Loading...
HomeMy WebLinkAboutCC-06-19-00-01 Hazel Dell PaymtResolution No. CC-06-19-00-01 A RESOLUTION OF THE COMMON COUNCIL OF THE CITY OF CARMEL, INDIANA APPROVING PAYMENT OF CONSTRUCTION COSTS FOR HAZEL DELL BOND PROJECT WHEREAS, pursuant to Article III, Section 3.01 (b) of the Trust Indenture by and among the City of Carmel Redevelopment Authority and Fifth Third Bank of Central Indiana, dated as of August 1, 1997, approval by the Common Council is required prior to payments from the Construction Fund therein described upon presentation of architect' s or engineer' s certificates of work completed and materials furnished; WHEREAS, American Consulting Engineers, Inc., has presented such certificates regarding the Construction Project Invoices attached hereto as Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Carmel, Indiana, that the Construction Project Invoices attached hereto as Exhibit A are hereby approved for payment t~om the Construction Fund described in the above- referenced Trust Indenture. PASSED by the Common Council of the Cit of Carmel, Indiana this of CJltlX_(, ,2000, byavoteof 7/ayesand 19 nays. day ATTEST :, i n . ordra , C, r - re r ~~ f Carmel, Indiana the of · 2000. Diana L. Cordray, IL~er ~nard, Mayo//'~r ATTEST: Diana L. Cordray, l~reasurer CITY OF CARMEL REDEVELOPMENT AUTHORITY CONSTRUCTION FUND PAYMENT REQUISITION TO: Fifth Third Bank of Central Indiana, as Trustee 251 North Illinois Street Suite 1000 Indianapolis, Indiana 46204 Attn: Corporate Trust Department Date: June 6, 2000 Trust Indenture between City of Carreel Redevelopment Authority and Fifth Third Bank of Central Indiana, as Trustee, dated as of August 1, 1997 (the "Trust Indenture") AFFIDAVIT STATE OF INDIANA ) ) COUNTY OF HAMILTON ) SS: The undersigned, having been duly sworn upon her oath, certifies that: She has been designated by the Carmel Redevelopment Authority as an individual authorized to execute and present affidavits on the Authority' s behalf relating to payments from the Construction Fund for items that are not subject to certification by the architect or engineer, in accordance with Article IV, Section 3.01(b) of said Trust Indenture. The amounts set forth in Exhibit A hereto are requested to be paid to the respective Payees identified therein for the services or assets described, from the Construction Account of the Construction Fund created by Section 3.01 of the Trust Indenture. Copies of the statements of the respective Payees or other supporting documentation are also attached hereto. The obligations set forth in Exhibit A have been prope~y incurred, are proper charges against the Construction Account, and have not been the basis of any previous withdrawals from the Construction Account. CITY OF CARMEL REDEVELOPMENT AUTHORITY City Engineer, City of Carmel, Indiana STATE OF INDIANA