Loading...
HomeMy WebLinkAboutGN010.0TENANT/CLIENT REPRESENTATIVE SIGNATURE DATETENANT/CLIENT REPRESENTATIVE NAME PRINTED THE TENANT/CLIENT AGREES THAT THESE DRAWINGS AND SPECIFICATIONS REPRESENT THE ENTIRE SCOPE OF WORK FOR THE IMPROVEMENTS TO BE PROVIDED. THE TENANT/CLIENT'S SIGNATURE BELOW REPRESENTS ACCEPTANCE OF THE FINAL DESIGN. ANY CHANGES TO THIS SCOPE OF WORK INITIATED BY THE TENANT/CLIENT WILL CAUSE CHANGES IN THE TOTAL COST TO THE TENANT/CLIENT AND IN THE COMPLETION DATE FOR THE PROJECT. APPROVAL FOR CONSTRUCTION DRAWING INDEX PROJECT TEAM INTERIOR DESIGNER PARALLEL DESIGN GROUP 8940 RIVER CROSSING BLVD. SUITE 150 INDIANAPOLIS, IN 46240 KAITLYN BARRETT 317.721.4399 kaitlyn@paralleldg.com PROJECT INFORMATION ARCHITECT DESIGNPOINT INC. GEORGE SMALL 4676 ST. JOHN CIR. ZIONSVILLE, IN 46077 PH 317.289.8007 gsmall@designpointarchitects.com 1. EACH CONTRACTOR SHALL BECOME COMPLETELY FAMILIAR WITH ALL ASPECTS OF THE WORK, EVEN THOSE AREAS DESIGNATED TO BE PROVIDED BY OTHERS. THIS FAMILIARIZATION INCLUDES FULL AND COMPLETE UNDERSTANDING OF THE WORK DESCRIBED ON ALL SHEETS OF THE DRAWINGS. FAILURE BY THE CONTRACTOR TO BECOME COMPLETELY FAMILIAR OF ALL ASPECTS OF THE WORK SHALL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO PROVIDE MATERIALS ASSEMBLIES, OR SERVICES INDICATED IN THE CONTRACT DOCUMENTS. 2. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF ALL APPLICABLE STATE AND LOCAL BUILDING CODES. CONTRACTORS ARE RESPONSIBLE FOR VERIFYING THE CURRENT APPLICABLE BUILDING CODE(S) FOR THEIR RESPECTIVE SCOPE OF WORK. ALWAYS ABIDE BY THE MOST RESTRICTIVE CODE. 3. FIELD VERIFY ALL EXISTING CONDITIONS AND MEASUREMENTS INDICATED ON THE DRAWINGS AND REPORT ANY DISCREPANCY THROUGH THE GENERAL CONTRACTOR TO PARALLEL DESIGN GROUP BEFORE BEGINNING ANY CONSTRUCTION. 4. THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE OWNER REGARDING ALL ON-SITE ACTIVITIES; SUCH AS, BUT NOT LIMITED TO, WORK SCHEDULE, MATERIALS STORAGE AND HANDLING, DELIVERIES, ACCESS TO THE WORKSITE, TRAFFIC CONTROL, AND BUILDING/PUBLIC SAFETY PROCEDURES DURING CONSTRUCTION. THE CONTRACTOR SHALL ALSO COORDINATE WORK "BY OTHERS" WITH HIS/HER OWN ACTIVITIES AS NECESSARY TO EXECUTE THE OVERALL PROJECT SCOPE. 5. GENERAL CONTRACTOR TO REVIEW DOCUMENTS IN DETAIL AND COMMUNICATE ANY ITEMS THAT MAY REQUIRE LEAD TIMES. CONTRACTOR TO COORDINATE PROJECT SCHEDULE ACCORDINGLY AND COMMUNICATE TO TEAM ANY DECISIONS THAT NEED TO BE MADE TO KEEP PROJECT SCHEDULE ON TRACK. CONTRACTOR IS RESPONSIBLE FOR DELAYS WHEN LEAD TIMES ARE NOT PROPERLY COMMUNICATED TO OWNER AND PARALLEL DESIGN GROUP. 