Loading...
HomeMy WebLinkAboutCC-08-06-01-01 Hazel Dell PaymtSponsored by: Kevin Kirby Resolution No. CC-08-06-01-01 A RESOLUTION OF THE COMMON COUNCIL OF THE CITY OF CARMEL, INDIANA APPROVING PAYMENT OF CONSTRUCTION COSTS FOR HAZEL DELL & PENNSYLVANIA BOND PROJECT WHEREAS, pursuant to Article III, Section 3.01 (b) of the Trust Indenture by and among the City of Carmel Redevelopment Authority and Fifth Third Bank of Central Indiana, dated as of August 1, 1997, approval by the Common Council is required prior to payments from the Construction Fund therein described upon presentation of architect' s or engineer's certificates of work completed and materials furnished; WHEREAS, American Consulting Engineers, Inc., has presented such certificates regarding the Construction Project Invoices attached hereto as Exhibit A. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Carmel, Indiana, that the Construction Project Invoices attached hereto as Exhibit A are hereby approved for payment from the Construction Fund described in the above- referenced Trust Indenture. day THE CITY OF CARMEL, IANA (~K'~v~_ i r~~ oven~ ~ ATTEST: ~_f-~fJ.,~E' , 2001. ,2001. ~/es~B'~ainard, Mayor ATTEST: Diana L. Cordray, IAM~-Treasurer CITY OF CARMEL REDEVELOPMENT AUTHORITY CONSTRUCTION FUND PAYMENT REQUISITION TO: Fifth Third Bank of Centrai Indiana, as Trustee 251 North Illinois Street Suite 1000 Indianapolis, Indiana 46204 Attn: Corporate Trust Department Date: July 11, 2001 Trust Indenture between City of Camel Redevelopment Authority and Fifth Third Bank of Central Indiana, as Trustee, dated as of August 1, 1997 (the "Trust Indenture") AFFIDAVIT STATE OF INDIANA ) ) COUNTY OF HAMILTON ) SS: The undersigned, having been duly sworn upon her oath, certifies that: She has been designated by the Carmel Redevelopment Authority as an individual authorized to execute and present affidavits on the Authority' s behalf relating to payments from the Construction Fund for items that are not subject to certification by the architect or engineer, in accordance with Article IV, Section 3.01 (b) of said Trust Indenture. The amounts set forth in Exhibit A hereto are requested to be paid to the respective Payees identified therein for the services or assets described, from the Construction Account of the Construction Fund created by Section 3.01 of the Trust Indenture. Copies of the statements of the respective Payees or other supporting documentation are also attached hereto. The obligations set forth in Exhibit A have been properly