COUNTY OF HAMILTON SS: Before me, the undersigned, a Notary Public in and for said County and State, personally appeared__Kate Weese , City Engineer for the City of Carmel, Indiana, who having been duly sworn upon her oath acknowledged the execution of the foregoing Affidavit for and on behalf of said Authority. Witness my hand and Notarial Seal this 7~ day of June, 2000 My Commission Expires: , Notary Public residing in Cl[,.a,~~ county, Indiana EXHIBIT A PAYMENT REQUISITION NO. 106 PAYEE AMOUNT DUE CHARACTER OF EXPENDITURE Trotter Construction Co. 5851 E. 34th St. Indianapolis, 1N 46218 $67,584.17 Construction Services rendered in connection with Pennsylvania St. 06~6~0 CONSTRUCTION PROJECTINVOICE COMPANY NAME: Trotter Construction, Inc. AND ADDRESS 5851 E. 34® Street Indianapolis, IN 46218 TELEPHONE NO.: (317) 543-0053 FAX NO.: PROJECT NAME: PROJECT NO.: INVOICE NO.: (317) 543-3115 Pennsylvania Street Improvements 97~04 07 DATE: May 31, 2000 Construction pay items as per Progress Pay Estimate No. 07 as shown on the attached invoice for work completed between the dates of Apdl 22, 2000 and May 31, 2000. TOTAL PAY THIS ESTIMATE: MINUS 10% RETAINAGE: TOTAL NOW DUE: (-) $75,093.53 $7,509.36 $67,584.17 Submitted by CrossRoad Engineers, PC Project Repre:~ned name Date Project Representative - printe~name CITY OF CARMEL 1 of 4 PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT PROGRESS PAY ESTIMATE NO. 07 For work done during the period of: April 22, 2000 through May 31, 2000 item Description Quantity this Total Quantity Unit No. Estimate to Date Pdce Total Pay Total Pay this Estimate to Date 1 CLEARING RIGHT OF WAY LS 0.70 LS $68,796.59 $48,157.61 2 CONCRETECURB, REMOVE 320.00 LFT 2197.50 LFT $2.55 $816.00 $5,603.63 3 CATCH BASIN, REMOVE EA 2.00 EA $60.00 $120.00 4 SURFACE MILLING. BITUMINOUS SY SY $6.65 5 PIPE, REMOVE 247.00 LI: 468.00 LF $11.60 $2,865.20 $5,428.80 6 EXCAVATION, COMMON 213.81 CY 621.04 CY $8.60 $1,838.77 $5,340.94 7 BORROW 2970.00 CY 2970.00 CY $13.18 $39,144.60 $39,144.60 8 EXCAVATION, COMMON FOR DITCH GRADIN 1.00 LS 1.00 LS $16,126.96 $16,126.96 $16,126.96 9 TEMP. EROSION & SEDIMENT CONTROL, PE!: LF 5860.00 LF $1.70 $9,962.G0 10 TEMP. EROSION & SEDIMENT CONTROL, CUI EA 1.00 EA $66.00 $66.00 11 TEMP. EROSION &SEDIMENT CONTROL, DR~ EA EA $66.00 12 TEMP. EROSION & SEDIMENT CONTROL, CUI EA 13.00 EA $37.83 $491.79 13 B BORROW FOR STRUCTURE BACKFILL CY 6696.10 CY $14.75 $98,767.48 14 COMPACTED AGG FOR SHOULDER, O, SIZE TN TN $20.53 15 COMPACTED AGGREGATE FOR APPR., O, SI; TN TN $23.47 16 COMPACTED AGGREGATE FOR DRIVES, O, .c TN TN $32.31 17 HMA BASE, 25.0 mm MAINELINE, D TN TN $25.20 18 HMA BASE, 25.0 mm MAINELINE, C TN TN $31.52 19 HMA BASE, 25.0 mm MAINELINE TN TN $26.43 20 HMA INTERMEDIATE, 19.0 mm MAINELINE TN TN $29.13 21 HMA SURFACE, 9.5 mm MV, MAINELINE TN TN $32.72 