.00 0.00 0.00 13.46 13.47 DEV100 East Basin 32.8328 771.61 779.00 0.00 0.00 13.47 13.47 DEV100 East Basin 33.0828 771.60 779.00 0.00 0.00 13.47 13.47 DEV100 East Basin 33.3328 771.60 779.00 0.00 0.00 13.47 13.47 DEV100 East Basin 33.5828 771.60 779.00 0.00 0.00 13.47 13.47 DEV100 East Basin 33.8328 771.59 779.00 0.00 0.00 13.47 13.47 DEV100 East Basin 34.0828 771.59 779.00 0.00 0.00 13.47 13.47 DEV100 East Basin 34.3328 771.59 779.00 0.00 0.00 13.47 13.47 DEV100 East Basin 34.5828 771.59 779.00 0.00 0.00 13.47 13.47 DEV100 East Basin 34.8328 771.58 779.00 0.00 0.00 13.47 13.47 DEV100 East Basin 35.0828 771.58 779.00 0.00 0.00 13.47 13.47 DEV100 East Basin 35.3328 771.58 779.00 0.00 0.00 13.47 13.47 DEV100 East Basin 35.5828 771.57 779.00 0.00 0.00 13.47 13.47 DEV100 East Basin 35.8328 771.57 779.00 0.00 0.00 13.47 13.48 DEV100 East Basin 36.0828 771.57 779.00 0.00 0.00 13.47 13.48 DEV100 East Basin 36.3328 771.57 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 36.5828 771.57 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 36.8328 771.56 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 37.0828 771.56 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 37.3328 771.56 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 37.5695 771.54 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 37.8177 771.52 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 38.0694 771.51 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 38.3180 771.50 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 38.5817 771.50 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 38.8270 771.50 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 39.0770 771.50 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 39.3270 771.50 779.00 0.00 0.00 13.48 13.48 Page 78 of 180 1D Nodes - Volume 6 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 East Basin 39.5770 771.50 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 39.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 40.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 40.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 40.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 40.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 41.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 41.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 41.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 41.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 42.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 42.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 42.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 42.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 43.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 43.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 43.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 43.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 44.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 44.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 44.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 44.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 45.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 45.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 45.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 45.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 46.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 46.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 46.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 46.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 47.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 47.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 47.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 47.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 48.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 48.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 48.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 48.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 49.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 49.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 49.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 49.8270 771.49 779.00 0.00 0.00 13.48 13.48 Page 79 of 180 1D Nodes - Volume 7 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 East Basin 50.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 50.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 50.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 50.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 51.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 51.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 51.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 51.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 52.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 52.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 52.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 52.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 53.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 53.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 53.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 53.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 54.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 54.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 54.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 54.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 55.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 55.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 55.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 55.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 56.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 56.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 56.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 56.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 57.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 57.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 57.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 57.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 58.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 58.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 58.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 58.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 59.0770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 59.3270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 59.5770 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 East Basin 59.8270 771.49 779.00 0.00 0.00 13.48 13.48 DEV100 StormTech 0.0000 778.50 782.50 0.00 0.00 0.00 0.00 DEV100 StormTech 0.2511 778.44 782.50 0.00 0.00 0.00 0.00 Page 80 of 180 1D Nodes - Volume 8 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 StormTech 0.5050 778.42 782.50 0.00 0.00 0.00 0.00 DEV100 StormTech 0.7506 778.42 782.50 0.00 0.00 0.00 0.00 DEV100 StormTech 1.0026 778.50 782.50 0.00 0.00 0.00 0.00 DEV100 StormTech 1.2521 778.50 782.50 0.00 0.00 0.00 0.00 DEV100 StormTech 1.5018 778.51 782.50 0.00 0.00 0.00 0.00 DEV100 StormTech 1.7569 778.52 782.50 0.00 0.00 0.01 0.00 DEV100 StormTech 2.0060 778.53 782.50 0.01 0.01 0.01 0.00 DEV100 StormTech 2.2543 778.54 782.50 0.01 0.01 0.01 0.00 DEV100 StormTech 2.5003 778.55 782.50 0.01 0.01 0.01 0.00 DEV100 StormTech 2.7557 778.57 782.50 0.01 0.01 0.02 0.01 DEV100 StormTech 3.0053 778.58 782.50 0.02 0.02 0.02 0.01 DEV100 StormTech 3.2511 778.59 782.50 0.02 0.02 0.03 0.01 DEV100 StormTech 3.5087 778.61 782.50 0.02 0.02 0.03 0.01 DEV100 StormTech 3.7554 778.62 782.50 0.02 0.02 0.03 0.01 DEV100 StormTech 4.0031 778.63 782.50 0.02 0.02 0.04 0.01 DEV100 StormTech 4.2533 778.65 782.50 0.03 0.03 0.04 0.01 DEV100 StormTech 4.5001 778.67 782.50 0.03 0.03 0.05 0.02 DEV100 StormTech 4.7508 778.68 782.50 0.03 0.03 0.05 0.02 DEV100 StormTech 5.0043 778.70 782.50 0.04 0.04 0.06 0.02 DEV100 StormTech 5.2505 778.71 782.50 0.04 0.04 0.07 0.03 DEV100 StormTech 5.5053 778.73 782.50 0.04 0.04 0.07 0.03 DEV100 StormTech 5.7535 778.74 782.50 0.04 0.04 0.08 0.03 DEV100 StormTech 6.0068 778.75 782.50 0.05 0.05 0.08 0.04 DEV100 StormTech 6.2511 778.76 782.50 0.05 0.05 0.09 0.04 DEV100 StormTech 6.5040 778.78 782.50 0.05 0.05 0.10 0.05 DEV100 StormTech 6.7545 778.79 782.50 0.05 0.05 0.11 0.05 DEV100 StormTech 7.0053 778.81 782.50 0.06 0.06 0.12 0.06 DEV100 StormTech 7.2530 778.82 782.50 0.06 0.06 0.12 0.06 DEV100 StormTech 7.5063 778.83 782.50 0.06 0.06 0.13 0.07 DEV100 StormTech 7.7562 778.84 782.50 0.06 0.06 0.14 0.08 DEV100 StormTech 8.0000 778.85 782.50 0.07 0.07 0.15 0.08 DEV100 StormTech 8.2541 778.87 782.50 0.07 0.07 0.16 0.09 DEV100 StormTech 8.5027 778.89 782.50 0.07 0.07 0.17 0.10 DEV100 StormTech 8.7519 