incurred, are proper charges against the Construction Account, and have not been the basis of any previous withdrawals from the Construction Account. CITY OF CARMEL REDEVELOPMENT AUTHORITY City Engineer, City of Carmel, Indiana STATE OF INDIANA COUNTY OF HAMILTON SS: Before me, the undersigned, a Notary Public in and for said County and State, personally appeared Kate Weese , City Engineer for the City of Carmel, Indiana, who having been duly sworn upon her oath acknowledged the execution of the foregoing Affidavit for and on behalf of said Authority. Witness my hand and Notarial Seal this/;74~day of July, 2000 My Commission Expires: residing in Indiana , Notary Public PAYEE EXHIBIT A PAYMENT REQUISITION NO. 157 AtMOUNT CHARACTER OF EXPENDITURE DUE Trotter Construction Co. 5851 E. 34th Street Indianapolis, IN 46218 $143,852.38 Constructions Costs in connection with Pennsylvania St. 07/11/01 CONSTRUCTION PROJECT INVOICE DATE: June 13, 2001 COMPANY NAME: AND ADDRESS Trotter Construction, Inc. 5851 E. 34~ Street Indianapolis, IN 46218 TELEPHONE NO.: FAX NO.: COMPANY NAME: AND ADDRESS TELEPHONE NO.: FAX NO.: (317) 543-0053 (317) 543-3115 Grady Brothers, Inc. 915 S. Somerset Ave. Indianapolis, IN 46242 (317) 244-3343 (317) 240-5958 RECEIVED CITY ENGINEER PROJECT NAME: Pennsylvania Street Improvements PROJECT NO.: 97-04 INVOICE NO.: 17 Construction pay items as per Progress Pay Estimate No. 17 as shown on the attached invoice for work completed between the dates of April 19, 2001 and June 8, 2001. TOTAL PAY THIS ESTIMATE: MINUS RETAINAGE: TOTAL NOW DUE: Submitted by CrossRoad Engineers, PC Project Representative - signed name $143,852.38 $0.00 $143,852.38 Date Project Representative - printed name 1 of 4 CITY OF CARMEL PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT ~97-04 PROGRESS PAY ESTIMATE NO. 17 For work done during the period of: 4-t9-2001 through I Description Quantity titis Total Quanl~/ Unit Estimate to Dam Rice I CLEARING RIGHT OF WAY LS 0.80 2 CONCRETE CURB, REMOVE 86.30 LFT 7605.30 3 CATCH BA.SIN, REMOVE 1.00 EA 9.00 4 SURFACE MILLING. BITUMINOUS SY 131.94 5 PIPE, REMOVE LF 849.00 6 EXCAVA~ON, COMMON CY 11724.25 7 BORROW CY 19065.45 8 EXCAVAT!ONI COMMON FOR DITCH GRAD!~ 0.01 LS ! 