Loading...
HomeMy WebLinkAboutNapleton Hyuandi - Cover Sheet - A0.0OCCUPANCY CALCULATIONS BASED ON 2012 IBC TABLE 1004.1.2 - MAXIMUM FLOOR AREA ALLOWANCES PER OCCUPANT ALLOWANCE AREA (GROSS) OCCUPANTS TOTAL OCCUPANT LOAD 2,994 SF FUNCTION OF SPACE GENERAL OFFICE (EX'G) 100 GROSS ALLOWED ACTUAL 20 1,928 SF 30 20 32 PANTRY OCCUPANCY CLASS BUSINESS ROOM AREAS: 487 SF PAYROLL OFFICE 252 SF 120 SF 100 GROSS 2 2 5 6OFFICE ADDITION 100 GROSSBUSINESS BUSINESS OFFICE MANAGER 207 SF100 GROSS 2 2BUSINESS 100 GROSS BUSINESS 3 0 DRAWING ISSUE HISTORY BID / PERMIT ISSUE: CONSTRUCTION SET: COPYRIGHT 2021 09-009-91 FG FG AS NOTED PROJECT NO: DRAWING DATE: DRAWN BY: CHECKED BY: DRAWING SCALE: HYUNDAI OF CARMELOFFICE REMODEL4200 E 96th STREETCARMEL, INDIANAA u t o m o t i v e G r o u pN ADDRESS: 1414 N DEARBORN PKWYCHICAGO, ILLINOIS 60610FRED@NAPLETON.COM | 630.455.2910A0.0 I HEREBY CERTIFY THAT THESE DRAWINGS WERE PREPARED UNDER MY PERSONAL SUPERVISION AND THAT, TO THE BEST OF MY KNOWLEDGE AND BELIEF, THEY COMPLY WITH ALL LAWS, CODES AND ORDINANCES OF THE CITY OF CARMEL AND THE STATE OF INDIANA, INCLUDING THE ACCESSIBILITY STANDARDS OF THE STATE OF INDIANA. SIGNED: DATE: JULY 9, 2021 FREDERICK GRIER STATE OF INDIANA ARCHITECT BOARD REGISTRATION NO. AR12000154 EXPIRATION 12-31-2021 PROJECT CONTACTS VICINITY MAP NOT TO SCALE GENERAL DRAWING NOTES OFFICE REMODEL NAPLETON'S HYUNDAI OF CARMEL 4200 E 96th STREET INDIANAPOLIS, IN 46240 GENERAL CONTRACTOR COVER SHEET ARCHITECT MEP ENGINEER LOCATION 06-16-21 INDEX OF DRAWINGS PROJECT DATA SHEET DRAWING NAME DATEOCCUPANT LOAD CALCULATIONS 07-09-21 08/18/21