778.91 782.50 0.08 0.08 0.18 0.10 DEV100 StormTech 9.0011 778.93 782.50 0.08 0.08 0.19 0.11 DEV100 StormTech 9.2520 778.95 782.50 0.08 0.08 0.20 0.12 DEV100 StormTech 9.5009 778.97 782.50 0.09 0.09 0.22 0.13 DEV100 StormTech 9.7501 778.99 782.50 0.09 0.09 0.23 0.14 DEV100 StormTech 10.0006 779.00 782.50 0.10 0.10 0.24 0.15 DEV100 StormTech 10.2503 779.02 782.50 0.10 0.10 0.26 0.16 DEV100 StormTech 10.5008 779.04 782.50 0.11 0.11 0.28 0.17 DEV100 StormTech 10.7518 779.08 782.50 0.12 0.12 0.30 0.18 Page 81 of 180 1D Nodes - Volume 9 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 StormTech 11.0001 779.12 782.50 0.14 0.14 0.33 0.19 DEV100 StormTech 11.0844 779.14 782.50 0.15 0.15 0.34 0.19 DEV100 StormTech 11.1677 779.16 782.50 0.15 0.15 0.35 0.20 DEV100 StormTech 11.2503 779.17 782.50 0.16 0.16 0.36 0.20 DEV100 StormTech 11.3341 779.19 782.50 0.17 0.17 0.37 0.21 DEV100 StormTech 11.4171 779.22 782.50 0.18 0.18 0.39 0.21 DEV100 StormTech 11.5008 779.24 782.50 0.19 0.19 0.40 0.21 DEV100 StormTech 11.5835 779.28 782.50 0.20 0.20 0.42 0.22 DEV100 StormTech 11.6669 779.36 782.50 0.23 0.23 0.46 0.22 DEV100 StormTech 11.7503 779.48 782.50 0.28 0.28 0.51 0.23 DEV100 StormTech 11.8334 779.62 782.50 0.33 0.33 0.57 0.23 DEV100 StormTech 11.9167 779.89 782.50 0.43 0.43 0.67 0.24 DEV100 StormTech 12.0001 780.27 782.50 0.57 0.57 0.81 0.25 DEV100 StormTech 12.0167 780.35 782.50 0.60 0.60 0.84 0.25 DEV100 StormTech 12.0334 780.44 782.50 0.62 0.62 0.87 0.25 DEV100 StormTech 12.0500 780.53 782.50 0.65 0.65 0.90 0.25 DEV100 StormTech 12.0667 780.61 782.50 0.68 0.68 0.93 0.25 DEV100 StormTech 12.0834 780.69 782.50 0.70 0.70 0.96 0.25 DEV100 StormTech 12.1002 780.76 782.50 0.73 0.73 0.98 0.26 DEV100 StormTech 12.1168 780.82 782.50 0.75 0.75 1.00 0.26 DEV100 StormTech 12.1335 780.87 782.50 0.76 0.76 1.02 0.26 DEV100 StormTech 12.1502 780.92 782.50 0.77 0.77 1.04 0.26 DEV100 StormTech 12.1669 780.96 782.50 0.79 0.79 1.05 0.26 DEV100 StormTech 12.1836 780.99 782.50 0.79 0.79 1.06 0.27 DEV100 StormTech 12.2001 781.02 782.50 0.80 0.80 1.07 0.27 DEV100 StormTech 12.2168 781.04 782.50 0.81 0.81 1.08 0.27 DEV100 StormTech 12.2337 781.06 782.50 0.81 0.81 1.09 0.27 DEV100 StormTech 12.2502 781.08 782.50 0.82 0.82 1.10 0.28 DEV100 StormTech 12.2669 781.10 782.50 0.82 0.82 1.10 0.28 DEV100 StormTech 12.2835 781.11 782.50 0.83 0.83 1.11 0.28 DEV100 StormTech 12.3002 781.12 782.50 0.83 0.83 1.12 0.28 DEV100 StormTech 12.3169 781.14 782.50 0.83 0.83 1.12 0.29 DEV100 StormTech 12.3334 781.15 782.50 0.84 0.84 1.13 0.29 DEV100 StormTech 12.3504 781.16 782.50 0.84 0.84 1.13 0.29 DEV100 StormTech 12.3670 781.16 782.50 0.84 0.84 1.14 0.30 DEV100 StormTech 12.3835 781.17 782.50 0.84 0.84 1.14 0.30 DEV100 StormTech 12.4004 781.18 782.50 0.84 0.84 1.14 0.30 DEV100 StormTech 12.4834 781.19 782.50 0.85 0.85 1.16 0.31 DEV100 StormTech 12.5669 781.20 782.50 0.85 0.85 1.18 0.33 DEV100 StormTech 12.6501 781.20 782.50 0.85 0.85 1.19 0.34 DEV100 StormTech 12.7337 781.20 782.50 0.85 0.85 1.21 0.36 DEV100 StormTech 12.8171 781.20 782.50 0.85 0.85 1.22 0.37 Page 82 of 180 1D Nodes - Volume 10 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 StormTech 12.9002 781.19 782.50 0.85 0.85 1.23 0.38 DEV100 StormTech 12.9837 781.17 782.50 0.84 0.84 1.24 0.40 DEV100 StormTech 13.0667 781.16 782.50 0.84 0.84 1.25 0.41 DEV100 StormTech 13.1502 781.14 782.50 0.84 0.84 1.26 0.43 DEV100 StormTech 13.2335 781.12 782.50 0.83 0.83 1.27 0.44 DEV100 StormTech 13.3170 781.11 782.50 0.83 0.83 1.28 0.45 DEV100 StormTech 13.4001 781.09 782.50 0.82 0.82 1.29 0.47 DEV100 StormTech 13.4834 781.06 782.50 0.82 0.82 1.29 0.48 DEV100 StormTech 13.5677 781.04 782.50 0.81 0.81 1.30 0.49 DEV100 StormTech 13.6505 781.02 782.50 0.80 0.80 1.31 0.50 DEV100 StormTech 13.7338 781.00 782.50 0.80 0.80 1.32 0.52 DEV100 StormTech 13.8172 780.98 782.50 0.79 0.79 1.32 0.53 DEV100 StormTech 13.9006 780.96 782.50 0.79 0.79 1.33 0.54 DEV100 StormTech 13.9845 780.94 782.50 0.78 0.78 1.33 0.55 DEV100 StormTech 14.0681 780.92 782.50 0.78 0.78 1.34 0.56 DEV100 StormTech 14.1521 780.90 782.50 0.77 0.77 1.35 0.58 DEV100 StormTech 14.2337 780.88 782.50 0.76 0.76 1.35 0.59 DEV100 StormTech 14.3179 780.86 782.50 0.76 0.76 1.36 0.60 DEV100 StormTech 14.4005 780.84 782.50 0.75 0.75 1.36 0.61 DEV100 StormTech 14.4840 780.82 782.50 0.75 0.75 1.36 0.62 DEV100 StormTech 14.5685 780.80 782.50 0.74 0.74 1.37 0.63 DEV100 StormTech 14.6513 780.78 782.50 0.73 0.73 1.37 0.64 DEV100 StormTech 14.7334 780.76 782.50 0.73 0.73 1.38 0.65 DEV100 StormTech 14.8182 780.74 782.50 0.72 0.72 1.38 0.66 DEV100 StormTech 14.9026 780.72 782.50 0.72 0.72 1.39 0.67 DEV100 StormTech 14.9842 780.71 782.50 0.71 0.71 1.39 0.68 DEV100 StormTech 15.0685 780.69 782.50 0.70 0.70 1.39 0.69 DEV100 StormTech 15.3174 780.64 782.50 0.69 0.69 1.41 0.72 DEV100 StormTech 15.5671 780.59 782.50 0.67 0.67 1.42 0.74 DEV100 StormTech 15.8168 780.54 782.50 0.66 0.66 1.43 0.77 DEV100 StormTech 16.0684 780.50 782.50 0.64 0.64 1.44 0.79 DEV100 StormTech 16.3177 780.46 782.50 0.63 0.63 1.45 0.82 DEV100 StormTech 16.5679 780.41 782.50 0.61 0.61 1.46 0.84 DEV100 StormTech 16.8197 780.37 782.50 0.60 0.60 1.47 0.87 DEV100 StormTech 17.0667 780.32 782.50 0.58 0.58 1.47 0.89 DEV100 StormTech 17.3178 780.28 782.50 0.57 0.57 1.48 0.91 DEV100 StormTech 17.5679 780.24 782.50 0.55 0.55 1.49 0.94 DEV100 StormTech 17.8171 780.19 782.50 0.54 0.54 1.50 0.96 DEV100 StormTech 18.0681 780.15 782.50 0.52 0.52 1.51 0.98 DEV100 StormTech 18.3176 780.11 782.50 0.51 0.51 1.51 1.00 DEV100 StormTech 18.5680 780.06 782.50 0.49 0.49 1.52 1.03 DEV100 StormTech 18.8169 780.02 782.50 0.48 0.48 1.53 1.05 Page 83 of 180 1D Nodes - Volume 11 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 StormTech 19.0672 779.98 782.50 0.47 0.47 1.53 1.07 DEV100 StormTech 19.3181 779.95 782.50 0.45 0.45 1.54 1.09 DEV100 StormTech 19.5667 779.91 782.50 0.44 0.44 1.55 1.11 DEV100 StormTech 19.8174 779.88 782.50 0.43 0.43 1.56 1.13 DEV100 StormTech 20.0679 779.84 782.50 0.41 0.41 1.56 1.15 DEV100 StormTech 20.3175 779.80 782.50 0.40 0.40 1.57 1.17 DEV100 StormTech 20.5687 779.76 782.50 0.39 0.38 1.57 1.19 DEV100 StormTech 20.8180 779.73 782.50 0.37 0.37 1.58 1.20 DEV100 StormTech 21.0667 779.69 782.50 0.36 0.36 1.58 1.22 DEV100 StormTech 21.3168 779.66 782.50 0.35 0.35 1.59 1.24 DEV100 StormTech 21.5669 779.63 782.50 0.33 0.33 1.59 1.26 DEV100 StormTech 21.8177 779.60 782.50 0.32 0.32 1.60 1.27 DEV100 StormTech 22.0667 779.56 782.50 0.31 0.31 1.60 1.29 DEV100 StormTech 22.3170 779.53 782.50 0.30 0.30 1.61 1.31 DEV100 StormTech 22.5673 779.51 782.50 0.29 0.29 1.61 1.32 DEV100 StormTech 22.8169 779.48 782.50 0.28 0.28 1.62 1.34 DEV100 StormTech 23.0673 779.45 782.50 0.27 0.27 1.62 1.36 DEV100 StormTech 23.3171 779.43 782.50 0.26 0.26 1.63 1.37 DEV100 StormTech 23.5667 779.40 782.50 0.25 0.25 1.63 1.39 DEV100 StormTech 23.8169 779.37 782.50 0.24 0.24 1.64 1.40 DEV100 StormTech 24.0669 779.35 782.50 0.23 0.23 1.64 1.41 DEV100 StormTech 24.3171 779.31 782.50 0.21 0.21 1.64 1.43 DEV100 StormTech 24.5668 779.28 782.50 0.20 0.20 1.64 1.44 DEV100 StormTech 24.8175 779.24 782.50 0.19 0.19 1.64 1.46 DEV100 StormTech 25.0676 779.21 782.50 0.17 0.17 1.64 1.47 DEV100 StormTech 25.3195 779.18 782.50 0.16 0.16 1.64 1.48 DEV100 StormTech 25.5670 779.15 782.50 0.15 0.15 1.64 1.49 DEV100 StormTech 25.8170 779.12 782.50 0.14 0.14 1.64 1.50 DEV100 StormTech 26.0672 779.09 782.50 0.13 0.13 1.64 1.52 DEV100 StormTech 26.3183 779.06 782.50 0.12 0.12 1.64 1.53 DEV100 StormTech 26.5735 779.03 782.50 0.10 0.10 1.64 1.54 DEV100 StormTech 26.8224 778.99 782.50 0.09 0.09 1.64 1.55 DEV100 StormTech 27.0717 778.96 782.50 0.09 0.09 1.64 1.56 DEV100 StormTech 27.3174 778.92 782.50 0.08 0.08 1.64 1.57 DEV100 StormTech 27.5672 778.88 782.50 0.07 0.07 1.64 1.57 DEV100 StormTech 27.8189 778.84 782.50 0.06 0.06 1.64 1.58 DEV100 StormTech 28.0695 778.81 782.50 0.06 0.06 1.64 1.58 DEV100 StormTech 28.3207 778.78 782.50 0.05 0.05 1.64 1.59 DEV100 StormTech 28.5715 778.76 782.50 0.05 0.05 1.64 1.59 DEV100 StormTech 28.8224 778.73 782.50 0.04 0.04 1.64 1.60 DEV100 StormTech 29.0722 778.71 782.50 0.04 0.04 1.64 1.60 DEV100 StormTech 29.3282 778.70 782.50 0.04 0.04 1.64 1.61 Page 84 of 180 1D Nodes - Volume 12 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 StormTech 29.5762 778.68 782.50 0.03 0.03 1.64 1.61 DEV100 StormTech 29.8328 778.66 782.50 0.03 0.03 1.64 1.61 DEV100 StormTech 30.0828 778.65 782.50 0.03 0.03 1.64 1.61 DEV100 StormTech 30.3328 778.64 782.50 0.03 0.03 1.64 1.62 DEV100 StormTech 30.5828 778.63 782.50 0.02 0.02 1.64 1.62 DEV100 StormTech 30.8328 778.62 782.50 0.02 0.02 1.64 1.62 DEV100 StormTech 31.0828 778.61 782.50 0.02 0.02 1.64 1.62 DEV100 StormTech 31.3328 778.60 782.50 0.02 0.02 1.64 1.62 DEV100 StormTech 31.5828 778.59 782.50 0.02 0.02 1.64 1.63 DEV100 