01 9 TEMP. EROSION & SEDIMENT CONTROL, PE LF 5860,00 10 TEMP. EROSION & SEDIMENT CONTROL, CL EA 1.00 11 TEMP, EROSION & SEDIMENT CONTROL, DR EA 12 TEMP. EROSION & SEDIMENT CONTROL, CL EA 13.00 13 B BORROW FOR STRUCTURE BACKFILL CY 7966,66 14 COMPACTED AGG. FOR SHOULDER, O, SIZE TN 15 COMPACTED AGGREGATE FOR APPR,, O, S 525.41 TN 1607.45 16 COMPACTED AGGREGATE FOR DRIVES, O. TN 418.12 17 HMA BASE, 25.0 mm MAINELINE, D TN 18 HMA BASE, 25.0 mm MAINELINE. C TN 19 HMA BASE, 25.0 mm MAINELINE TN 20 HMA INTERMEDIATE, 19.0 mm MAINELiNE TN 21 HMA SURFACE, 9.5 mm MV, MAiNELINE TN 22 BITUMINOUS MATERIAL FOR TACT COAT SY 23 CURB RAMP, CONCRETE 6.r~ SY 63.34 24 SIDEWALK, CONCRETE 315.60 SY 2873.79 25 SIDEWALK, BITUMINOUS TN ~ 26 CURB, CONCRETE LF 6285.79 : 27 CURB AND GUTTER, COMBINED SO.00 LF 13052.90 28 CENTER CURB, CONCRETE, MODIFIED SY 635,68 29 BITUMINOUS MIXTURE FOR APPROACHES, 93.89 TN 659.87 30 GEOTEXTILES SY 178.11 31 RIPRAP, REVETMENT 18 IN, TN 77.15 ~ 32 MOBILIZATION & DEMOBILIZATION FOR SEE 1.00 EA 1.00 33 MULCHED SEEDING, R 3157.00 SY 3157,00 34 SODDING 7680.00 SY 7755.00 35 TREES, REPLANT EA 12.00 36 SANITARY SEWER SERVICE ADJUSTMENT LF 76.00 ' 37 PIPE, RCP, 12 IN. 14.00 LF 2680.C0 38 PIPE, RCP, 15 IN. 15.00 LF 561.50 ' 39 PIPE, RCP, 18 IN. LF 189.00 40 PIPE, RCP, 21 IN. LF 916.00 , 41 PIPE, RCP, 24 IN LF 1459.50 42 P~PE, RCP, 27 IN. LF 933.50 43 PIPE, RCP. 30 IN. LF 677.00 ~ 44 PIPE, RCP, 33 IN. 40.00 LF 1217.00 ! 45 PIPE, RCP. 42 IN. LF 28.00 ; 46 PIPE, RCP, 54 IN. LF 3450 [ 47 PIPE, GROUP K, 6 IN. 205.00 LF 7702.50 LS $68,796.59 LFT $2.55 EA $60.00 SY $6.65 LF $11.60 CY $8.60 CY $13.18 LS $!6,!26~k~ LF $1.70 EA $66,00 EA $66.00 EA $37.83 CY $14.75 TN $20.53 TN $23.47 TN $32.31 TN $26.43 TN $31.52 TN $26.43 TN $29.13 TN $32.72 SY $0.14 SY $31.46 SY $24,22 TN $37.99 LF $10,68 LF $9.92 SY $73.76 TN $74.45 SY $3.96 TN $21.67 EA $660.00 SY $0.44 SY $2.59 EA $150.00 LF $39.91 LF $24.43 LF $25.64 LF $28,11 LF $38.04 LF $45,08 LF $53,14 LF $54.02 LF $61.11 LF $96.36 LF $98.86 LF $3.28 6-8-2001 Total Pay this Est~nate $220.06 $60.00 $227,39 $t2,331.37 $209.52 $7,648.68 $892.80 $6,990.11 $660.00 $11389.08 $19,891.20 $342.02 $384.60 $2,444.40 $672.40 Total Pay to Date $55,037.27 $I9,393.52 $540.00 $877,40 $9,848.40 $IC0.828.55 $251.282.63 $16,364.35 $9,962.00 $66.00 $491.79 $117,508,24 $37,726.85 $t3,509.46 $1,992.68 $69,803,19 $67,132.24 $129,484.77 $46,887.76 $49,127.32 $705.32 $1,671.84 $660.00 $1,389.08 $20,085.45 $1.800,00 $3,033.16 $65,472.40 $14,396.86 $5,312.79 $34,844.64 $65,794.26 $49,606.19 $36,571.$4 $74,370.87 $2,698,08 $3,410.67 $25,264.20 CITY OF CARMEL PENNSYLVANIA STREET IMPROVEMENT PROJECT ~E97-04 PROJECT 2 of 4 PROGRESS PAY ESTIMATE For work done during the period of: ! 48 PiPE END SECTION, METAL, 12 IN. 2.00 EA 49 PiPE END SECTION, METAL, 21 IN. EA ~ 50 PIPE END SECTION. METAL. 