Loading...
HomeMy WebLinkAboutCarmel Comment Response Letter 24-Aug-2021Page 1 of 2    William A. Cash  212 Redwood Circle  Noblesville, IN 46062  317‐490‐4036  wacash71@gmail.com    August 24, 2021    Mr. Alex Jordan  City of Carmel Engineering Office  1 Civic Square  Carmel, IN 46032  RE:  Jim Thomas Property  Residential Drainage Review   241 1st Ave Southeast   Carmel, IN 46032    Dear Mr. Jordan,  The following responses refer to the markup set of plans provided August 20th, 2021.  The  comments are listed in the order found on the markup pdf documents.  Technical Report  1) The release rate for the 10 year storm will need reduced.  The remaining storm sewer  piping including the downspout collector lines and swale basin line were added to the  model to increase the available model storage.  The added storage resulted in a  decreased peak flow rate.  Stormwater BMP O&M  1) Detail for the sump/hood structure “skirt”. This oversight/terminology was corrected in  the O&M.  This particular hood structure does not include a “bio‐skirt” accessory.  The  intent of the sump and hood structure concerns reducing sediment and floating debris  only.  2) Label BMP easements on the site map.  The BMP map now includes the appropriate  easement labeling.  3) Include swale drainage structure on Underground Detention System schematic.  The  schematic now includes the swale structure.  Page 2 of 2    4) Details for the Underground Detention System.  The specified system is a custom  system including simple corrugate HDPE components including piping, tee fittings and  end caps.  An enlarged view was added to sheet C3 to aid in construction of the  system.      Should you have any questions or required additional information please let me know.    Sincerely,