6. NO SUBSTITUTIONS FOR SPECIFICALLY NAMED PRODUCTS/MATERIALS WILL BE ALLOWED WITHOUT PRIOR APPROVAL FROM PARALLEL DESIGN GROUP. PRODUCT CHANGE SUBMITTALS SHOULD BE COMMUNICATED TO PARALLEL DESIGN GROUP ALLOWING ADEQUATE TIME TO RESPOND. 7. CONTACT THE DESIGNER IMMEDIATELY IF, IN THE FIELD, CONFLICTS ARE DISCOVERED BETWEEN COMPONENTS OF DIFFERENT SYSTEMS THAT PREVENT THE INSTALLATION OF THOSE COMPONENTS AS INDICATED ON THE DRAWINGS. (I.E. WHERE EXISTING MECHANICAL DUCTWORK MAY PREVENT THE INSTALLATION OF LIGHTING FIXTURES AS INDICATED ON THE CEILING PLAN). 8. SHOP DRAWINGS OR CATALOG CUTS MUST BE SUBMITTED TO PARALLEL DESIGN GROUP FOR APPROVAL ON ALL MATERIALS/PRODUCTS IF THE DRAWINGS DO NOT INDICATE A SPECIFIC MANUFACTURER OR MODEL NUMBER. 9. PROVIDE SUBMITTAL SHOP DRAWINGS IN A TIMELY FASHION TO ALLOW SUFFICIENT TIME FOR CHECKING, APPROVAL, ORDERING, FABRICATION, AND DELIVERY OF MATERIALS AND EQUIPMENT. 10. ALL MATERIAL AND EQUIPMENT OF INDUSTRY STANDARD QUALITY SPECIFIED OR NOT, AND WITH THE LIMITATION OF THE CONTRACT DOCUMENTS TO CAUSE THE INSTALLATION TO FUNCTION IN ACCORDANCE WITH THE INTENTION AND OBJECTIVE OF THE FINISHED PROJECT. 11. EACH CONTRACTOR SHALL FULLY REVIEW DRAWING SHEETS TO FULLY UNDERSTAND NEW WORK AND EXISTING CONDITIONS TO DETERMINE FULL EXTENT OF RESPONSIBILITIES FOR EACH RESPECTIVE TRADE IN ADDITION TO COORDINATING FULL EXTENT OF RESPONSIBILITIES WITH ALL OTHER TRADES. FIELD WORK ORDERS & CHANGE ORDERS WILL NOT BE APPROVED FOR ANY CONDITIONS OR CONFLICTS THAT COULD HAVE BEEN ACCOUNTED FOR BY THE BIDDER DURING PRE-BID FIELD INSPECTION AND AFTER AWARD OF CONTRACT. 12. THE GENERAL CONTRACTOR IS REQUIRED TO PATCH AND REPAIR ANY DAMAGED EXISTING SURFACE TO MATCH NEW. 13. WHEN REQUIRED BY STATE BUILDING CODE, THE CONTRACTOR(S) SHALL PROVIDE DESIGN/BUILD DRAWINGS FOR MECHANICAL, PLUMBING, ELECTRICAL, OR FIRE SUPPRESSION. DRAWINGS SHALL BE CERTIFIED BY A LICENSED ENGINEER AND SUBMITTED BY THE CONTRACTOR FOR STATE DESIGN REVIEW. 14. ALL EQUIPMENT, MATERIALS AND/OR FIXTURES SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS OR INSTRUCTIONS. 