33 IN, EA ! 51 PIPE END SECTION, METAL, 53 IN. EA 52 PIPE, PVC, 6 IN., SCHEDULE 40 LF NO. 17 4-19-2001 through 2.00 EA $154.86 EA $236.42 EA $378,47 EA $1,744.02 1869.20 LF $10.40 6-.8-2001 S309,72 $309.72 $19,439.68 53 PrPE END SECTION REINSTALL EA EA $75.61 54 AGGREGATE FOR UNDERDRAINS, 8 23.66 CY 443.97 CY $23.10 $546.58 $10,255.71 ! 55 GEOTEXTILESFORUNDERDRAIN SY 1524.82 SY $1.10 $1,677.08 56 RING AND COVER, 4 EA 1.00 EA $335.00 $335.00 57 INLET, E7 1.00 EA 5,00 EA $793.88 $793.88 $3,969.40 ; 58 PIPE, PLUG EXISTING EA EA $72.25 59 PiPE HOLE IN EXISTING STRUCTURE, PLUG EA 2.00 EA $t45.52 $291.04 60 CASTING, ADJUST TO GRADE 3.00 EA 26.00 EA $235.00 $705.00 $6,1 t 0.00 61 INLET, H5 EA 1.00 EA $1,422.72 $1,422.72 62 MANHOLE, K5 EA 1.00 EA $2,973.40 $2,973,40 63 SANITARY MANHOLE, C4 EA EA $1,986.52 64 MANHOLE. L4 EA 3.00 EA $5,264.01 $15,792,03 65 MANHOLE, L15 EA 1.00 EA $5,285.80 $5,285.80 86 MANHOLE, J15 EA 27.00 EA $2,655.73 $71,704.71 67 INLET, B15 EA 32.00 EA $1,477.88 $47,292.18 68 iNLET, C15 EA 18,00 EA $1,477.88 $26.601.84 69 MANHOLE, J4 1.00 EA 3.00 EA $1,372.03 $1,372.03 $4,116.09 70 CONSTRUCTION DRUM, LEAVE IN PLACE EA EA $65.75 71 BARRICADE, filA EA 13.00 EA $212.10 $2,757.30 72 ROAD CLOSURE SiGN ASSEMBLY 4,00 EA 9.00 EA $477,23 $1,908.92 $4,295.07 73 DETOUR CLOSURE SIGN ASSEMBLY EA EA $37.12 74 CONSTRUCTION SIGN, A EA 25.00 EA $132.56 $3,314.00 75 SIGN, SHEET, ENCAPSULATEDLENSWITH!. 30.36 SFT 30.36 SFT $24.85 $754.48 $754.45 76 SIGN POST. A LF LF $6.62 77 LINE, THERMOPLASTIC. BROKEN WHTTE, 4" LF LF $0,26 ! 78 LINE, THERMOPLASTIC, SOLID WHITE. 4" LF LF $0.26 ' 79 TRANSVERSE MARKINGS. THERMO. CROSS LF LF $1.41 80 LINE, THERMOPLASTIC, BROKEN YELLOW,, LF LF $0.27 . 81 LINE, THERMOPLASTIC. SOLID YELLOW, 4" LF LF $0.25 82 TRANSVERSE MARKINGS, THERMO. STOP L LF LF $2.85 ~ 83 PVMT. MESSAGE MRKNGS, THERMO., LANE EA EA $60.62 84 PVMT. MESSAGE MRKNGS, THERMO., WOR EA EA $87.57 85 SNOWPLOWABLE RAISED PAVEMENT MAR~ EA EA $28.72 86 LINE, THERMOPLASTIC, DOTTED. WHITE, 4~~ LF LF $0.62 ; 87 FIELD OFFICE, 550 SQ FT. 2.00 MOS 17.75 MOS $410.00 $620.00 $7,277.50 ' 88 MAINTAINING TRAFFIC LS 0.80 LS $30,795.00 $24,638.00 89 CONSTRUCTION ENGINEERING LS 0.80 LS $108,125.00 $86,500.00 90 MOBILIZATION &DEMOBILIZATION LS 0.70 LS $85,650.00 $59,955.00 91 MATERIAL TESTING LS 0,60 LS $27.270.00 $16,362.00 92 TRAFFIC SIGNAL, 12" RYG EA 10.00 EA $444.70 $4,447.00 i 93 TRAFFIC SIGNAL, 12" RY GA EA 4,00 EA $452.84 $I ,811.36 94 TRAFFIC SfGNAL, 12" RYG, YA, GA EA 6.00 EA $706.12 $4,245.72 i 95 PEDESTRIAN SIGNAL, INTERNATIONAL, 12" 8.00 EA 14.00 EA .