Loading...
HomeMy WebLinkAboutCC-03-05-01-01 Hazel Dell PaymtSponsored by: John Kovcil Resolution No. CC-03-05-01-01 A RESOLUTION OF THE COMMON COUNCIL OF THE CITY OF CARMEL, INDIANA APPROVING PAYMENT OF CONSTRUCTION COSTS FOR HAZEL DELL & PENNSYLVANIA BOND PROJECT WHEREAS, pursuant to Article Ilk Section 3.01 (b) of the Trust Indenture by and among the City of Carreel Redevelopment Authority and Fi~b Third Bank of Central Indiana, dated as of August 1, 1997, approval by the Common Council is required prior to payments from tbe Construction Fund therein described upon presentation of architect' s or engineer's certificates of work completed and materials furnished; WHEREAS, American Consulting Engineers, Inc, has presented such ccrtificatcs regarding the Construction Prqiect Invoices attached hereto as Exhibit A NOW, THEREFORE, BE 1T RESOLVED by the Common Counci[ ol'lhe Ci|y Carmel, Indiana, that the Construction Project Invoices attached hereto as Exl~ibit A arc hereby approved tbr payment fi'om tile Construction Fund described in tl~e above- referenced Trust h3denture. of ~';lci,:;(~/L ........ 2001, by a voteof__~ ayes and _ C__) nays ATTEST:/j~ ,~ 2 '~ .},It2, ~r,~ ,2001. Ap roved by me, Mayor of the City P'rS'),',? ,~ ,Hl ,2001. ;//,5 day of Dian~i'L, Cordray, iAMC, Cler~easurer of Carmel, Indiana, this /C/~'/2 day of , Mayor ATTEST: Diana L, CordrayZ l~/,%asurer PAYEE EXHIBIT A PAYMENT REQUISITION NO. 142 AMOUNT CHARACTER OF EXPENDITURE DUE Trotter Construction, Inc. 5851 E. 34tl' Street Indianapolis, IN 46218 $119,081.77 Construction fees rendered in connection with Pennsylvania St. O212O1O 1 COMPANY NAME: AND ADDRESS TELEPHONE NO.: FAX NO.: COMPANY NAME: AND ADDRESS TELEPHONE NO.: FAX NO.: PROJECT NAME: PROJECT NO.: INVOICE NO.: CONSTRUCTION PROJECT INVOICE Trotter Construction, Inc. 5851 E 34th Street Indianapolis, IN 46218 (317) 543-0053 (317) 543-3115 Grady Brothers, Inc. 915 S. Somerset Ave. Indianapolis, IN 46242 (317) 244-3343 (317) 240-5958 Pennsylvania Street Improvements 97-04 15 DATE: February 15, 2001 Construction pay items as per Progress Pay Estimate No. 15 as shown on the attached invoice for work completed between the dates of December 22, 2000 and February 16, 2001. $119,081.77 (-) $0.00 $119,081.77 TOTAL PAY THIS ESTIMATE: MINUS RETAINAGE: TOTAL NOW DUE: Submitted by CrossRoad Engineers, PC ,=---,,,.-c c_ Project Representative - printed name Date CITY OF CARMEL PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT #97-04 PROGRESS PAY ESTIMATE NO. 15 For work done during the period of: 12-22-00 through TOTALS AND PAY ESTIMATE CALCULATIONS 1 of 1 TOTAL PAY THIS ESTIMATE $119,081.77 TOTAL PAY TO DATE $3,020,509.97 DEDUCT t0% OF 50% OF CONTRACT FOR RETAINAGE $197,669.86 DEDUCT PREVIOUS NET PAY ESTIMATES $2,703,758.34 NET PAY ESTIMATE NO. t5 CrossRoad Engineers, PC inspecting Firm Contractor '~bcl,, a.