15. EXECUTE A THOROUGH FINAL CLEAN AND INSPECTION OF THE SPACE UPON COMPLETION OF THE PROJECT. ALL SURFACES, FIXTURES, AND EQUIPMENT SHALL BE CLEAN, AND THE SPACE SHALL BE TURNED OVER TO THE OWNER IN A CONDITION THAT REPRESENTS THE HIGHEST LEVEL OF CARE AND PROFESSIONALISM. ENSURE ALL GENERAL CONTRACTOR INSTALLED APPLIANCES WORK & DO NOT LEAK. 16. PROVIDE TO THE OWNER ALL OPERATION AND/OR MAINTENANCE MANUALS, OR INSTRUCTIONS FOR ALL EQUIPMENT AND SYSTEMS AT THE COMPLETION OF THE PROJECT. 17. DO NOT SCALE DRAWINGS. DIMENSIONS GOVERN. ALL DIMENSIONS ARE FROM FINISHED FACE OF WALL TO FINISHED FACE OF WALL. 18. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE REQUIREMENTS REGARDING LOCAL PLAN REVIEW, PERMITS, INSPECTIONS, AND FEES. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING ALL REQUIRED DRAWINGS AND SUPPORTING DOCUMENTS TO THE LOCAL BUILDING OFFICIAL AND/OR PERMIT DEPARTMENT. ALL REQUIRED LOCAL PERMIT FEES SHALL BE PAID BY THE GENERAL CONTRACTOR UNLESS STIPULATED OTHERWISE IN THE OWNER/CONTRACTOR AGREEMENT. 19. NOTE REGARDING PROJECTS WITHIN MARION COUNTY: LOCAL ORDINANCE REQUIRES ONE SET OF CONSTRUCTION DRAWINGS FOR CLASS 1 STRUCTURES, THAT ARE DESIGNED WITH A FIRE PROTECTION AND LIFE SAFETY SYSTEMS (I.E. FIRE ALARMS), BE SUBMITTED TO THE INDIANAPOLIS FIRE DEPARTMENT (IFD) FOR THE PURPOSE OF CONDUCTING A FIRE DEPARTMENT PLAN REVIEW AND ON-SITE INSPECTIONS. DRAWING SET SHOULD INCLUDE ARCH, STRUCT, MECH, ELEC, SPRINKLER, FIRE ALARM, AND SITE/CIVIL (WHERE APPLICABLE). DRAWINGS MAY BE DELIVERED OR MAILED TO THE IFD PLAN REVIEW DIVISION (1200 MADISON AVENUE, INDIANAPOLIS, IN 46225, ATTENTION: T.J. BURNS). INCLUDE THE DMD STRUCTURAL PERMIT NUMBER (STR-XXXXXX) WITH THE DRAWING SET. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE SUBMISSION OF THESE DRAWINGS AND THE REQUIRED FEE TO THE IFD PLAN REVIEW DIVISION. CONTACT THE IFD WITH QUESTIONS REGARDING THIS REQUIREMENT (317-327-5529). GENERAL PROJECT NOTES DEMOLITION NOTES 1. ALL EXISTING EQUIPMENT, FIXTURES, ETC. SHALL REMAIN PROPERTY OF THE OWNER. ALL REUSABLE ITEMS SALVAGED DURING DEMOLITION SHALL BE RETAINED FOR THE OWNER'S INSPECTION. ONLY ITEMS SO INSPECTED AND REJECTED BY THE OWNER SHALL BE DISPOSED. 2. CONTRACTOR TO VISIT SITE TO BECOME FAMILIAR WITH EXISTING CONDITIONS. DEMOLITION DRAWINGS ARE A REFERENCE TO AID CONTRACTOR IN EVALUATION OF THE EXTENT OF THE DEMOLITION, BUT SHALL NOT BE CONSIDERED ALL INCLUSIVE. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, ETC. REFERENCE NEW CONSTRUCTION DRAWINGS TO DETERMINE THE FULL EXTENT OF NECESSARY DEMOLITION. 