StormTech 31.8328 778.58 782.50 0.02 0.02 1.64 1.63 DEV100 StormTech 32.0828 778.57 782.50 0.01 0.01 1.64 1.63 DEV100 StormTech 32.3328 778.57 782.50 0.01 0.01 1.64 1.63 DEV100 StormTech 32.5828 778.56 782.50 0.01 0.01 1.64 1.63 DEV100 StormTech 32.8328 778.56 782.50 0.01 0.01 1.64 1.63 DEV100 StormTech 33.0828 778.55 782.50 0.01 0.01 1.64 1.63 DEV100 StormTech 33.3328 778.55 782.50 0.01 0.01 1.64 1.63 DEV100 StormTech 33.5828 778.54 782.50 0.01 0.01 1.64 1.63 DEV100 StormTech 33.8328 778.54 782.50 0.01 0.01 1.64 1.63 DEV100 StormTech 34.0828 778.53 782.50 0.01 0.01 1.64 1.64 DEV100 StormTech 34.3328 778.53 782.50 0.01 0.01 1.64 1.64 DEV100 StormTech 34.5828 778.53 782.50 0.01 0.01 1.64 1.64 DEV100 StormTech 34.8328 778.52 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 35.0828 778.52 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 35.3328 778.52 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 35.5828 778.52 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 35.8328 778.51 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 36.0828 778.51 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 36.3328 778.51 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 36.5828 778.51 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 36.8328 778.50 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 37.0828 778.50 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 37.3328 778.50 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 37.5695 778.45 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 37.8177 778.43 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 38.0694 778.42 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 38.3180 778.41 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 38.5817 778.41 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 38.8270 778.41 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 39.0770 778.41 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 39.3270 778.41 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 39.5770 778.41 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 39.8270 778.41 782.50 0.00 0.00 1.64 1.64 Page 85 of 180 1D Nodes - Volume 13 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 StormTech 40.0770 778.41 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 40.3270 778.41 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 40.5770 778.41 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 40.8270 778.41 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 41.0770 778.41 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 41.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 41.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 41.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 42.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 42.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 42.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 42.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 43.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 43.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 43.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 43.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 44.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 44.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 44.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 44.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 45.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 45.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 45.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 45.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 46.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 46.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 46.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 46.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 47.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 47.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 47.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 47.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 48.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 48.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 48.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 48.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 49.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 49.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 49.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 49.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 50.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 50.3270 778.40 782.50 0.00 0.00 1.64 1.64 Page 86 of 180 1D Nodes - Volume 14 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 StormTech 50.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 50.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 51.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 51.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 51.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 51.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 52.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 52.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 52.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 52.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 53.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 53.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 53.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 53.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 54.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 54.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 54.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 54.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 55.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 55.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 55.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 55.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 56.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 56.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 56.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 56.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 57.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 57.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 57.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 57.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 58.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 58.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 58.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 58.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 59.0770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 59.3270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 59.5770 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 StormTech 59.8270 778.40 782.50 0.00 0.00 1.64 1.64 DEV100 West Basin 0.0000 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 0.2511 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 0.5050 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 0.7506 774.64 779.00 0.00 0.00 0.00 0.00 Page 87 of 180 1D Nodes - Volume 15 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 West Basin 1.0026 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 1.2521 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 1.5018 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 1.7569 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 2.0060 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 2.2543 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 2.5003 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 2.7557 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 3.0053 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 3.2511 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 3.5087 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 3.7554 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 4.0031 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 4.2533 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 4.5001 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 4.7508 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 5.0043 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 5.2505 774.64 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 5.5053 774.65 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 5.7535 774.66 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 6.0068 774.69 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 6.2511 774.73 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 6.5040 774.76 779.00 0.00 0.00 0.00 0.00 DEV100 West Basin 6.7545 774.79 779.00 0.00 0.00 0.01 0.00 DEV100 West Basin 7.0053 774.83 779.00 