22 BITUMINOUS MA~'ERIAL FOR TACT COAT SY SY $0.14 23 CURB RAMP, CONCRETE SY SY $31.46 24 SIDEWALK, CONCRETE SY SY $24.22 25 SIDEWALK, BtTUMINOUS TN TN $37.99 26 CURB, CONCRETE LF LF $10.68 27 CURB AND GUTTER, COMBINED LF LF $9.92 28 CENTER CURB, CONCRETE, MODIFIED SY SY $73.76 29 BITUMINOUS MIXTURE FOR APPROACHES, L TN TN $74.45 30 GEOTEXTILES SY SY $3.96 31 RIPRAP, REVETMENT 18 IN. TN TN $21.67 32 MOBILIZATION &DEMOBILIZATION FOR SEE[ EA EA $660.00 33 MULCHED SEEDING, R SY SY $0.44 34 SODDING SY SY $2.59 35 TREES, REPLANT EA 12.00 EA $150.00 $1,800.00 36 SANITARY SEWER SERVICE ADJUSTMENT LF 76.00 LF $39.91 $3,033.16 37 PIPE, RCP, 12 IN. LF 1719.50 LF $24.43 $42,007.39 38 PIPE, RCP, 15 IN. LF 359.00 LF $25.64 $9,204.76 39 PIPE, RCP, 18 IN. LF 155.00 LF $28.11 $4,357.05 40 PtPE, RCP, 21 IN. LF 559.00 LF $38.04 $21,264.36 41 PIPE, RCP, 24 IN. LF 1239.50 LF $45.08 $55,876.66 C:~:affne~pENNSyLV~pENNdoc~peyeslimate.wb3 CITY OF CARMEL 2of4 PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT PROGRESS PAY ESTIMATE NO. 07 For work done during the period of: April 22, 2000 through 42 PIPE, RCP, 27 IN. LF 933.50 LF $53.14 43 PIPE, RCP, 30 IN. LF 677.00 LF $54.02 44 PIPE, RCP, 33 IN. LF 1114.00 LF $61.11 45 PIPE, RCP, 42 IN. LF 28.00 LF $96.36 46 PIPE, RCP, 54 IN. LF 34.50 LF $98.86 47 PIPE, GROUP K, 6 IN. LF 395.00 LF $3.28 48 PiPE END SECTION, METAL, 12 IN. EA EA $154.86 49 PiPE END SECTION, METAL, 21 IN. EA EA $236.42 50 PiPE END SECTION, METAL, 33 IN. EA EA $378.47 51 RPE END SECTION, METAL, 53 IN. EA EA $1,744.02 52 PIPE, PVC, 6 IN., SCHEDULE 40 LF LF $10.40 53 PIPE END SECTION REINSTALL EA EA $75.61 54 AGGREGATE FOR UNDERDRAINS, 8 CY 30.40 CY $23.10 55 GEOTEXTILES FOR UNDERDRAIN SY 159.91 SY $1.10 56 RING AND COVER, 4 EA EA $335.00 57 INLET, E7 EA 1.00 EA $793.88 56 PIPE, PLUG EXISTING EA EA $72.25 59 PiPE HOLE IN EXISTING STRUCTURE, PLUG EA EA $145.52 60 CASTING, ADJUST TO GRADE EA EA $235.00 61 iNLET, H5 EA 1.00 EA $1,422.72 62 MANHOLE, K5 EA 1.00 EA $2,973.40 63 SANITARY MANHOLE, C4 EA EA $1,986.52 64 MANHOLE, L4 EA 3.00 EA $5,264.01 65 MANHOLE, L15 EA EA $5,285.80 66 MANHOLE, J15 EA 24.00 EA $2,655.73 67 INLET, B15 EA 23.00 EA $1,477.88 68 INLET, C15 EA 12.00 EA $1,477.88 69 MANHOLE, J4 EA 2.00 EA $1,372.03 70 CONSTRUCTION DRUM, LEAVE IN PLACE EA EA $65.75 71 BARRICADE, IlIA EA EA $212.10 72 ROAD CLOSURE SIGN ASSEMBLY EA EA $477.23 73 DETOUR CLOSURE SiGN ASSEMBLY EA EA $37.12 74 CONSTRUCTION SIGN, A EA 14.00 EA $132.56 75 SIGN, SHEET, ENCAPSULATED LENS WITH LI SFT SFT $24.85 76 SIGN POST, A LF LF $6,62 77 LINE, THERMOPLASTIC, BROKEN WHITE, 4" LF LF $0.26 78 LINE, THERMOPLASTIC, SOLID WHITE, 4" LF LF $0.26 79 TRANSVERSE MARKINGS, THERMO. CROSS~ LF LF $1.41 80 LINE, THERMOPLASTIC, BROKEN YELLOW, 4 LF LF $0.27 81 LINE, THERMOPLASTIC, SOLID YELLOW, 4" LF LF $0.25 82 TRANSVERSE MARKINGS, THERMO. STOP