3. NO STRUCTURAL OR LOAD-BEARING CONSTRUCTION SHALL BE REMOVED, DEMOLISHED, OR DAMAGED AS A RESULT OF THIS PROJECT UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS. THE CONTRACTOR SHALL VERIFY IN THE FIELD, PRIOR TO DEMOLITION, THAT ALL ITEMS NOTED TO BE DEMOLISHED ARE NOT STRUCTURAL. CONTACT PARALLEL DESIGN GROUP IMMEDIATELY IF THE CONTRACTOR(S) IN THE FIELD SUSPECT THAT AN ITEM NOTED FOR DEMOLITION APPEARS TO BE STRUCTURAL OR OTHERWISE LOAD-BEARING. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR INADVERTENT DAMAGE TO THE BUILDING STRUCTURAL SYSTEM. 4. EACH TRADE CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION WORK REQUIRED OR NOTED FOR THE INSTALLATION OF THE NEW WORK. 5. EACH TRADE CONTRACTOR IS RESPONSIBLE TO REFER TO NEW CONSTRUCTION DRAWINGS FOR ADDITIONAL PATCHING AND PREPARATION WORK RELATED TO THE DEMOLITION ITEMS. 6. WHERE EQUIPMENT, FIXTURES, OR FINISHES ARE MOVED FROM ANY OTHER PART OF THE BUILDING TO BE REUSED IN THE PROJECT AREA, THE CONTRACTOR SHALL INCLUDE IN THEIR SCOPE OF WORK ANY NECESSARY PATCHING OR REPAIRING OF THE REMAINING AREAS FROM WHERE THE ITEMS WERE RELOCATED, UNLESS OTHERWISE DIRECTED BY OWNER. 7. CHECK EXISTING FLOOR LEVEL BEFORE INSTALLATION OF NEW FLOORING. PREPARE FLOOR WITH CEMENTITIOUS LEVELING COMPOUND PRIOR TO INSTALLATION OF NEW FLOOR FINISH AS REQUIRED TO MAINTAIN LEVEL. 8. REMOVE ALL ITEMS ASSOCIATED WITH DEMOLISHED WALL IF NOT NOTED OR SHOWN OTHERWISE. SALVAGE ANY ITEMS IS GOOD CONDITION FOR REUSE IN NEW CONSTRUCTION, e.g., OUTLETS. 9. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING SURFACES, MATERIALS, COMPONENTS, ETC. TO REMAIN OR BE RELOCATED. ANY DAMAGE TO THESE RESULTING FROM PERFORMANCE OF WORK SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE OWNER AND PARALLEL DESIGN GROUP AT NO ADDITIONAL EXPENSE TO THE OWNER. 10. COMPLY WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS. ALWAYS ABIDE BY THE MOST RESTRICTIVE CODE. 11. THE CONTRACTOR SHALL PROVIDE TEMPORARY DUST PROTECTION AS REQUIRED BY THE OWNER TO PREVENT CONSTRUCTION DEBRIS AND DUST FROM MIGRATING OUT OF THE PROJECT AREA. THE OWNER SHALL CONFIRM ALL DUST PREVENTION MEASURE/LOCATIONS, AND SHALL DETERMINE ANY CHANGES TO THESE MEASURES. 12. REMOVE DUST AND DEBRIS FROM NEWLY EXPOSED SURFACES. 13. CONTRACTOR TO PROVIDE AN "AS-BUILT" SET INDICATING THE LOCATION OF ALL PERMANENTLY ABANDONED SYSTEMS. 14. GENERAL CONTRACTOR TO PROVIDE RECYCLING COSTS TO THE BUILDING OWNER/LANDLORD ON ALL ITEMS BEING DEMOLISHED, SUCH AS, METAL STUDS, DRYWALL, CARPET, CEILING TILES, DOORS,GLASS, AND CABINETRY. 