0.01 0.01 0.01 0.01 DEV100 West Basin 7.2530 774.85 779.00 0.01 0.01 0.02 0.01 DEV100 West Basin 7.5063 774.88 779.00 0.01 0.01 0.02 0.02 DEV100 West Basin 7.7562 774.90 779.00 0.01 0.01 0.03 0.02 DEV100 West Basin 8.0000 774.93 779.00 0.01 0.01 0.04 0.03 DEV100 West Basin 8.2541 774.95 779.00 0.01 0.01 0.05 0.04 DEV100 West Basin 8.5027 774.96 779.00 0.01 0.01 0.06 0.05 DEV100 West Basin 8.7519 774.99 779.00 0.01 0.01 0.07 0.06 DEV100 West Basin 9.0011 775.02 779.00 0.01 0.01 0.09 0.07 DEV100 West Basin 9.2520 775.05 779.00 0.01 0.01 0.10 0.09 DEV100 West Basin 9.5009 775.08 779.00 0.02 0.02 0.12 0.11 DEV100 West Basin 9.7501 775.11 779.00 0.02 0.02 0.15 0.13 DEV100 West Basin 10.0006 775.14 779.00 0.02 0.02 0.17 0.15 DEV100 West Basin 10.2503 775.17 779.00 0.02 0.02 0.20 0.17 DEV100 West Basin 10.5008 775.20 779.00 0.03 0.03 0.23 0.20 DEV100 West Basin 10.7518 775.24 779.00 0.03 0.03 0.26 0.23 DEV100 West Basin 11.0001 775.28 779.00 0.04 0.04 0.30 0.27 DEV100 West Basin 11.0844 775.29 779.00 0.04 0.04 0.32 0.28 Page 88 of 180 1D Nodes - Volume 16 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 West Basin 11.1677 775.31 779.00 0.04 0.04 0.33 0.29 DEV100 West Basin 11.2503 775.33 779.00 0.04 0.04 0.35 0.31 DEV100 West Basin 11.3341 775.35 779.00 0.05 0.05 0.37 0.32 DEV100 West Basin 11.4171 775.37 779.00 0.05 0.05 0.39 0.34 DEV100 West Basin 11.5008 775.40 779.00 0.05 0.05 0.41 0.36 DEV100 West Basin 11.5835 775.41 779.00 0.05 0.05 0.43 0.38 DEV100 West Basin 11.6669 775.41 779.00 0.06 0.06 0.46 0.40 DEV100 West Basin 11.7503 775.44 779.00 0.06 0.06 0.48 0.42 DEV100 West Basin 11.8334 775.51 779.00 0.07 0.07 0.51 0.44 DEV100 West Basin 11.9167 775.72 779.00 0.12 0.12 0.56 0.44 DEV100 West Basin 12.0001 775.96 779.00 0.19 0.19 0.63 0.44 DEV100 West Basin 12.0167 776.01 779.00 0.20 0.20 0.64 0.44 DEV100 West Basin 12.0334 776.05 779.00 0.22 0.22 0.66 0.44 DEV100 West Basin 12.0500 776.09 779.00 0.23 0.23 0.67 0.44 DEV100 West Basin 12.0667 776.12 779.00 0.24 0.24 0.68 0.44 DEV100 West Basin 12.0834 776.14 779.00 0.25 0.25 0.70 0.45 DEV100 West Basin 12.1002 776.16 779.00 0.26 0.26 0.71 0.45 DEV100 West Basin 12.1168 776.18 779.00 0.27 0.27 0.72 0.46 DEV100 West Basin 12.1335 776.21 779.00 0.28 0.28 0.74 0.46 DEV100 West Basin 12.1502 776.23 779.00 0.29 0.29 0.75 0.47 DEV100 West Basin 12.1669 776.25 779.00 0.30 0.30 0.77 0.47 DEV100 West Basin 12.1836 776.28 779.00 0.31 0.31 0.79 0.48 DEV100 West Basin 12.2001 776.30 779.00 0.32 0.32 0.80 0.48 DEV100 West Basin 12.2168 776.33 779.00 0.33 0.33 0.82 0.49 DEV100 West Basin 12.2337 776.36 779.00 0.35 0.35 0.84 0.50 DEV100 West Basin 12.2502 776.39 779.00 0.36 0.36 0.86 0.50 DEV100 West Basin 12.2669 776.42 779.00 0.38 0.38 0.88 0.51 DEV100 West Basin 12.2835 776.45 779.00 0.39 0.39 0.90 0.51 DEV100 West Basin 12.3002 776.49 779.00 0.41 0.41 0.93 0.52 DEV100 West Basin 12.3169 776.52 779.00 0.43 0.43 0.95 0.52 DEV100 West Basin 12.3334 776.55 779.00 0.45 0.45 0.97 0.53 DEV100 West Basin 12.3504 776.59 779.00 0.47 0.47 1.00 0.53 DEV100 West Basin 12.3670 776.62 779.00 0.49 0.49 1.03 0.54 DEV100 West Basin 12.3835 776.66 779.00 0.51 0.51 1.05 0.54 DEV100 West Basin 12.4004 776.69 779.00 0.53 0.53 1.08 0.55 DEV100 West Basin 12.4834 776.88 779.00 0.66 0.66 1.24 0.58 DEV100 West Basin 12.5669 777.08 779.00 0.81 0.81 1.41 0.61 DEV100 West Basin 12.6501 777.28 779.00 0.97 0.97 1.61 0.64 DEV100 West Basin 12.7337 777.48 779.00 1.15 1.15 1.82 0.67 DEV100 West Basin 12.8171 777.67 779.00 1.33 1.33 2.03 0.70 DEV100 West Basin 12.9002 777.85 779.00 1.51 1.51 2.25 0.74 DEV100 West Basin 12.9837 778.01 779.00 1.69 1.69 2.47 0.78 Page 89 of 180 1D Nodes - Volume 17 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 West Basin 13.0667 778.17 779.00 1.86 1.86 2.68 0.82 DEV100 West Basin 13.1502 778.31 779.00 2.02 2.02 2.88 0.86 DEV100 West Basin 13.2335 778.44 779.00 2.17 2.17 3.08 0.91 DEV100 West Basin 13.3170 778.55 779.00 2.31 2.31 3.26 0.95 DEV100 West Basin 13.4001 778.65 779.00 2.43 2.43 3.43 1.00 DEV100 West Basin 13.4834 778.73 779.00 2.54 2.54 3.58 1.05 DEV100 West Basin 13.5677 778.81 779.00 2.63 2.63 3.73 1.09 DEV100 West Basin 13.6505 778.87 779.00 2.71 2.71 3.86 1.14 DEV100 West Basin 13.7338 778.92 779.00 2.78 2.78 3.97 1.19 DEV100 West Basin 13.8172 778.97 779.00 2.84 2.84 4.08 1.24 DEV100 West Basin 13.9006 779.01 779.00 2.89 2.89 4.18 1.29 DEV100 West Basin 13.9845 779.04 779.00 2.94 2.94 4.28 1.34 DEV100 West Basin 14.0681 779.07 779.00 2.97 2.97 4.36 1.39 DEV100 West Basin 14.1521 779.09 779.00 3.00 3.00 4.45 1.44 DEV100 West Basin 14.2337 779.10 779.00 3.03 3.03 4.52 1.49 DEV100 West Basin 14.3179 779.12 779.00 3.04 3.04 4.59 1.54 DEV100 West Basin 14.4005 779.13 779.00 3.06 3.06 4.65 1.59 DEV100 West Basin 14.4840 779.14 779.00 3.07 3.07 4.71 1.65 DEV100 West Basin 14.5685 779.14 779.00 3.07 3.07 4.77 1.70 DEV100 West Basin 14.6513 779.14 779.00 3.07 3.07 4.82 1.75 DEV100 West Basin 14.7334 779.14 779.00 3.07 3.07 4.87 1.80 DEV100 West Basin 14.8182 779.14 779.00 3.07 3.07 4.92 1.85 DEV100 West Basin 14.9026 779.13 779.00 3.06 3.06 4.96 1.91 DEV100 West Basin 14.9842 779.12 779.00 3.05 3.05 5.00 1.96 DEV100 West Basin 15.0685 779.11 779.00 3.04 3.04 5.04 2.01 DEV100 West Basin 15.3174 779.08 779.00 2.99 2.99 5.15 2.16 DEV100 West Basin 15.5671 779.03 779.00 2.93 2.93 5.24 2.31 DEV100 West Basin 15.8168 778.98 779.00 2.86 2.85 5.32 2.47 DEV100 West Basin 16.0684 778.92 779.00 2.78 2.78 5.40 2.62 DEV100 West Basin 16.3177 778.85 779.00 2.69 2.69 5.46 2.77 DEV100 West Basin 16.5679 778.78 779.00 2.60 2.60 5.53 2.92 DEV100 West Basin 16.8197 778.71 779.00 2.51 2.51 5.58 3.07 DEV100 West Basin 17.0667 778.64 779.00 2.42 2.42 5.64 3.22 DEV100 West Basin 17.3178 778.56 779.00 2.33 2.32 5.69 3.37 DEV100 West Basin 17.5679 778.49 779.00 2.23 2.23 5.74 3.51 DEV100 West Basin 17.8171 778.41 779.00 2.13 2.13 5.79 3.66 DEV100 West Basin 18.0681 778.32 779.00 2.04 2.04 5.84 3.80 DEV100 West Basin 18.3176 778.24 779.00 1.94 1.94 5.88 3.94 DEV100 West Basin 18.5680 778.15 779.00 1.84 1.84 5.92 4.08 DEV100 West Basin 18.8169 778.07 779.00 1.74 1.74 5.97 4.22 DEV100 West Basin 19.0672 777.98 779.00 1.65 1.64 6.01 4.36 DEV100 West Basin 19.3181 777.88 779.00 1.55 1.55 6.04 4.50 Page 90 of 180 1D Nodes - Volume 18 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 West Basin 19.5667 777.79 779.00 1.45 1.45 6.08 4.63 DEV100 West Basin 19.8174 777.69 779.00 1.35 1.35 6.12 4.77 DEV100 West Basin 20.0679 777.59 779.00 1.25 1.25 6.15 4.90 DEV100 West Basin 20.3175 777.48 779.00 1.15 1.15 6.19 5.04 DEV100 West Basin 20.5687 777.38 779.00 1.05 1.05 6.22 5.17 DEV100 West Basin 20.8180 777.26 779.00 0.96 0.96 6.25 5.30 DEV100 West Basin 21.0667 777.15 779.00 0.86 0.86 6.28 5.43 DEV100 West Basin 21.3168 777.02 779.00 0.76 0.76 6.31 5.55 DEV100 West Basin 21.5669 776.89 779.00 0.66 0.66 6.34 5.68 DEV100 West Basin 21.8177 776.75 779.00 0.57 0.57 6.37 5.80 DEV100 West Basin 22.0667 776.60 779.00 0.48 0.47 6.40 5.92 DEV100 West Basin 22.3170 776.44 779.00 0.38 0.38 6.42 6.04 DEV100 West Basin 22.5673 776.25 779.00 0.30 0.29 6.45 6.16 DEV100 West Basin 22.8169 776.03 779.00 0.21 0.21 6.48 6.27 DEV100 West Basin 23.0673 775.77 779.00 0.13 0.13 6.50 6.37 DEV100 West Basin 23.3171 775.45 779.00 0.06 0.06 6.53 6.47 DEV100 West Basin 23.5667 775.28 779.00 0.04 0.03 6.56 6.52 DEV100 West Basin 23.8169 775.21 779.00 0.03 0.03 6.58 6.55 DEV100 West Basin 24.0669 775.19 779.00 0.03 0.02 6.61 6.58 DEV100 West Basin 24.3171 775.17 779.00 0.02 0.02 6.63 6.61 DEV100 West Basin 24.5668 775.15 779.00 0.02 0.02 6.66 6.64 DEV100 West Basin 24.8175 775.12 779.00 0.02 0.02 6.68 6.66 DEV100 West Basin 25.0676 775.06 779.00 0.02 0.01 6.69 6.68 DEV100 West Basin 25.3195 774.99 779.00 0.01 0.01 6.70 6.69 DEV100 West Basin 25.5670 774.92 779.00 0.01 0.01 6.71 6.70 DEV100 West Basin 25.8170 774.87 779.00 0.01 0.01 6.72 6.71 DEV100 West Basin 26.0672 774.83 779.00 0.01 0.00 6.72 6.72 DEV100 West Basin 26.3183 774.80 779.00 0.00 0.00 6.72 6.72 DEV100 West Basin 26.5735 774.77 779.00 0.00 0.00 6.72 6.72 DEV100 West Basin 26.8224 774.75 779.00 0.00 0.00 6.72 6.72 DEV100 West Basin 27.0717 774.73 779.00 0.00 0.00 6.73 6.72 DEV100 West Basin 27.3174 774.72 779.00 0.00 0.00 6.73 6.72 DEV100 West Basin 27.5672 774.71 779.00 0.00 0.00 6.73 6.72 DEV100 West Basin 27.8189 774.70 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 28.0695 774.70 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 28.3207 774.69 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 28.5715 774.68 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 28.8224 774.68 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 29.0722 774.67 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 29.3282 774.67 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 