--c..s "~'nc. C~nlractoy $1t9,08t.77 "Date Date CITY OFCARMEL PENNSYLVAN~ STREETIMPROVEMENT PROJECT PROJECT fffi7-04 PROGRESS PAY ESTIMATE NO. 15 For work done during the period of: 12-22-00 through item Description Qual~ity ~is Total Quanffiy Unit No. Estimate to Date Pdce I CLEARING RIGHT OF WAY 2 CONCRETE CURB, REMOVE 3 CATCH BASIN, REMOVE 4 SURFACE MILIJNG. BITUMINOUS 5 PIPE, REMOVE 6 EXCAVATION, COMMON 7 BORROW 8 EXCAVATION, COMMON FOR DITCH GRADIh 9 TEMP. EROSION & SEDIMENT CONTROL, PE i, 10 TEMP. EROSION & SEDIMENT CONTROL, CL _ 11 TEMP. EROSION & SEDIMENT CONTROL, DR 12 TEMP. EROSION & SEDIMENT CONTROL, CL 13 B BORROW FOR STRUCTURE RACKFILL 14 COMPACTED AGG. FOR SHOULDER, O, SIZE , 15 COMPACTED AGGREGATE FOR APPR., O, S ! 16 COMPACTED AGGREGATE FOR DRIVES, O, ~17 HMA BASE, 25.0 mm MAIN_EUNE, D 18 HMA BASE, 25.0 mm MAINELINE, C 19 HMA RASE, 25.0 mm MAINELINE 20 HMA INTERMEDIATE, 19.0 mm MAINELINE 21 HMA SURFACE, 9.5 mm MV, MAINELINE 22 BITUMINOUS MATERIAL FOR TACT COAT 23 CURB RAMP, CONCRETE 24 SIDEWALK, CONCRETE 25 StDEWALK, BITUMINOUS 26 CURB, CONCRE'I;E 27 CURB AND GU'I'TER, COMBINED 28 CENTER CURB, CONCRETE, MODIFIED 29 BITUMINOUS MIXTURE FOR APPROACHES, 30 GEOTEXTILES 31 RIPRAP, REVETMENT 18 IN. 32 MOBILIZATION & DEMOBIUZATION FOR SEE 33 MULCHED SEEDING, R 34 SODDING 35 TREES, REPLANT 36 SANITARY SEWER SERVICE ADJUSTMENT 37 PIPE, RCP, 12 IN. 38 PIPE, RCP, 15 IN. 39 PIPE, RCP, 18 IN, 40 PIPE, RCP, 21 IN. 41 PIPE, RCP, 24 IN. 42 PIPE, RCP, 27 IN. 43 PIPE, RCP, 30 IN. 44 PIPE, RCP, 33 IN. 45 PIPE, RCP, 42 IN. 46 PIPE, RCP, 54 IN, 47 PIPE, GROUP K, 6 IN. 2-15-01 Total Pay this Estimate Total Pay to Dato lof4 LS 0.80 LS $68,796.59 $55,037.27 LFT 7519.00 LFT $2.55 $19,173.45 EA 8.00 EA $60,00 $480.00 SY 131.94 SY $6.65 $877.40 LF 849.00 LF $11,60 $9,848.40 33,00 CY 11724,25 CY $8,60 $283.88 $100,828.55 CY 19065.45 CY $13.18 $251,282.63 LS 1.00 LS $16,126.96 $16,126.96 LF 5860.00 LF $1.70 $9,962.00 RA 1.00 RA $66.00 $66.00 RA EA $66.00 RA 13.00 RA $37.83 $491.79 206.91 CY 7966.66 CY $14.75 $3,037.17 $117,5082.4 TN TN $20.53 TN 1082.04 TN $23.47 $25,395.48 TN 418.12 TN $32.3t $13,509.46 TN TN , $26.43 TN TN $31.52 TN TN $26.43 TN TN $29.13 TN TN $32.72 SY SY $0.14 SY 40.01 SY $31.46 $1,258.71 169.00 SY 2413.87 SY $24.22 $3,8~0.98 $58,463.93 TN TN $37.99 LF 6285.79 LF $10.68 $67,132.24 LF 12962.90 LF $9.92 $128,591.97 SY 635.68 SY $73.76 $46,887.76 TN 565.98 TN $74.45 $42,137.21 30.00 SY 178.11 SY $3.96 $118,80 $705,32 19.36 TN 77.15 TN $21.67 $419.53 $1,671.84 RA EA $660.00 SY SY $0.44 SY 75.00 SY $2.59 $194.25 EA 12.00 EA $150.00 $1,800.00 LF 76.00 LF $39.91 $3,033.16 LF 2650.00 LF $24.43 $64,739.50 LF 546.50 LF $25.64 $14,012.26 LF 189.00 LF $28.11 $5,312.79 LF 916.00 LF $3804 $34,844.64 191.00 LF 1459.50 LF $45.08 $6~610.28 $65,794.26 LF 933.50 LF $53,14 $49,606.19 LF 677.00 LF $54.02 $36,571.54 63.00 LF 1177.00 LF $61.11 $3,849.93 $71,926.47 LF 28.00 LF $96.36 $2,698,08 