1. POWER AND COMMUNICATION PLAN IS TO SHOW ELECTRICAL, VOICE/DATA RECEPTACLES AND TV LOCATIONS. ELECTRICAL CONTRACTOR TO FIELD VERIFY LOAD CAPACITIES AND AVAILABILITY. PARALLEL DESIGN GROUP AND THEIR ARCHITECT ARE NOT RESPONSIBLE FOR ANY MECHANICAL OR ELECTRICAL ENGINEERING. 2. REFLECTED CEILING PLAN IS TO SHOW LIGHT FIXTURE, DIFFUSER, AND SWITCH LOCATIONS ONLY. PARALLEL DESIGN GROUP AND THEIR ARCHITECT ARE NOT RESPONSIBLE FOR ANY MECHANICAL OR ELECTRICAL ENGINEERING. 3. ELECTRICAL CONTRACTOR RESPONSIBLE FOR RELOCATION AND/OR ADDITION OF HORN STROBES, FIRE ALARM STATIONS AND EXIST SIGNS AS REQUIRED BY CODE. 4. VERIFY IF ANY SPECIAL EQUIPMENT WILL REQUIRE ADDITIONAL AIR FLOW. PROVIDE ADDITIONAL HVAC REQUIREMENTS AFTER APPROVAL FROM TENANT. REVISE ZONING AS NEEDED. 5. PLUMBING, FIRE SUPPRESSION, AND FIRE ALARM SYSTEMS SHALL BE DESIGNED AND INSTALLED BY THE RESPECTIVE DESIGN/BUILD CONTRACTORS PER AGREEMENT WITH THE OWNER. ALL TRADES SHALL DESIGN AND INSTALL THEIR RESPECTIVE SYSTEMS IN ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL BUILDING CODES. COORDINATE WITH THE ARCHITECT IF ADDITIONAL INFORMATION IS REQUIRED IN ORDER TO DO THE WORK IN THE FIELD. PARALLEL DESIGN GROUP AND THEIR ARCHITECT ARE NOT RESPONSIBLE FOR ANY ENGINEERING FOR THESE SYSTEMS. 6. COORDINATE CIRCUITRY REQUIREMENTS FOR FURNITURE SYSTEMS WITH TENANT, BEFORE RUNNING WIRING TO JUNCTION BOXES. 7. CENTER IN CEILING TILES RECESSED DOWNLIGHTS, SMOKE DETECTORS, SPRINKLER HEADS, AND EXIT SIGNS, UNLESS OTHERWISE NOTED. 8. REVIEW FIRE DETECTION DEVICE LOCATIONS WITH TENANT PRIOR TO INSTALLATION. 9. THE DESIGN/BUILD CONTRACTOR SHALL COMPLY WITH THE INDIANA BUILDING CODE, THE INDIANA FIRE CODE, AND ALL OTHER APPLICABLE LAWS, CODES, RULES AND REGULATIONS THAT APPLY TO DESIGN AND INSTALLATION OF FIRE SPRINKLER/FIRE SUPPRESSION SYSTEMS. MECHANICAL & ELECTRICAL NOTES FIRE PROTECTION NOTES 1. FIRE PROTECTION WORK IS TO BE PROVIDED BY DESIGN/BUILD SERVICES UNDER THE GENERAL CONTRACT. PROVIDE A COMPLETE, WORKING SYSTEM. PARALLEL DESIGN GROUP IS NOT RESPONSIBLE FOR THE DESIGN, INSTALLATION, OR RENOVATION OF THE FIRE SPRINKLER SYSTEM. 2. THE DESIGN/BUILD CONTRACTOR SHALL COMPLY WITH THE INDIANA BUILDING CODE, THE INDIANA FIRE CODE, AND ALL OTHER APPLICABLE LAWS, CODES, RULES AND REGULATIONS THAT APPLY TO DESIGN AND INSTALLATION OF FIRE SPRINKLER/FIRE SUPPRESSION SYSTEMS. 