29.5762 774.67 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 29.8328 774.67 779.00 0.00 0.00 6.73 6.73 Page 91 of 180 1D Nodes - Volume 19 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 West Basin 30.0828 774.66 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 30.3328 774.66 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 30.5828 774.66 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 30.8328 774.66 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 31.0828 774.66 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 31.3328 774.66 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 31.5828 774.66 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 31.8328 774.66 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 32.0828 774.66 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 32.3328 774.66 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 32.5828 774.66 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 32.8328 774.66 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 33.0828 774.66 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 33.3328 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 33.5828 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 33.8328 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 34.0828 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 34.3328 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 34.5828 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 34.8328 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 35.0828 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 35.3328 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 35.5828 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 35.8328 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 36.0828 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 36.3328 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 36.5828 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 36.8328 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 37.0828 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 37.3328 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 37.5695 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 37.8177 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 38.0694 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 38.3180 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 38.5817 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 38.8270 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 39.0770 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 39.3270 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 39.5770 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 39.8270 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 40.0770 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 40.3270 774.65 779.00 0.00 0.00 6.73 6.73 Page 92 of 180 1D Nodes - Volume 20 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 West Basin 40.5770 774.65 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 40.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 41.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 41.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 41.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 41.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 42.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 42.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 42.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 42.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 43.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 43.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 43.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 43.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 44.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 44.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 44.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 44.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 45.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 45.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 45.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 45.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 46.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 46.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 46.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 46.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 47.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 47.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 47.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 47.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 48.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 48.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 48.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 48.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 49.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 49.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 49.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 49.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 50.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 50.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 50.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 50.8270 774.64 779.00 0.00 0.00 6.73 6.73 Page 93 of 180 1D Nodes - Volume 21 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\2/16/2021 16:36 Sim Node Name Relative Time [hrs]Stage [ft]Warning Stage [ft]Stored Volume (Geometry Based) [ac_ft]Stored Volume (Flow Based) [ac_ft]Total Inflow Volume [ac_ft]Total Outflow Volume [ac_ft] DEV100 West Basin 51.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 51.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 51.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 51.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 52.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 52.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 52.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 52.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 53.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 53.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 53.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 53.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 54.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 54.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 54.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 54.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 55.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 55.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 55.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 55.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 56.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 56.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 56.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 56.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 57.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 57.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 57.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 57.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 58.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 58.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 58.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 58.8270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 59.0770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 59.3270 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 59.5770 774.64 779.00 0.00 0.00 6.73 6.73 DEV100 West Basin 59.8270 774.64 779.00 0.00 0.00 6.73 6.73 Page 94 of 180 Carmel Clay Schools – Carmel High School Hartman Field Improvements May 12, 2021 TLF, Inc. Project No. 2020-340 Appendix E Proposed Water Quality Calculations Page 95 of 180 Description:Carmel - Hartman FieldReviewing Entity:Job #:Date:05/12/20CNwq=PARAMETERSP =1 (in.)Pervious Area4.96Impervious Area3.54Area8.50I = 42% (%)Rv = 0.42482353Qa=0.42 (in.)CALCULATED CNwqCNwq =921000[10+5P+10Qa-10(Qa2+1.25Qa(P))1/2]PROPOSED STORMWATER SYSTEM WATER QUALITY CURVE NUMBERJob InformationCity of Carmel2020-340Page 96 of 180 1 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 13:19 Background Image: BMP Simple Basin: BMP Basin Scenario:Icpr3 Node:BMP Hydrograph Method:NRCS Unit Hydrograph Infiltration Method:Curve Number Time of Concentration:7.7000 min Max Allowable Q:9999999.00 cfs Time Shift:0.0000 hr Unit Hydrograph:UH484 Peaking Factor:484.0 Page 97 of 180 2 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 13:19 Area:8.5000 ac Curve Number:92.0 % Impervious:0.00 % DCIA:0.00 % Direct:0.00 Rainfall Name:Scsii-24 Comment: Node: BMP