LI LF LF $2.85 83 PVMT. MESSAGE MRKNGS, THERMO., LANE EA EA $60.62 ' 84 PVMT. MESSAGE MRKNGS, THERMO., WORE EA EA $87.57 85 SNOWPLOWABLE RAISED PAVEMENT MARK EA EA $28.72 86 LINE, THERMOPLASTIC, DOTTED, WHITE, 4", LF LF $0.62 May 31, 2000 $49,606, 19 $36,571.54 $68,076.54 $2,698,08 $3,410.67 $1,295.60 $702.24 $175.90 $793.88 $1,422.72 $2,973,40 $15,792.03 $63,737.52 $33,991.24 $17,734.56 $2,744.06 $1,855.84 C:~srmei~pENNSyLv%pENNd~c~yestimate,wb3 CITY OFCARMEL 3of4 PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT PROGRESS PAY For work done during the period of: 87 FIELD OFFICE, 550 SQ FT. 1.00 MOS 88 MAINTAINING TRAFFIC 0.10 LS 89 CONSTRUCTION ENGINEERING 0.10 LS 90 MOBILIZATION &DEMOBILIZATION LS 91 MATERIAL TESTING LS 92 TRAFFIC SIGNAL, 12" RYG EA 93 TRAFFIC SIGNAL, 12" RY GA EA 94 TRAFFIC SIGNAL, 12" RYG, YA, GA EA 95 PEDESTRIAN SIGNAL, INTERNATIONAL, 12" EA 96 PEDESTRIAN PUSHBU'I'FON &SIGN EA 97 HANDHOLE EA 98 CONDUIT, 2" LF ESTIMATE NO. 07 April 22, 2000 through May 31, 2000 5.75 MOS $410.00 $410.00 0.60 LS $30,795.00 $3,079.50 0.60 LS $108,125.00 $10,812.50 0.50 0.10 LS $85,650.00 LS $27,270.00 EA $444.70 EA $452.84 EA $708.12 EA $459.35 EA $166.02 EA $858.00 LF $16.82 99 TRAFFIC SIGNAL POLE, 40' SIG. ARM, 15' VIDI 100 TRAFFIC SIGNAL POLE, 45' SIG. ARM, 15' VID 101 TRAFFIC SIGNAL POLE, 75' SIG. ARM, 25' VIDI 102 TRF. SIG. POLE FOUNDATION INCLUDING RE 103 POWER CABLE, 2C/SGA 104 POWER CABLE, 3C/14GA 105 POWER CABLE, 5C/14GA 106 POWER CABLE, 7C/14GA 107 POWER CABLE, 1tC/14GA 108 VIDEO CAMERA CABLE, CX 109 8 PHASE CONTROLLER W/P CABINET & FOUl 110 VIDEO DETECTION SYSTEM, COMPLETE 111 ELECTRIC SERVICE 112 REMOVAL OF TR,~FFIC SIGNAL EQUIPMENT 113 PIPE CATCH BASIN, 12" (UNDISTRIBUTED) 114 PIPE, PVC, SCHEDULE40, 8" (UNDISTRIBUTE 115 INLET, C5 116 Manhole, C-4, Drop 117 Reset Existing CMP for Delta Drainage 118 Pipe, Type 2, Circular, 18 IN. 119 18 IN. Metal End Section 120 AdditionaISanitarylmprovements EA EA EA CY LF LF LF LF LF LF EA EA EA LS EA LF EA EA EA LF EEA LS EA EA EA CY LF LF LF LF LF LF EA EA EA LS EA LF EA 1.00 EA EA LF EA 0.44 LS $5,884.82 $6,886.21 $13,073.25 $407.36 $2.66 $1.92 $2.97 $2.94 $3.32 $2.96 $13,676.65 $33,259.20 $531.25 $2,181.94 $425.00 $11.55 $1,550.00 $3,946.00 $400.00 $19.00 $236.42 $52,000.00 $2,357.50 $18,477.00 $64,875.00 $42,825.00 $2,727.00 $3,946.00 $22,880.00 C:~carmd~ENNSYLV~pENNdoc~peyestima~,wb3 CITY OF CARMEL PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT &t97-04 PROGRESS PAY ESTIMATE NO. 07 For work done during the period of: April 22, 2000 through TOTALS AND PAY ESTIMATE CALCULATIONS TOTAL PAY THIS ESTIMATE TOTAL PAY TO DATE DEDUCT 10% RETAINAGE DEDUCT PREVIOUS NET PAY ESTIMATES NET PAY ESTIMATE NO. 07 CrossRoad Engineers, PC ~'~4~, ~ Inspecbng Firm May 31, 2000 $76,093.S3 $828,422.69 $82,842.27 $677,996.25 $67,584.17 lofl