Loading...
HomeMy WebLinkAboutA005.0McNICHOLAS ARCHITECTS OWNERSHIP AND USE OF DOCUMENTS DRAWINGS AND SPECIFICATIONS, AS INSTRUMENTS OF PROFESSIONAL SERVICE, ARE AND SHALL REMAIN THE PROPERTY OF THE ARCHITECT. THESE DOCUMENTS ARE NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY PROJECT OR PURPOSE WHATSOEVER, WITHOUT THE PRIOR SPECIFIC WRITTEN AUTHORIZATION OF MGLM ARCHITECTS, LTD. FILE: C O P Y R I G H T 2 0 2 1 DRAWING #: DRAWING TITLE: DATE: SCALE: PROJECT #: NO. DATE ISSUE PROJECT NAME: Creek's End 4050 West 121st St. Zionsville, IN 46077 711 S. DEARBORN ST. SUITE 503 CHICAGO, ILLINOIS - 312.588.4109 - WWW.MGLMARCHITECTS.COM -------- 7700-01 NO SCALE SITE DETAILS A005 08/06/2021 01 6/11/21 PERMIT SET 02 7/27/21 CARMEL REV. 3 4 A005 EROSION BLANKET DETAILS 1 A005 STABILIZED CONSTRUCTION ENTRANCE 2 A005 SILT FENCE DETAIL 5 A005 EROSION CONTROL DETAILS 6 A005 INLET PROTECTION DETAIL 3 A005 TREE PRESERVATION DETAIL 7 A005 CONCRETE WASHOUT 03 8/06/21 CARMEL REV.2 CONCRETE WASHOUT NOTES INSTALLATION‪‬ 1. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE LOCATED A MINIMUM OF 50 FEET ‬FROM ‪ANY CREEKS, WETLANDS, DITCHES, KARST FEATURES, OR STORM DRAINS/MANMADE CONVEYANCE SYSTEMS. THE WASHOUT SHALL BE LOCATED ON A RELATIVELY FLAT AREA THAT DOES NOT RECEIVE RUNOFF FROM ADJACENT LAND, AND AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS AREAS TO PREVENT DISTURBANCE OR TRACKING.‬ 2. A SIGN SHALL BE INSTALLED ADJACENT TO THE WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. ‬ 3. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED ABOVE GRADE AS SHOWN IN DETAIL 7 ON SHEET A005. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED AND MAINTAINED IN SUFFICIENT QUANTITY AND SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS.‬ 4. PERFORM WASHOUT OF CONCRETE MIXERS, DELIVERY TRUCKS, AND OTHER DELIVERY SYSTEMS IN THE DESIGNATED AREA ONLY.‬ 5. WASH CONCRETE ONLY FROM MIXER CHUTES INTO APPROVED CONCRETE WASHOUT FACILITY. WASHOUT MAY NOT BE COLLECTED IN AN IMPERMEABLE BAG OR OTHER IMPERMEABLE CONTAINMENT DEVICES FOR DISPOSAL.‬ONCE CONCRETE WASTES ARE WASHED INTO THE DESIGNATED AREA AND ALLOWED TO HARDEN, THE CONCRETE SHALL BE BROKEN UP, REMOVED, AND DISPOSED OF PROPERLY.‬ 6. PLASTIC LINING MATERIAL SHALL BE A MINIMUM OF 10-MIL POLYETHYLENE SHEETING AND SHALL BE FREE OF HOLES, TEARS OR OTHER DEFECTS THAT COMPROMISE THE IMPERMEABILITY OF THE MATERIAL. LINER SEAMS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS’ RECOMMENDATIONS.‬ ‬ MAINTENANCE 1. INSPECT DAILY, AND AFTER EACH STORM EVENT, THE INTEGRITY OF THE OVERALL STRUCTURE INCLUDING, WHERE APPLICABLE, THE CONTAINMENT SYSTEM.‬ 2. INSPECT THE SYSTEM FOR LEAKS, SPILLS, AND TRACKING OF SOIL BY EQUIPMENT, & THE POLYETHYLENE LINING FOR FAILURE, INCLUDING TEARS AND PUNCTURES.‬ 3. ONCE CONCRETE WASTES HARDEN, REMOVE AND DISPOSE OF THE MATERIAL. EXCESS CONCRETE SHOULD BE REMOVED WHEN THE WASHOUT SYSTEM REACHES 50 PERCENT OF THE DESIGN CAPACITY. USE OF THE SYSTEM SHOULD BE DISCONTINUED UNTIL APPROPRIATE MEASURES CAN BE INITIATED TO CLEAN THE STRUCTURE. PREFABRICATED SYSTEMS SHOULD ALSO UTILIZE THIS CRITERION, UNLESS THE MANUFACTURER HAS ALTERNATE SPECIFICATIONS.‬ 4. UPON REMOVAL OF THE SOLIDS, INSPECT THE STRUCTURE. REPAIR THE STRUCTURE AS NEEDED OR CONSTRUCT A NEW SYSTEM.‬ 5. DISPOSE OF ALL CONCRETE IN A LEGAL MANNER. REUSE THE MATERIAL ON SITE, RECYCLE, OR HAUL THE MATERIAL TO AN APPROVED CONSTRUCTION/DEMOLITION LANDFILL SITE. RECYCLING OF MATERIAL IS ENCOURAGED. THE WASTE MATERIAL CAN BE USED FOR MULTIPLE APPLICATIONS INCLUDING BUT NOT LIMITED TO ROADBEDS AND BUILDING. THE AVAILABILITY FOR RECYCLING SHOULD BE CHECKED LOCALLY.‬ 6. THE PLASTIC LINER SHOULD BE REPLACED AFTER EVERY CLEANING; THE REMOVAL OF MATERIAL WILL USUALLY DAMAGE THE LINING. THE CONCRETE WASHOUT SYSTEM SHOULD BE REPAIRED OR ENLARGED AS NECESSARY TO MAINTAIN CAPACITY FOR CONCRETE WASTE.‬ 7. CONCRETE WASHOUT SYSTEMS ARE DESIGNED TO PROMOTE EVAPORATION. HOWEVER, IF THE LIQUIDS DO NOT EVAPORATE AND THE SYSTEM IS NEAR CAPACITY IT MAY BE NECESSARY TO VACUUM OR REMOVE THE LIQUIDS AND UTILIZE A SECONDARY CONTAINMENT SYSTEM OR BASIN FOR FURTHER DEWATERING. ‬ 8. INSPECT CONSTRUCTION ACTIVITIES ON A REGULAR BASIS TO ENSURE SUPPLIERS, CONTRACTORS, AND OTHERS ARE UTILIZING DESIGNATED WASHOUT AREAS. IF CONCRETE WASTE IS BEING DISPOSED OF IMPROPERLY, IDENTIFY THE VIOLATORS AND TAKE APPROPRIATE ACTION.‬ 9. WHEN CONCRETE WASHOUT SYSTEMS ARE NO LONGER REQUIRED, THE CONCRETE WASHOUT SYSTEMS SHALL BE CLOSED. DISPOSE OF ALL HARDENED CONCRETE AND OTHER MATERIALS USED TO CONSTRUCT THE SYSTEM.‬ 10. HOLES, DEPRESSIONS AND OTHER LAND DISTURBANCES ASSOCIATED WITH THE SYSTEM SHOULD BE BACKFILLED, GRADED, AND STABILIZED.‬ 08/25/21