Scenario:Icpr3 Type:Time/Stage Base Flow:0.00 cfs Initial Stage:100.00 ft Warning Stage:101.00 ft Boundary Stage: Year Month Day Hour Stage [ft] 0 0 0 0.0000 100.00 0 0 0 99999.0000 100.00 Comment: Simulation: WQV 1in-24hr Scenario:Icpr3 Run Date/Time:6/29/2021 1:12:32 PM Program Version:ICPR4 4.07.06 General Run Mode:Normal Year Month Day Hour [hr] Start Time:0 0 0 0.0000 End Time:0 0 0 60.0000 Hydrology [sec]Surface Hydraulics [sec] Min Calculation Time:60.0000 0.1000 Max Calculation Time:60.0000 Output Time Increments Hydrology Year Month Day Hour [hr]Time Increment [min] Page 98 of 180 3 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 13:19 Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 Surface Hydraulics Year Month Day Hour [hr]Time Increment [min] 0 0 0 0.0000 15.0000 Restart File Save Restart:False Resources & Lookup Tables Resources Lookup Tables Rainfall Folder:Icpr3 Boundary Stage Set: Extern Hydrograph Set: Unit Hydrograph Folder: Icpr3 Curve Number Set: Green-Ampt Set: Vertical Layers Set: Impervious Set: Tolerances & Options Time Marching:SAOR IA Recovery Time:24.0000 hr Max Iterations:6 Over-Relax Weight Fact: 0.5 dec dZ Tolerance:0.0010 ft Smp/Man Basin Rain Opt: Global Max dZ:1.0000 ft Link Optimizer Tol:0.0001 ft Rainfall Name:~SCSII-24 Rainfall Amount:1.00 in Edge Length Option:Automatic Storm Duration:24.0000 hr Dflt Damping (1D):0.0050 ft Min Node Srf Area (1D): 100 ft2 Energy Switch (1D):Energy Comment: Page 99 of 180 1D Nodes - Max 1 P:\2020\300\340\Engr\Calcs\_Civil\Drainage\ICPR Models\ICPR Proposed Conditions\2021-02-15\5/12/2021 13:26 Sim Node Name Warning Stage [ft]Maximum Stage [ft]Time to Maximum Stage [hrs]Maximum Total Inflow Rate [cfs]Time to Maximum Total Inflow Rate [hrs]Maximum Total Outflow Rate [cfs]Time to Maximum Total Outflow Rate [hrs] WQV 1in-24hr BMP 101.00 100.00 0.0000 5.01 12.0165 0.00 0.0000 Page 100 of 180 City of Indianapolis Stormwater Quality Unit (SQU) Selection Guide Pg. 1 02/11/2020 Version 17.0 (Check http://www.indy.gov/eGov/City/DPW/Business/Specs/Pages/UpdatedStormWaterManual.aspx for current Selection Guide) Performance Matrix for Manufactured SQUs that are approved for use as post-construction water quality units in the City of Indianapolis and in compliance with the Stormwater Design and Construction Specifications Manual PLEASE NOTE: All SQUs shall be configured as off-line units unless approved for on-line use. On-line units must document the peak 10-year flow (per the Stormwater Design and Construction Specification Manual) is less than the approved maximum10-yr flow rate. Rate Based SQUs - Table 1 Manufactured SQU SQU System Model Max Treatment Flow (cfs) Max 10-yr On-Line Flow Rate (cfs) Cleanout Depth (Inches) SC-3 0.39 N/A 9 SC-4 0.70 N/A 9 SC-5 1.09 N/A 9 SC-6 1.57 N/A 9 SC-7 2.14 N/A 9 SC-8 2.80 N/A 9 SC-9 3.54 N/A 9 SC-10 4.37 N/A 9 SC-11 5.29 N/A 9 SciClone1 SC-12 6.30 N/A 9 CDS-3 0.52 1.04 9 CDS-4 0.93 1.86 9 CDS-5 1.5 3.00 9 CDS-6 2.1 4.2 9 CDS-7 2.8 5.60 9 CDS-8 3.7 7.4 9 CDS-10 5.8 11.6 9 CDS Technologies1 CDS-12 8.4 16.8 9 DVS-36C 0.56 1.12 9 DVS-48C 1.00 2.00 9 DVS-60C 1.56 3.12 9 DVS-72C 2.25 4.50 9 DVS-84C 3.06 6.12 9 DVS-96C 4.00 8.00 9 DVS-120C 6.25 12.50 9 DVS1 DVS-144C 9.00 18.00 9 Page 101 of 180 City of Indianapolis Stormwater Quality Unit (SQU) Selection Guide Pg. 2 02/11/2020 Version 17.0 Manufactured SQU SQU System Model Max Treatment Flow (cfs) Max 10-yr On-Line Flow Rate (cfs) Cleanout Depth (Inches) 4-ft 1.12 2.95 9 6-ft 2.52 6.63 12 8-ft 4.49 11.81 15 10-ft 7.00 18.40 18 Hydro International Downstream Defender1 12 ft 10.08 26.51 21 3-ft 0.85 1.84 9 4-ft 1.5 3.24 9 5-ft 2.35 5.08 9 6-ft 3.38 7.30 9 7-ft 4.60 9.94 9 Hydro International First Defense High Capacity1 8-ft 6.00 12.96 9 HS-3 0.50 1.00 6 HS-4 0.88 1.76 6 HS-5 1.37 2.74 6 HS-6 1.98 3.96 6 HS-7 2.69 5.38 6 HS-8 3.52 7.04 6 HS-9 4.45 8.9 6 HS-10 5.49 10.98 6 HS-11 6.65 13.3 6 HydroStorm by Hydroworks, LLC1 HS-12 7.91 15.82 6 XC-2 0.57 1.16 6 XC-3 1.13 2.30 6 XC-4 1.86 3.79 6 XC-5 2.78 5.66 6 XC-6 3.88 7.90 6 XC-7 5.17 10.52 6 XC-8 6.64 13.51 6 XC-9 8.29 16.87 6 XC-10 10.13 20.62 6 XC-11 12.15 24.73 6 XC-12 14.35 29.20 6 AquaShield Aqua-Swirl Xcelerator1 XC-13 15.53 31.60 6 CS-4 1.80 4.03 9 CS-5 2.81 6.29 9 CS-6 4.05 9.07 9 CS-8 7.20 16.1 9 CS-10 11.3 25.3 9 Contech Cascade Separator CS-12 16.2 36.3 9 Page 102 of 180 City of Indianapolis Stormwater Quality Unit (SQU) Selection Guide Pg. 3 02/11/2020 Version 17.0 Manufactured SQU SQU System Model Max Treatment Flow (cfs) Max 10-yr On-Line Flow Rate (cfs) Cleanout Depth (Inches) 2-4 0.62 2.57 6 3-6 1.4 5.80 6 3-8 1.87 7.75 6 4-8 2.49 10.31 6 5-10 3.89 16.11 6 6-12 5.6 23.19 6 6-13.75 6.42 26.59 6 7-14 7.62 31.56 6 7-15 8.17 33.84 6 8-14 8.71 36.08 6 8-16 9.96 41.25 6 9-18 12.6 52.19 6 10-17 13.22 54.76 6 10-20 15.56 64.45 6 12-21 19.6 81.18 6 Oldcastle NSBB-HVT 12-24 22.4 92.78 6 AS-2 0.36 0.73 7 AS-3 0.71 1.44 7 AS-4 1.18 2.39 7 AS-5 1.46 2.96 7 AS-6 2.11 4.28 7 AS-7 2.87 5.82 7 AS-8 3.74 7.59 7 AS-9 4.73 9.59 7 AS-10 5.84 11.84 7 AS-11 7.07 14.34 7 AS-12 8.42 17.08 7 AquaShield Aqua Swirl AS-13 9.87 20.02 7 S3 0.70 1.40 10 S4 1.25 2.50 10 S5 1.95 3.90 10 S6 2.80 5.60 10 S8 5.00 10.00 10 ADS Barracuda S10 7.80 15.60 10 1 Installed in the configuration as reviewed by NJCAT only Page 103 of 180 Plan View SCALE 1:40 Elevation View SCALE 1:40 Projected View SCALE 1:70 2733 Kanasita Drive, Suite 111, Chattanooga, TN 37343 Phone (888) 344-9044 Fax (423) 826-2112 www.aquashieldinc.com Structure #: Drawn By: Scale: Date: OFlores Rvwed Rvw. Date U.S. Patent No. 6524473 and other Patent Pending Aqua-Swirl XCelerator Aqua-Swirl Stormwater Treatment System Standard Detail As Shown 7/22/2020 el. Varies Inlet/Outlet Invert el. Varies el. Varies Grade (Rim) el. Varies XC-7 CCW STD XC-7 STD Aqua-Swirl Polymer Coated Steel (PCS) Stormwater Treatment System 12 in [305 mm] Manhole Frame & Cover Detail For Non-Traffic Areas Only NTS 48 in [1219 mm] Min. Gravel Backfill Concrete Wrap Compressible Expansion Joint Material to a minimum 1/2-inch [13 mm] thickness around top of riser to allow transfer of inadvertent loading from manhole cover to concrete slab. Riser Soil Cover Frame 1/2 in [13 mm] 1/2 in [13 mm] Place small amount of concrete [3,000 psi [20 MPa] (min)] to support and level manhole frame. DO NOT allow manhole frame to rest upon riser. Backfill (90% Proctor Density) 8 in [203 mm] 4 1/2 in [114 mm] Unless other traffic barriers are present, bollards shall be placed around access riser(s) in non-traffic areas to prevent inadvertent loading by maintenance vehicles. Manhole Frame & Cover Detail For Traffic Loading Areas NTS Cover Frame 48 in [1219 mm] Min. Backfill (90% Proctor Density) 3,000 psi [20 MPa] (min) Concrete #4 [13 mm] Rebar @ 6 in [152 mm] Each Way 30 in [762 mm] Riser 1/2 in [13 mm] 4 1/2 in [114 mm] 14 in [356 mm] 1/2 in [13 mm] Thick Expansion Joint Material If traffic loading (HS-25) is required or anticipated, a 4-foot [1.22 m] diameter, 14-inch [356 mm] thick reinforced concrete pad must be placed over the Stormwater Treatment System Riser to support and level the manhole frame, as shown. The top of riser pipe must be wrapped with compressible expansion joint material to a minimum 1/2-inch [13 mm] thickness to allow transfer of wheel loads from manhole cover to concrete slab. Manhole cover shall bear on concrete slab and not on riser pipe. The concrete slab shall have a minimum strength of 3,000 psi [20 MPa] and be reinforced with #4 [13 mm] reinforcing steel as shown. Minimum cover over reinforcing steel shall be 1-inch [25 mm]. Top of manhole cover and concrete slab shall be level with finish grade. Please see accompanied Aqua-Swirl specification notes. See Site Plan for actual System orientation. Approximate dry (pick) weight: 3800 lbs [1700 kg]. Backfill shall extend at least 18 inches [457 mm] outward from Swirl Concentrator and for the full height of the Swirl Concentrator (including riser) extending laterally to undisturbed soils. (See MH Detail Below) Backfill Bedding Undisturbed soil 18 in [457 mm] 6 in [152 mm] 1 1 As an alternative, 42 in [1067 mm] diameter, HS-20/25 rated precast concrete rings may be substituted. 14 in [356 mm] thickness must be maintained. XC-7 inlet/outlet pipe size ranges up to 42 in [1067 mm]. XC-7 chamber height may vary up to 156 in [3962 mm], depending on inlet/outlet pipe size. Orientation may vary from a minimum of 90 to a maximum of 180. Clockwise or counterclockwise orientation as needed. 2 3 3 2 102 in [2591 mm] 102 in [2591 mm] P42 in [P1067 mm] 2 Octagonal Base Plate P90 in [P2290 mm] 156 in [3962 mm] Varies Varies 5 [127 mm] MH Frame P30 in [P762 mm] Band Coupler by Manufacturer. (as needed)Riser Manhole Frame and Cover by Manufacturer. (See Details) Rim elevations to match finish grade. 