$459.35 $3,674.80 $6,430.90 ~ 96 PEDESTRIAN PUSHBUTTON & SIGN 8.00 EA 14,00 EA $166.02 $1,328.16 $2,324.28 97 HANDHOLE EA 8.00 EA $858.00 $6,864.00 J 98 CONDUIT, 2" 16.00 LF 1662,00 LF $16.82 $269.12 $27,954,84 C:~carmeP, PENNSYLV~oeflrm~-p~,yest.v/o3 CITY OF CARMEL PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT ~t97-04 PROGRESS PAY ESTIMATE NO. 17 For work done during the period of: ~ 99 TRAFFIC SIGNAL POLE, 40' SIG. ARM, 15' VIE: ~ 100 TRAFFIC SIGNAL POLE, 45' SIG. ARM, 15' VIE [ 101 TRAFFIC SIGNAL POLE, 75' SIG. ARM. 25' VID } 102 TRF. SIG. POLE FOUNDATION INCLUDING RE j 103 POWER CABLE, 2C/8GA i 104 POWER CABLE, 3C/14GA 40.00 i105 POWER CABLE, 5C/14GA 120.00 F 106 POWER CABLE, 7C/14GA ! 107 POWER CABLE, 11C/14GA i 106 VIDEO CAMERA CABLE, CX · ', 109 8 PHASE CONTROLLER W/P CABINET & FOL L 110 VIDEO DETECTION SYSTEM, COMPLETE ~ 111 ELECTRIC SERVICE ~ 112 REMOVAL OF TRAFFIC SIGNAL EQUIPMENT i 113 PIPE CATCH BASIN, 12" (UNDISTRIBUTED) I 114 PIPE, PVC. SCHEDULE40, 8" (UNDISTRIBUTE ! 115 INLET. C5 !116 Manhole, C-4, Drop 117 Reset Existing CMP for Delta Drainage : 118 Pipe, Type 2, Circular, 18 IN. L 119 181N. Metal End Sec'don 1.00 i 120 Additional Sanitary Improvements i 121 Reconst~uctStruct~re87A 122 Reconstrdct Structure to Grade 123 Cost of Sl~Jcture#87B. not installed 124 Delta Light Reloca~on 125 Encase Conduit at St~ucture #124 126 Ped~staIFoundaOon, A 4.00 127 PedistalandBase, 10ft 4.00 128 HMA BASE, 25.0 mm MAINUNE, C 129 HMA BASE, 25,0 mm MAINUNE : 130 HMA iNTERMEDIATE, 19.0 mm MAINLINE 120.4~ : 131 HMA SURFACE, 9.5 mm MV, MAINLINE 1608.20 ! 132 BITUMINOUS MATERIAL FOR TACK COAT 14053.30 ~ 133 SIDEWALK, BITUMINOUS 14.24 i 134 INLETS, RELOCATE , 135 TRAFFIC SIGNAL POLE, 50' SIG, ARM, 25' VIG ! 136 TRAFFIC SIGNAL POLE, 45' SIG. ARM, 25' VIE: ~ 137 TRAFFIC SIGNAL POLE, 40' SIG. ARM, 25' 138 TRAFFIC SIGNAL POLE, 40'SIG. ARM, 20'VIG 139 TRAFFIC SIGNAL POLE. 35' SIG. ARM, 25' VID 140 TRAFFIC SIGNAL POLE, 30' SIG. ARM, 25'VIP 141 SIGNAL SUPPORT FOUNDATION, 3 FT. X 12 142 MODIFICATION TO STORM STRUCTURES 143 MISCELLANEOUS SITE WORK, MILLING/HAU 144 MANHOLE, REMOVE AND REPLACE STRUC1 145 FLOWABLE FILL 146 CORED HOLE IN MANHOLE 147 KEYSTONE RETAINING WALL 148 CEMENT CONCRETE PAVEMENT FOR DRIVE 149 STR, 133AAdditional Costs 4-19-2001 EA EA EA CY LF 210.00 LF 3634.00 LF 2532.00 LF 405.00 LF 1603.00 LF 2053.00 EA 2,00 EA 2,00 EA 2.00 LS 1.00 EA LF EA EA 1.00 EA 4.00 LF 298.00 EA 2.00 LS 1.00 LS 1.00 LF 33.99 LS 1.00 LS 1.00 LS 1.00 EA 