3. THE FIRE PROTECTION CONTRACTOR SHALL GENERATE ALL REQUIRED DRAWINGS, AND SHALL FILE THOSE DRAWINGS, AND RELATED DOCUMENTS, WITH THE STATE AND LOCAL AUTHORITIES HAVING JURISDICTION OVER THE PROJECT. 4. PROVIDE NEW OR RELOCATE EXISTING SPRINKLER HEADS AS REQUIRED. PROVIDE MISSING COVER/ESCUTCHEON PLATES FOR SPRINKLER HEADS WHERE APPLICABLE. FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE START OF WORK. 5. FIRE EXTINGUISHERS: CONTRACTOR TO ENSURE ALL NEW AND EXISTING FIRE EXTINGUISHERS ARE INSTALLED ACCORDING TO NFPA 10. COORDINATE WITH OWNER/LANDLORD ON EXTINGUISHER TYPE AND HOUSING. MAXIMUM TRAVEL DISTANCE OF 75 FEET FROM ANY POINT TO A VISIBLE EXTINGUISHER. 1. ALL MATERIALS TO BE DELIVERED IN THEIR ORIGINAL PACKAGING WITH MANUFACTURER'S LABELS. CONTRACTOR WILL BE RESPONSIBLE FOR RECEIVING, STORING AND PROTECTING MATERIALS FROM ANY DAMAGE BY MOISTURE, WIND, SUN ABUSE, OR ANY HARMFUL EFFECTS. DAMAGED MATERIALS WILL BE REJECTED AND MUST BE REPLACED BY THE CONTRACTOR. 2. REMOVE ALL PLATES AND SWITCHES BEFORE PAINTING AND REATTACH AFTERWARDS. 3. ALL REMAINING PAINT (1 GALLON MINIMUM) TO BE LEFT WITH THE OWNER. 4. WALLCOVERING SHALL BE FROM THE SAME PRODUCTION RUN. 5. DO NOT LOCATE WALLCOVERING SEAMS ON CORNERS. WRAP 6" BEYOND INSIDE OR OUTSIDE CORNERS AS INDICATED ON THE FINISH PLAN WHERE CHANGE OF WALLCOVERING LOCATION OCCURS. 6. CONTRACTOR TO REMOVE EXCESS ADHESIVE IMMEDIATELY FROM SURFACE OR WALLCOVERING AS EACH JOINT OR SEAM IS MADE AND BEFORE PROCEEDING TO THE NEXT JOINT OR SEAM. 7. ALL WALLCOVERING SEAMS ARE TO BE CUT STRAIGHT. ASSURE INSTALLATION IS SECURE, SMOOTH, CLEAN, AND WITHOUT WRINKLES, BUBBLES, GAPS, AND/OR OVERLAPS. 8. FOR ALL NEW DRYWALL INSTALLATIONS, INSTALL AS RECOMMENDED BY THE GYPSUM ASSOCIATION. (SUCH AS, CONTROL JOINTS, FINISH LEVELS, FASTENERS, TAPING DETAILS, CORNER BEADS, ETC.) 9. TRANSITION OF DIFFERENT FLOORING MATERIALS SHALL OCCUR AT THE CENTERLINE OF THE DOOR. 10. CONTRACTOR TO PROVIDE AND INSTALL TRANSITION STRIP BETWEEN DISSIMILAR FLOORING MATERIALS. TRANSITION STRIP IS TO BE SCHLUTER OR EQUAL WITH BRUSHED ALUMINUM FINISH OR IS TO BE VINYL AND MATCH VINYL BASE COLOR (e.g. WHERE VCT MEETS CARPET). CONTRACTOR TO DETERMINE TYPE OF SCHLUTER STRIP BASED ON DISSIMILAR FLOORING MATERIALS. CONTRACTOR TO VERIFY TYPE OF TRANSITION WITH PARALLEL DESIGN, IF NOT NOTED, PRIOR TO PLACING ORDER. 11. SUBFLOOR MUST BE LEVEL, SOUND, RIGID, CLEAN/FREE OF ANY DEBRIS, AND PERMANENTLY DRY PRIOR TO INSTALLATION. THE INSTALLATION OF FINISH FLOORING MATERIALS SHALL SERVE AS ACCEPTANCE OF SLAB CONDITION. 