90 in [2286 mm] Pipe coupling by Contractor. 12 in [305 mm] long Stub-out by Manufacturer. Pipe coupling by Contractor. 12 in [305 mm] long Stub-out by Manufacturer. 4 4 P90 in [P2286 mm] Optional inlet orientations available (See note 4) P42 in [P1067 mm] 180 Page 104 of 180 Description:Carmel - Hartman FieldReviewing Entity:Job Number:Date:05/12/21Isolator RowA Flow Rate from HydroCAD 1.74 cfs(1 in - 24 hr)From StormTech Chart in letter dated 02/27/2012StormTech SC-740 ChamberB Specific Flow Rate: 2.50 gpm/sfC Bottom of Chamber Area: 27.80 sfD Flow per Model0.15 cfsE=A/D # of chambers required inIsolator Row to meet 80%TSS removal12# of chambers provided:27PROPOSED STORMWATER SYSTEM WATER QUALITY VOLUME CALCULATIONSJob InformationCity of Carmel2020-340Page 105 of 180 www.stormtech.com│70 Inwood Road│Suite 3│Rocky Hill│Connecticut│06067│888.892.2694│fax 866.328.8401 Name Title Office February 27, 2012 Address Subject: BMP Application StormTech Isolator Row Dear Sir/Madam, StormTech requests the District’s approval for “general use level” of the Isolator™ Row, which is a patented filtration type BMP manufactured by StormTech, LLC. The Isolator Row is covered under US Patent No.: US 6,991,734 B1. 1.a. Description: The Isolator Row is a row or rows of StormTech thermoplastic chambers that are wrapped in filter fabric and installed below grade. Stormwater enters the chambers and must pass through the filter fabric media where sediments and other contaminants are filtered out as stormwater exits the Isolator Row through the fabric. Some of the unique features of the Isolator Row that contribute to its effectiveness and practicality include: Vast filtration area – each MC-3500 chamber has 43.2 square feet of filtration area through the bottom filter fabric Large sediment storage volume Entire bottom area accessible for cleaning without obstructions within the row A state-of-the-art structural design that meets AASHTO safety factors for both live loads and permanent dead loads 1.b. Applicable Sites: The Isolator Row can be effectively used for essentially all developed sites. The most common applications are highly impervious sites such as paved parking areas, roads as well as developed sites that include grassy or other landscaped areas. It is not intended to be used for construction sediments. 1.c Isolator Row Approvals: The Isolator Row has been approved on a project by project basis for thousands of projects around the United States. Following are some examples: In Massachusetts, approvals for the State DEP requirement of 80% TSS removal on an annual load basis are issued at the Conservation Commission level, and the Isolator Row is commonly used to meet this criteria. In 2004 the Maine DEP approved the Isolator Row based on laboratory testing of 110 micron (US Silica OK-110) particle size Under the New Environmental Technology Evaluation program, the Ontario (Canada) Ministry of the Environment has evaluated the Isolator row and issued a Certificate of Technology Assessment Page 106 of 180 www.stormtech.com│70 Inwood Road│Suite 3│Rocky Hill│Connecticut│06067│888.892.2694│fax 866.328.8401 1.d. Manufacturer History: After many years developing and providing chamber systems for both septic and stormwater applications, StormTech owners formed StormTech, LLC in 2003 as a joint venture Company to focus exclusively on stormwater. All StormTech chambers are produced in the United States. As of this date, StormTech has millions of chambers installed, primarily for commercial applications within the United States, but installation locations also include Canada, Europe, Australia and the Middle East. The Isolator Row was developed in 2003 initially as a maintenance feature, essentially to capture sediments that could otherwise accumulate in the open graded stone that surrounds the chambers. This open graded stone serves two roles; 1) to provide the important structural soil support of the soil–structure interaction system and 2) to provide open porosity to store stormwater. The Isolator Row was found to be so effective at capturing sediments that many regulators began allowing the Isolator Row as a sediment removal BMP for water quality. StormTech engineering personnel include decades of experience in water quality. Our collective in- house engineering experience includes years with manufacturers of hydrodynamic separators, filter systems, consulting engineering and regulators. For performance evaluations relative to water quality, StormTech has gone to qualified outside researchers such as Vincent Neary, PhD, PE from Tennessee Tech University and Robert Roseen, PhD from the University of New Hampshire. History of Isolator Row Testing: February 23, 2005 - Tennessee Tech University summarized laboratory testing on the Isolator Row in accordance with Maine DEP testing protocol. Tests demonstrated the following: o 95% TSS overall removal at 8.1 gpm/sqft for US Silica OK-110 (110 micron). o 80% captured on fabric, 15% captured in stone October 20, 2006 - Tennessee Tech University summarized laboratory testing on the Isolator Row in accordance with New Jersey Center for Advanced Technologies (NJCAT) testing protocol. Tests demonstrated the following: o 60% TSS Removal at 3.2 gpm/sqft for Sil-Co-Sil 106 with accumulated fines (D50 = 10 microns) o 66% TSS Removal at 3.2 gpm/sqft for Sil-Co-Sil 106 (D50 = 22 microns) o 71% TSS Removal at 3.2 gpm/sqft for Sil-Co-Sil 250 (D50 = 45 microns) o 88% TSS Removal at 1.7 gpm/sqft for Sil-Co-Sil 250 (D50 = 45 microns) August, 2007 – NJCAT summarized its third party evaluation of the Tennessee Tech test results and produced the “NJCAT Technology Verification Report StormTech Isolator Row”. Their verification is summarized as follows: o Claim 1: A StormTech® SC-740 Isolator™ Row, sized at a treatment rate of no more than 2.5 gpm/ft2 of bottom area, using two layers of woven geotextile fabric under the base of the system and one layer of non-woven fabric wrapped over the top of the system and a mean event influent concentration of 270 mg/L (range of 139 – 361 mg/L) has been shown to have a TSS removal efficiency (measured as SSC) of at least 60% for SIL-CO-SIL 106, a manufactured silica product with an average particle size of 22 microns, in laboratory studies using simulated stormwater. o Claim 2: A StormTech® SC-740 Isolator™ Row, sized at a treatment rate of no more than 2.5 gpm/ft2 of bottom area, using two layers of woven geotextile fabric Page 3 Page 107 of 180 www.stormtech.com│70 Inwood Road│Suite 3│Rocky Hill│Connecticut│06067│888.892.2694│fax 866.328.8401 under the base of the system and one layer of non-woven fabric wrapped over the top of the system and a mean event influent concentration of 318 mg/L (range of 129 – 441 mg/L) has been shown to have a TSS removal efficiency (measured as SSC) of 84% for SIL-CO-SIL 250, a manufactured silica product with an average particle size of 45 microns, in laboratory studies using simulated stormwater. o Claim 3: A StormTech® SC-740 Isolator™ Row, sized at a treatment rate of no more than 6.5 gpm/ft2 of bottom area, using a single layer of woven geotextile fabric under the base of the system and one layer of non-woven fabric wrapped over the top of the system and a mean event influent concentration of 371 mg/L (range of 116 – 614 mg/L) has been shown to have a TSS removal efficiency (measured as SSC) of greater than 95% for OK-110, a manufactured silica product with an average particle size of 110 microns, in laboratory studies using simulated stormwater. September 2010 – The University of New Hampshire Stormwater Center released the Final Report on Field Verification Testing of the StormTech Isolator Row Treatment Unit. Testing consisted of determining the water quality performance for multiple stormwater pollutants in accordance with TARP Tier II protocol. Data was recorded for 23 storm events. o TSS median removal efficiency – 83% o Petroleum Hydrocarbons median removal efficiency – 91% o Zinc median removal efficiency – 57% o Phosphorus median removal efficiency – 33% 1.e. Requested Use Level Designation Approval: StormTech requests approval at the __________. In support of this request, StormTech is providing test results from both laboratory and field studies by others that demonstrate that the “performance requirement” is met. Product Performance Claim and Certification 80% TSS removal is achieved by sizing Isolator Rows to treat the water quality flow rate at a specific flow rate not to exceed 2.5 gpm/sqft of bottom area using two layers of Propex 315 ST, Mirafi 600X or approved equal woven geotextile. Model Specific Flow Rate Bottom Area Flow Per Model StormTech SC-310 2.5 gpm/sf 17.7 sf 0.10 cfs StormTech SC-740 2.5 gpm/sf 27.8 sf 0.15 cfs StormTech DC-780 2.5 