Loading...
HomeMy WebLinkAboutNapleton Hyuandi - HVAC and Plumbing Plans - MP100SK S-2 200 S-2 200 S-3 240 S-3 240 S-3 240 S-3 240 S-1 100 S-1 100 S-1 100 S-1 100 S-1 100 S-3 240 8"Ø 10"Ø 10"Ø 10"Ø 10"Ø10"Ø6"Ø6"Ø6"Ø 6"Ø 6"Ø 20/1418/14 14"Ø 12"Ø12"Ø8"Ø 20/16EXISTING S/A DUCT SERVING SPACE NOT IN CONTRACT EXISTING R/ADUCTR-1 R-2 R-1 10"Ø 6"Ø 18"Ø 12"ØIMB 6 8 10 11 J K H J K H 6 8 10 11 EXISTING S/A DUCT SERVING SPACE NOT IN CONTRACT EXISTING R/A DUCTMP100 HVAC AND PLUMBING PLANS DRAWING ISSUE HISTORY BID / PERMIT ISSUE: CONSTRUCTION SET: COPYRIGHT 2021 210519 JP JP AS NOTED PROJECT NO: DRAWING DATE: DRAWN BY: CHECKED BY: DRAWING SCALE: HYUNDAI OF CARMELOFFICE REMODEL4200 E 96th STREETCARMEL, INDIANAA u t o m o t i v e G r o u pN MEP Consulting Engineers262 Tradewinds DriveSanta Rosa BeachFlorida 32459317.506.8151dave@gnaengineering.comGOODERUM & ASSOCIATES ENGINEERINGP:E:874 Cheltenham DriveAvon IN, 46123South OfficeNorth Office07-09-2021JEFFREY M. PE R KEY07-09-2021 07-09-2021 2 SCALE: 1/8" = 1'-0" HVAC AND PLUMBING PLAN 1. ROUTE 1/2" CW LINE FROM NEW CW LINE SERVING NEW SINK TO ICE MAKER BOX. 2. ROUTE NEW 1-1/2" SANITARY LINE DOWN FROM NEW SINK TO 1ST FLOOR INTERSTITIAL SPACE. ROUTE NEW LINE WEST IN INTERSTITIAL SPACE, THROUGH WIDE FLANGE BEAM ABOVE REFRESHMENT AREA, AND TO EXISTING SANITARY LINE 3" OR LARGER BEHIND DRINKING FOUNTAIN. ROUTE NEW 1-1/2" VENT LINE FROM NEW SINK TO EXISTING VENT LINE 2" OR LARGER. 3. ROUTE NEW 1/2" CW AND 1/2" HW LINES TO NEW SINK FROM RESTROOM AREA ON FIRST FLOOR TO WHICH THE SANITARY LINE IS ROUTED. 4. REMOVE SPIRAL DUCT BACK TO RECTANGULAR DUCT SECTION. 5. TRANSITION FROM EXISTING DUCT TO NEW DUCT WORK AT THIS POINT. 6. EXISTING S/A DUCT SERVING OFFICE NOT IN CONTRACT IS EXISTING TO REMAIN. 7. CONNECT EXISTING DUCT TO NEW DUCT WORK AND ADD MANUAL VOLUME DAMPER AS SHOWN. KEY NOTES: 1. REFERENCE SHEET MP001 FOR ABBREVIATIONS, SYMBOLS, SPECIFICATIONS AND SCHEDULES. 2. DEMOLITION PLANS ARE DIAGRAMMATIC AND BASED ON LIMITED SURVEY DATA. HVAC CONTRACTOR SHALL VISIT SITE, EXAMINE ALL PLANS AND DETERMINE EXISTING ELEMENTS TO REMAIN AND EXISTING TO BE REMOVED AS NEEDED TO MEET DESIGN INTENT. HVAC CONTRACTOR SHALL RECOVER ALL REFRIGERANTS AND DISPOSE OF ALL HVAC SYSTEMS PER EPA REQUIREMENTS. HVAC CONTRACTOR SHALL MAP OUT EXISTING DUCTWORK TO REMAIN, SEAL AND INSULATE PER SPECIFICATIONS AND REMOVE ALL UNUSED BRANCHES. 3. EXISTING HVAC UNIT WAS MANUFACTURED IN 2014. HVAC CONTRACTOR SHALL VERIFY EXISTING UNIT IS FUNCTIONING PROPERLY, CHANGE FILTERS, AND REPORT ALL DEFICIENCIES TO G.C. GENERAL NOTES: # 1 SCALE: 1/8" = 1'-0" HVAC DEMOLITION PLAN 3 4 5 2 6 7 SANITARY ISOMETRIC SCALE: NONE C SAN SK 1-1/2"1-1/2" V2 2 1 KEY PLAN SCALE: NONE LAY-IN DIFFUSER DETAILA SECURE FLEXIBLE DUCT TO SUPPLY DIFFUSER ELBOW FITTING WITH DRAWBANDS. SHEET METAL ELBOW SEAL ALL RIBS AND CONNECTION TO DIFFUSER NECK SUPPLY DIFFUSER ACT CEILING FLEX DUCT MAXIMUM LENGTH SHALL NOT EXCEED 7'-0" REFERENCE ARCHITECTURAL REFLECTED CEILING PLAN AND ELECTRICAL LIGHTING PLAN AND COORDINATE INSTALLATION WITH ALL CEILING ELEMENTS. 30° MAX O CONCENTRIC TRANSITION MAX, 45 DEG. DIVERGING AND 60 DEG. CONVERGING OFFSET. PROVIDE MINIMUM 2" STRAIGHT SECTION AT EACH END. MAX 30 DEG. ECCENTRIC TRANSITION MAX, 30 DEG. 30° MAX NOTE: IN GENERAL, ELBOWS TO HAVE FULL TURNING RADIUS (R=A). WHERE "R" IS EQUAL TO OR GREATER THAN "A" MINIMUM RADIUS (R) = 4 INCHES. R=A A DUCT CONSTRUCTION DETAILSB 45 DEG. OCL CONNECTION TAKE OFF. HAMMER LOCKED OR FLANGED AND FULLY SEALED RECTANGULAR DUCT BRANCH AIR FLOWV.D. 45 DEG. HIGH EFFICIENCY TAKE OFF COMPLETELY SEALED ROUND SHEET METAL DUCT TO DIFFUSER 118" NOTE: DOUBLE THICKNESS TURNING VANES TO BE USED WHERE NORMAL RADIUS ELBOW IS IMPRACTICAL & WHERE ELBOW IS WITHIN 5 FT OF A BRANCH TAKE-OFF.AIR FLOWSCALE: NONE SCALE: NONE 08/18/21