LF 34.50 LF $98.86 $3,410.67 LF 7497.50 LF $3.28 $24,591.80 CITY OF CARMEL PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT #97-04 PROGRESS PAY ESTIMATE NO. 15 12-22-00 through EA EA $154.86 EA EA $236.42 EA EA $378.47 EA EA $1,744.02 LF 1889.20 LF $10.40 EA EA $75.61 CY 420.31 CY $23.10 SY 1524.62 SY $1.10 EA EA $335.00 EA 3.00 EA $793.88 EA EA $72.25 EA 2.00 EA $145.52 2.00 EA 15.00 EA $235.00 EA 1.00 EA $1,422.72 EA 1.0O EA $2,973.40 EA EA $1,986.52 EA 3.00 EA $5,264.01 EA 1.00 EA $5,285.80 1.00 EA 27.00 EA $2,655.73 EA 32.00 EA $1,477.88 EA 18.00 EA $1,477.88 EA 2.00 EA $1,372.03 EA EA $65.75 EA 13.00 EA $212.10 EA 5.00 EA $477.23 EA EA $37.12 EA 25.00 EA $132.56 SFT SFT $24.85 LF LF $6.62 LF LF $6 .26 LF LF $0~-~-~-~-~-~-~-~-~-~ LF LF $1.41 LF LF $0.27 LF LF $0.25 LF LF $2.85 EA EA $60.62 EA EA $87.57 EA EA $28.72 LF LF $0.62 1.00 MOS 13.75 MOS $410.00 LS 0.80 LS $30,795.00 LS 0.80 LS $108,125.00 LS 0.70 LS $85,650.00 LS 0.60 LS $27,270.00 9.00 EA 12.00 EA $444.70 4.00 EA 4.00 EA $452.84 6.00 EA 8.00 EA $708.12 6.00 EA 6.00 EA $459.35 6.00 EA 6.00 EA $166.02 EA 8.00 EA $658.00 LF 1646.00 LF $16.82 For wo~ done during the period of: PIPE END SECTION, METAL, 12 PiPE END SECTION, METAL, 21 IN. PIPE END SECTION, METAL, 33 IN. PIPE END SECTION, METAL, 53 IN. PIPE, PVC, 6 IN., SCHEDULE 40 PIPE END SECTION REINSTALL 48 49 50 51 52 53 54 AGGREGATE FOR UNDERDRAINS, 8 55 GEOTEXTILES FOR UNDERDRAIN 56 RING AND COVER, 4 57 INLET, E7 58 PIPE, PLUG EXISTING 59 PIPE HOLE IN EXISTING STRUCTURE, PLUG 60 CASTING, ADJUST TO GRADE 61 INLET, H5 62 MANHOLE, KS 63 SANiTARY MANHOLE, C4 64 MANHOLE, L4 65 MANHOLE, L15 66 MANHOLE, J15 67 INLET, B15 68 INLET, C15 69 MANHOLE, J4 70 CONSTRUCTION DRUM, LEAVE IN PLACE 71 BARRICADE, IlIA 72 ROAD CLOSURE SIGN ASSEMBLY 73 DETOUR CLOSURE SIGN ASSEMBLY 74 CONSTRUCTION SIGN, A 75 SIGN, SHEET, ENCAPSULATED LENS WiTH l 76 SIGN POST, A 77 LINE, THERMOPL:ASTIC, BROKEN WHITE, 4" 78 LINE, THERMOPLASTIC, SOLID WHITE, 4" 79 TRANSVERSE MARKINGS, THERMO. CROSS 80 UNE, THERMOPLASTIC, BROKEN YELLOW, ,~ 81 LINE, THERMOPLASTIC, SOLID YELLOW, 4" 82 TRANSVERSE MARKINGS, THERMO. STOP L 83 PVMT. MESSAGE MRKNGS, THERMO., LANE 84 PVMT. MESSAGE MRKNGS, THERMO.. WORI 85 SNOWPLOWABLE RAISED PAVEMENT MARl 86 LINE, THERMOPLASTIC, DOTTED, WHITE, 4" 87 FIELD OFFICE, 550 SQ FT. 88 MAINTAINING TRAFFIC 89 CONSTRUCTION ENGINEERING 90 MOBILIZATION & DEMOBILIZATION 91 MATERIAL TESTING 92 TRAFFIC SIGNAL, 12" RYG 93 TRAFFIC SIGNAL, 12" RY GA 94 TRAFFIC SIGNAL, 12" RYG, YA, GA 95 PEDESTRIAN SIGNAL, INTERNATIONAL, 12" 96 pEDESTRIAN PUSHBUTTON & SIGN 97 HANDHOLE 98 CONDUIT, 2" 2-15-01 $470.00 $2,666.73 $410.00 $1,811.36 $2,756.10 $996.12 2of4 $191439.68 $9,709.16 $1,677.08 $2,381.64. $291.04 $3,525.00 $1,422.72 $2,973.40 $15,792.03 $5,285.80 $71,704.71 $47,292.16 $26,601.84 $2,744.06 $2,757.30 $2,386.15 $3,314.00 $5,637.50 $24,636.00 $86,500.00 $59,955.00 $16,3~2.00 $5,336.40 $1,811.36 $5,6S4.96 $2,756.10 $996.12 $6,864.00 $27,685.72 CITY OFCARMEL PENNSYLVAN~ STREETIMPROVEMENTPROJECT PROJECTfffi7-04 PROGRESS PAY ESTIMATE NO. 15 For work done dudng the period of: 12-22-00 99 TRAFFIC SIGNAL POLE, 40' SIG. ARM, 15' VIC EA 100 TRAFFICSIGNALPOLE, 45'SIG. ARM, 15'VIC EA 101 TRAFFIC SIGNAL POLE, 75' SIG. ARM, 25' VIC EA 102 TRF. SIG. POLE FOUND ATION INCLUDING RE CY · 103 POWER CABLE, 2C/SGA LF 210.00 104 POWER CABLE, 3C/14GA 403.00 LF 3529.00 105 POWER CABLE, 5C/14GA 831.00 LF 2354.00 106 POWER CABLE, 7CI14GA 336.00 LF 335.00 107 POWER CABLE, 11C/14GA LF 1603.00 108 V1DEO CAMERA CABLE, CX 386.00 LF 1988.00 109 8 PHASE CONTROLLERW/P CABINET & FOL EA 2.00 110 VIDEO DETECTIQN SYSTEM, COMPLETE EA 111 ELECTRIC SERVICE 1.00 EA 2.00 112 REMOVAL OF TRAFFIC SIGNAL EQUIPMENT LS 113 PIPE CATCH BASIN, 12" (UNDISTRIBUTED) EA 114 PIPE, PVC, SCHEDULE 40, 8" (UNDISTRIBUTE LF 115 INLET, C5 EA 116 Manhole, C4, Drop EA 117 Reset Existing CMP for Delta Drainage EA 118 Pipe, Type 2, Circular, 18 IN, LF 119 t8 IN. Metal End Sec'don EA 120 Addffional Sanitary Improvements LS 121 ReconsffuctStnJcture87A LS 122 ReconsffuctSffucturetoGrade LF 123 CostofSfrdcture~187B, notinstaged LS 124 Delta EH3ht Relocation LS 125 Encase Conduit at S~ucture ~124 LS 126 PedistalFoundation, A EA 127 Pedistal and Base, 10 ft. EA 128 HMA BASE, 25.0 ~m MAINLINE, C TN 5862,44 129 HMA BASE, 25.0 mm MAINLINE TN 17170`29 130 HMA INTERMEDIATE, 19.0 mm MAINLINE TN 6856.74 131 HMASURFACE, 9.5mmMV, MAINLINE TN 280.98 132 BITUMINOUS MATERIAL FOR TACK COAT SY 67484.73 133 SIDEWALK, BITUMINOUS TN 283.08 134 INLETS, RELOCATE LS 1.00 135 TRAFFIC SIGNAL POLE, 50' BIG. ARM, 25' VIE 2.00 EA 2.00 TRAFFIC SIGNAL POLE, 40' SIG. ARM, 25' VIC EA .138 TRAFFIC SIGNAL POLE, 40' SIG. ARM, 20' VIC 1.00 BA 139 TRAFFIC SIGNAL POLE, 35' BIG. ARM, 25' VIP EA 140 TRAFFIC SIGNAL PQLE, 30'SIG. ARM, 25'VIC 1.00 BA 141 SIGNAL SUPPORT FOUNDATION, 3 FT, X 12 I EA 142 MODIFICATION TO STORM STRUCTURES LS 143 MISCELLANEOUS SITE WORK, MILLING/HAU LS 144 MANHOLE, REMOVE AND REPLACE STRUC'I EA 145 FLOWABLE FILL CYS 1~.6 CORED HOLE IN MANHOLE F.A 147 KEYSTONE RETAINING WALL SFT 148 CEMENT CONCRETE PAVEMENT FOR DRIV~ SY 149 STR. 133AAddi0onalCosts LS through 2-1501 EA $5,884.82 BA $6,886 `21 BA $13,07325 CY $407.36 LF $2.66 $558.60 LF $1.92 $'/73.76 $6,775.68 LF $2.97 $2,4~8.07 $6,991.38 LF $2.94 $984.S0 $984.90 LF $3.32 $5,321.96 LF $3.96 $1,13g.~0 $6,884.48 EA $13,676.65 $27,353.30 BA $33,259.20 BA $531.25 1~31.26 $1,062.50 LS $2,181.94 EA $425.00 LF $11.55 BA $1,560.00 1.00 BA $3,946.00 $3,946.00 4.00 EA $400.00 $1,600.00 298.00 LF $19.00 $5,662.00 BA $236,42 1.00 LS $52,000.00 $52,000.60 1.00 LS $350.00 $350.00 23,05 LF $525.00 $12,101,25 1.00 LS $1,130.80 $1,130.80 1.00 LS $3,694.00 $3,694.00 1.00 LS $450.00 $450.00 EA $592.66 BA $617.68 TN $33.40 $195,805.50 TN $28.31 $486,080.91 TN $31,27 $214,410 .:26 TN $35.51 $9,977.60 SY $0.15 $10,122.71 TN $40.17 $t 1,371.32 LS $1,888.24 $1,868.24 BA $14,076.18 $28,182.36 $28,152.36 EA $7,383.09 1.00 EA $7205.85 $7205.85 1.00 EA $7,205.86 $7,206.86 $7,205.86 1.00 EA $6,653.69 $6,653.69 2.00 EA $6,629.49 $6,629.49 $13,258.98 8.00 EA $1,908.51 $15,268.08 1.00 LS $1,045.00 $1,045.00 1.00 LS $930.00 $930.00 1.00 EA $3,200.00 $3,200.00 18.00 CYS $50.00 $900.00 1.00 EA $375.00 $375.00 776.50 SFT $18.13 $14,077.95 98.04 SY $42.00 $4,117.68 1.00 LS $961.70 $$61.70 3of4 C:~Ca~ENNSYLV~wb3 CITY OF CARMEL PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT #97-04 PROGRESS PAY ESTIMATE NO. 15 For work done during the period of: 12-22-00 through 150 Addffional Costs For Sanitan/Sewer Improvemet LS 1.00 LS $7,765.51 151 STRUCTURE 224A (T1ME AND MATERIAL) 1.00 LS 1.00 LS $34,383.78 2-1501 $7,765.51 $34,383.78 $,,!4,383.78 4~f4 $119,081.77 $3,020,509.97 CITY OF CARMEL REDEVELOPMENT AUTHORITY CONSTRUCTION FUND PAYMENT REQUISITION TO: Fifth Third Bank of Central Indiana, as TrUstee 251 North Illinois Street Suite 1000 Indianapolis, Indiana 46204 Attn: Corporate Trust Department Date: February20,2001 RE: Trust Indenture between City of Carmel Redevelopment Authority and Fifth Third Bank of Central Indiana, as Trustee, dated as of August 1, 1997 (the "Trust Indenture") AFFIDAVIT STATE OF INDIANA ) ) COUNTY OF HAMILTON ) SS: The undersigned, having been duly sworn upon her oath, certifies that: She has been designated by the Carmel Redevelopment Authority as an individual authorized to execute and present affidavits on the Authority's behalf relating to payments from the Construction Fund for items that are not subject to certification by the architect or engineer, in accordance with Article IV, Section 3.01(b) of said Trust Indenture. The amounts set forth in Exhibit A hereto are requested to be paid to the respective Payees identified therein tbr the services or assets described, from the Construction Account of the Construction Fund created by Section 3.01 of the Trust Indenture. Copies of the statements of the respective Payees or other supporting documentation are also attached hereto. The obligations set forth in Exhibit A have been properly incurred, are proper charges against the Construction Account, and have not been the basis of any previous withdrawals from the Construction Account. CITY OF CARMEL REDEVELOPMENT AUTHORITY City Engineer, City of Carmel, Indiana STATE OF INDIANA COUNTY OF HAMILTON Before me, the undersigned, a Notary Public in and tbr said County and State, personally appeared__Kate Weese , City Engineer for the City of Carmel, Indiana, who having been duly sworn upon her oath acknowledged the execution of the foregoing Affidavit tbr and on behalf of said Authority. Witness my hand and Notarial Seal this J~4*"day of February, 2000 My Commission Expires: residing in Indiana , Notary Public County,