HomeMy WebLinkAboutNapleton Hyuandi - Partition and Millwork - A9.045.0°6"1 1/2"
2'-0"
2'-0"2'-10" DOOR4" 6"1 3/4"4"1'-0"
AC-01
2'-10" EQEQ EQ EQ
9'-8"
VIF
3'-0"1'-6" 2'-6"EQ EQ EQ EQ
4'-0"3'-6"3'-9" 7'-3"2'-2" 1 3/4"8"1'-0"
2'-0"
3/4"6" 1'-0"
1 1/2"
2'-0"
2'-0" 2'-10"4" 6"1 3/4"4"1'-0"
DRAWING ISSUE HISTORY
BID / PERMIT ISSUE:
CONSTRUCTION SET:
COPYRIGHT 2021
09-009-91
FG
FG
AS NOTED
PROJECT NO:
DRAWING DATE:
DRAWN BY:
CHECKED BY:
DRAWING SCALE: HYUNDAI OF CARMELOFFICE REMODEL4200 E 96th STREETCARMEL, INDIANAA u t o m o t i v e G r o u pN ADDRESS: 1414 N DEARBORN PKWYCHICAGO, ILLINOIS 60610FRED@NAPLETON.COM | 630.455.2910A9.0
PARTITION AND MILLWORK
DETAILS
NOTE:
CONTRACTOR TO CONFIRM HEIGHT LIMITS AND METAL STUD SIZES PRIOR TO
ORDERING MATERIALS FOR NEW PARTITIONS
05-10-21
NOTE:
CONTRACTOR TO VERIFY REQUIRED PARTITION STUD DEPTH WHERE MATCHING
EXISTING PARTITION CONSTRUCTION.
07-09-21
08/18/21