gpm/sf 27.8 sf 0.15 cfs StormTech RC-310 2.5 gpm/sf 17.7 sf 0.10 cfs StormTech RC-750 2.5 gpm/sf 27.8 sf 0.15 cfs StormTech MC-3500 2.5 gpm/sf 43.2 sf 0.24 cfs StormTech MC-4500 2.5 gpm/sf 30.1 sf 0.17 cfs We therefore respectfully request that _______ evaluate the Isolator Row based on ______ performance requirements. I trust this provides sufficient information on the StormTech Isolator Row to enable your evaluation. However, should you have any questions or require additional information. Please do not hesitate to contact me or Ed Pisowicz directly. Page 108 of 180 www.stormtech.com│70 Inwood Road│Suite 3│Rocky Hill│Connecticut│06067│888.892.2694│fax 866.328.8401 Sincerely, (signature) (signature) Kenneth M. Sanok, PE Ed Pisowicz Senior Engineer Engineered Product Manager Advanced Drainage Systems Advanced Drainage Systems Phone: (860) 861-2151 Phone: (404) 433-7452 e-mail: ksanok@stormTech.com e-mail: episowicz@stormtech.com Page 109 of 180 Carmel Clay Schools – Carmel High School Hartman Field Improvements May 12, 2021 TLF, Inc. Project No. 2020-340 Appendix F Previous Project Information Page 110 of 180 Page 111 of 180 Page 112 of 180 Page 113 of 180 Page 114 of 180 Page 115 of 180 Page 116 of 180 Page 117 of 180 Page 118 of 180 Page 119 of 180 Page 120 of 180 Page 121 of 180 Page 122 of 180 Page 123 of 180 Page 124 of 180 Page 125 of 180 Page 126 of 180 Page 127 of 180 Page 128 of 180 Page 129 of 180 Page 130 of 180 Page 131 of 180 Page 132 of 180 Page 133 of 180 Page 134 of 180 Page 135 of 180 Page 136 of 180 Page 137 of 180 Page 138 of 180 Page 139 of 180 Page 140 of 180 Page 141 of 180 Page 142 of 180 Page 143 of 180 Page 144 of 180 Page 145 of 180 Page 146 of 180 Page 147 of 180 Page 148 of 180 Page 149 of 180 Page 150 of 180 Page 151 of 180 Page 152 of 180 Page 153 of 180 Page 154 of 180 Page 155 of 180 Page 156 of 180 Page 157 of 180 Page 158 of 180 Page 159 of 180 Page 160 of 180 Page 161 of 180 Page 162 of 180 Page 163 of 180 Page 164 of 180 Carmel Clay Schools – Carmel High School Hartman Field Improvements May 12, 2021 TLF, Inc. Project No. 2020-340 Appendix G General Project Information Page 165 of 180 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBR WVD ADDL INSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $ $ $PROPERTY DAMAGE BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOSAUTOS ONLY NON-OWNED SCHEDULEDOWNED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED? (Mandatory in NH) DESCRIPTION OF OPERATIONS below If yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT EROTH-STATUTEPER LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB $EACH OCCURRENCE $AGGREGATE $ OCCUR CLAIMS-MADE DED RETENTION $ $PRODUCTS - COMP/OP AGG $GENERAL AGGREGATE $PERSONAL & ADV INJURY $MED EXP (Any one person) $EACH OCCURRENCE DAMAGE TO RENTED $PREMISES (Ea occurrence) COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO-JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIRED AUTOS ONLY 3/16/2021 SterlingRisk 135 Crossways Park Drive P.O.Box 9017 Woodbury NY 11797 800-767-7837 516-487-0372 request@sterlingrisk.com Arch Insurance Company 11150 TLFINC0-01 TLF,Inc. 3901 W.86th St.,Suite 200 Indianapolis IN 46268 1749904993 A Professional Liability PAAEP0004305 6/29/2020 6/29/2021 $1,000,000 $1,000,000 Limit each claim Aggregate City of Carmel 1 Civic Square Carmel,IN 46032 Page 166 of 180 Waiver Requests This project is requesting three waivers from the Carmel Storm Water Ordinance. Waiver #1 104.01.1 – All swales shall be installed with a subsurface drain. We respectfully request a waiver from this technical standard as this existing site elevations do not permit inlets to be installed at the low points in the existing and proposed swales. A literal enforcement of the provisions of this section of the ordinance will result in unnecessary hardship to this development. All swales drain to end sections or directly into the existing dry detention areas due to limited cover. To meet the requirements of this section of the ordinance to the greatest extent possible for this site, all proposed and existing swales have been graded to have a minimum slope of 1% as noted on both the Grading Plans and the typical swale cross section added to SU3.03. Waiver #2 104.02 – Minimum Flood Protection Grade of all structures fronting a pond or open ditch shall be no less than 2 feet above any adjacent 100-year local or regional flood elevations, whichever is greater, for all windows, doors, pipe entrances, window wells, and any other structure member where floodwaters can enter a building. The proposed 100-yr elevation of the east basin is 776.52. The minimum flood protection grade is 2 feet above the local 100-yr elevation at 778.52. The adjacent overtopping flood elevation is 778.50, which means the minimum flood protection grade is not the minimum of 1’ above the overtopping elevation and is only 0.02’. A literal enforcement of the provisions of this section of the ordinance will result in unnecessary hardship to this development as the existing finish floor of the building cannot be revised. To meet the requirements of this section of the ordinance to the greatest extent possible for this site, an additional 1.6 ac-ft of storage has been added to the east basin. Waiver #3 303.07 – The Lowest Adjacent Grade for all residential, commercial, or industrial buildings shall be set a minimum of 2 feet above the highest noted overflow path/ponding elevation across the property frontage. The finish floor elevation of the ESC building is 779.75. The overflow elevation along the frontage to the north (Main Street) is 781.10. The overtopping flood elevation to the south is 780.50 and the overtopping flood elevation to the northeast is 778.50. Due to existing elevations of the athletic fields, Main Street, adjacent properties, and the existing building, a waiver is requested from this technical standard. A literal enforcement of the provisions of this section of the ordinance would result in unnecessary hardship to this development as the existing finish floor of the building cannot be revised. Page 167 of 180 To meet the requirements of this section of the ordinance to the greatest extent possible for this site, an additional 1.6 ac-ft of storage has been added to the east basin. Waiver #4 501.01 – There should be no less than 2.5 feet of cover along any part of the pipe from final pavement elevation or final ground surface elevation to the top of the pipe. Due to existing elevations, we are unable to meet this requirement in all locations. A literal enforcement of the provisions of this section of the ordinance will result in unnecessary hardship to this development. To meet the requirements of this section of the ordinance to the greatest extent possible for this site, there is only one section of pipe that is under vehicular pavement that has less than 2.5' of cover. The cover is nearly 2' at the shallowest location near ST-111. All other locations where the 2.5' of cover cannot be met are in grass or sidewalk locations. A waiver from this technical standard is requested due to existing conditions. Page 168 of 180 Figure 1: Existing East Basin looking southFigure 2: Existing East Basin looking south showing concrete flowlinesPage 169 of 180 Figure 3: Existing East Basin looking eastFigure 4: Existing East Basin looking north at pipe outlet into legal drainPage 170 of 180 Figure 5: Existing East Basin looking northwest at building pipe and headwallFigure 6: Existing East Basin looking westPage 171 of 180 Figure 7: Existing East Basin looking southFigure 8: Existing East Basin looking northPage 172 of 180 Figure 9: Existing East Basin looking northeastFigure 10: Offsite storm sewer inlet at Badger Field with inlet protectionPage 173 of 180 Figure 11: Adjacent Badger Field looking northFigure 12: 12" CMP end section at Badger Field property line, east of East BasinPage 174 of 180 Figure 13: 12" CMP end section at Badger Field property line, east of East BasinFigure 14: Looking south at Badger FieldhousePage 175 of 180 Figure 15: Looking south at Badger FieldhouseFigure 16: Looking northwest at Existing East BasinPage 176 of 180 Figure 17: Looking north at Carmel School Arm of Mitchner DrainFigure 18: Looking south at Carmel School Arm of Mitchner DrainPage 177 of 180 Figure 19: Looking east at Carmel School Arm of Mitchner DrainFigure 20: Looking south at Carmel School Arm of Mitchner DrainPage 178 of 180 Figure 21: Looking east at Carmel School Arm of Mitchner DrainFigure 22: Looking west at Carmel School Arm of Mitchner DrainPage 179 of 180 Figure 23: Looking south at Carmel School Arm of Mitchner DrainFigure 24: Looking at terminus of Carmel School Arm of Mitchner Drain atMitchner Drain - 36" rcp and concrete headwallPage 180 of 180