4.00 EA 4.00 TN 5862.44 TN 17170.29 TN 6977.19 TN 1889.18 SY 81538.03 TN 297.32 LS 1.00 EA 2.00 EA 1.00 EA 2.00 EA 1.00 EA 1,00 EA 1.00 EA 8.00 LS 1.00 LS 1.00 EA 1,00 CYS 18.00 EA 1 00 SFT 776.50 SY 9804 LS 1.00 through 6-8-2001 EA $5,88482 EA $6,886.21 EA $13,073.25 CY $407.36 LF $2.66 $558.60 LF $I .92 $76.80 $6,977.28 LF $2.97 $356.40 $7,520.04 LF $2.94 $1,190,70 LF $3.32 $5,321.96 LF $2.96 $6,076.88 EA $13,676.65 $27,353.30 EA $33,259,20 $66.516.40 EA $531.25 $1,062.50 LS $2,181.94 $2.18t .94 EA $425.00 LF $11.55 EA $1,550.00 EA $3,946.00 $3,946.00 EA $400.00 $1,600.00 LF $19.00 $5,662.00 EA $236.42 $236.42 $472.84 LS $52,000.00 $52,000.00 LS $350.00 $350.00 LF $525.00 $17,844.75 LS $1,130.80 $1,130.80 LS $3,694.00 $3,694.00 LS $450.00 $450.00 EA $592.66 $2,310.64 $2,370.64 EA $617.68 $2,470,72 $2,470.72 TN $33.40 $195,805,50 TN $28,31 $486,090.91 TN $31,27 $3,7r~.47 $218,176.73 TN $35.51 $67,107.18 $67,084.78 SY $0.15 $21108.00 $12,230.70 TN $40.17 $~'/2.02 $11,943.34 LS $1,888.24 $1,888,24 EA $14.076.18 $28.152.36 EA $7,383.09 $7,383.09 EA $7,205.85 $14,411.70 EA $7,205.86 $7,205.86 EA $6,653.69 $6,653.69 EA $6.629.49 $6,629.49 EA $1,908.51 $15,268.08 LS Sl ,045,00 $1,045,00 LS $930.00 $930.00 EA $3,200.00 $3,200.00 CYS $50.00 $900.00 EA $375,00 $375.00 SFT $18.13 $14,077.95 SY $42.00 $4,117.68 LS $961.70 $961.70 3 of 4 CITY OF CARMEL PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT f/97-04 PROGRESS PAY ESTIMATE NO. 17 For work done during the period of: 150 Additional Costs For Sanitan/Sewer !reprovemet 151 STRUCTURE 224A (TIME AN[:) MATERIAL) 152 SIGN. SHEET. ENCAPSULATED LENS WITH L CONTROLLER PHASE CHANGES 155 RELOCATE UGHTING SERVICE POINT 156 LUMINAIRE, REMOVEAND RELOCATE LS LS SFT 74.50 LFT 1.00 EA 1.00 LS 1.00 LS 4-19-2001 ~rough 1.00 LS $7,755.51 1.00 LS $34,383.78 86.00 SFT $39.16 74.50 LFT $7.53 1.00 EA $420.00 1.00 LS $3,350.49 1.00 LS $3,610.00 6-8-2001 $7,765.51 $34,383.78 $3,367.76 $560.99 $560.99 $420.00 $420.00 $3,350.49 $3,350.49 $3,610.00 $3,610.00 4of4 S143,852.38 $3,256,994,23 1 of 1 CITY OF CARMEL PENNSYLVANIA STREET IMPROVEMENT PROJECT PROJECT ~97-04 PROGRESS PAY ESTIMATE NO. t7 For work done during the perrod of: 4-19-2001 ~rough 6o8-2001 TOTALS AND PAY ESTIMATE CALCULATIONS TOTAL PAY THIS ESTIMATE $t43,852.38 TOTAL PAY TO DATE $3,256,994.23 DEDUCT 10% OF 50% OF CONTRACT FOR RETAINAGE $197,669.85 DEDUCT PRE~OUS NET PAY ESTIMATES $2,915,471.99 NET PAY ESTIMATE NO. 17 $143,852.38 CrossRoad Engineers, PC Inspecting Firm Contractor con~/~o;" " Date Date Date