12. FLOORING MATERIALS SHALL BE FROM THE SAME PRODUCTION RUN. 13. CONTRACTOR SHALL REPAIR, REFINISH OR TOUCH-UP SURFACES DAMAGED BY SUBSEQUENT WORK. (EXAMPLE: WHERE NEW OUTLETS/FIXTURES HAVE BEEN INSTALLED) 14. LOW VOC CONTENT PAINT AND ADHESIVES TO BE USED THROUGHOUT PROJECT. 15. REVIEW AND ABIDE BY ALL MANUFACTURER INSTALLATION INSTRUCTIONS PRIOR TO INSTALLATION OF FINISH MATERIALS. MANUFACTURER RECOMMENDED ADHESIVES/SEALANTS TO BE USED. 16. UPON COMPLETION OF ALL FINISH APPLICATIONS, ALL MATERIALS AND EQUIPMENT SHALL BE REMOVED. CONTRACTOR SHALL INSURE THAT ALL AREAS ARE LEFT CLEAN AND DAMAGE FREE. 17. ANY VARIATION IN PATTERN, TEXTURE, COLOR OR ANY OTHER DEFECT SHOULD BE BROUGHT TO THE ATTENTION OF PARALLEL DESIGN GROUP FOR DIRECTION AND APPROVAL. FINISH NOTES 10. PROVIDE NEW OR RELOCATE EXISTING SPRINKLER HEADS AS REQUIRED. PROVIDE MISSING COVER/ESCUTCHEON PLATES FOR SPRINKLER HEADS WHERE APPLICABLE. FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE START OF WORK. 11. THE FIRE PROTECTION CONTRACTOR SHALL GENERATE ALL REQUIRED DRAWINGS. AND SHALL FILE THOSE DRAWINGS, AND RELATED DOCUMENTS, WITH THE STATE AND LOCAL AUTHORITIES HAVING JURISDICTION OVER THE PROJECT. MECHANICAL & ELECTRICAL NOTES CONTINUED [PROJECT NUMBER][DATE][DRAWN BY][CHECKED BY]ALL DESIGNS, CONCEPTS, ARRANGEMENTS AND PLANS INDICATED OR REPRESENTED BY THESE DRAWINGS ARE OWNED BY PARALLEL DESIGN GROUP, INC. AND SHALL NOT BE USED BY OR DISCLOSED TO ANY PERSON, FIRM OR CORP. FOR ANY REASON WHATSOEVER WITHOUT THE WRITTEN CONSENT OF PARALLEL DESIGN GROUP INC. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS ON THE JOB SITE. PARALLEL DESIGN GROUP INC. MUST BE NOTIFIED OF ANY DISCREPANCIES OR VARIATIONS FROM THE DIMENSIONS SHOWN ON THE PLAN. N [ P ][ W ]Indianapolis, IN 46240ParallelDG.com317.721.4399 8940 River Crossing Blvd. Ste 1502021.16204.15.21SFKBELEMENT THREEMIDTOWN EAST -1ST FLOOR571 MONON BLVD, CARMEL, INDIANA 46032A000 COVER SHEET A000 COVER SHEET A001 LIFE SAFETY PLAN A003 ACCESSIBILITY D101 DEMOLITION PLAN A100 WALL TYPES A101 FLOOR PLAN A101D DIMENSION PLAN A110 DOOR SCHEDULE & INTERIOR ELEVATIONS A201 REFLECTED CEILING PLAN A301 POWER AND DATA PLAN A401 FINISH PLAN VICINITY MAP KEY PLAN TOTAL BUILDING AREA: 76,084 SF PROJECT TYPE: REMODEL CONSTRUCTION TYPE: II-B TOTAL AREA ON FLOOR: 19,021 SF ELEMENT THREE OCCUPANCY: (B)USINESS USABLE AREA: 5,657 SF REVISION SCHEDULEMARK DATE DESCRIPTION07/26/21