HomeMy WebLinkAbout241 1st Ave Tech Report 20-Jul-2021Technical Information Report
Jim Thomas Residence
Single Family Residential Construction
241 1st Ave Southeast
Carmel, IN 46033
23‐Aug‐2021
Prepared For:
Jim Thomas
4918 Deer Ridge Drive
Carmel, IN 46033
Prepared By:
William A. Cash
212 Redwood Circle
Noblesville, IN 46062
Table of Contents
I. Coversheet
II. Narrative
a. Existing Conditions
b. Developed Conditions
c. Summary
III. Technical Design
a. Site Location Map
b. Existing Basin Map
c. Overall Combined Lot Area Summary
d. Soils Map
e. Pre & Post CN Data Charts
f. Rainfall Data
g. Detention Model Schematic
h. Stage Storage Graph
i. 10 Yr Peak Runoff Graph
j. 100 Yr Peak Runoff Graph
k. Storage Volume vs. Time Graph
l. 10 Yr Design Model Input/Output
m. 100 Yr Design Model Input/Output
Project Narrative
Existing Conditions
The property owner plans to replat and combine the 241 1st Ave parcel with the parcel
immediately north for a combined total 0.399 acre parcel. Previously the parcels contained
approximately 14% impervious surface which consisted of a house and garage. Both structures
were removed in anticipation of the new project. For the purpose of this report the existing
condition CN for the HSG B soils was taken from the provided Urban Development CN table as
defined for a typical 0.25 ac residential lot development. Drainage generally sheet flows from
the northeast to southwest. Drainage crossing the south boundary enters onto the existing
stone alley and then flows west towards 1st Avenue. The combined parcel area was divided into
two drainage basins consisting of a North Basin and a South Basin. The development is limited
to the South Basin therefore the presented calculations pertain to this 0.260 acre area.
Proposed Conditions
The onsite improvements consist of a new 5,719 sf home, driveway and stormwater
improvements. The offsite improvements consist of the conversion of the stone alley to
asphalt pavement. To address the additional runoff from the larger home the owner plans to
install a total 210 linear feet of perforated 12” underground detention piping. The perforated
HDPE pipe will drain to a stone envelop consisting of approximately 40% void space. The
system will provide an approximate 550 cubic feet of storage and function to attenuate the 10
yr and 100 year developed storm peak runoff rates. The provided calculation confirms the that
the proposed development should not generate peak discharges which would exceed the
existing rates. The following table outlines the pre and post release rates.
Return Time Existing Qp Post Undetained Qp Post Detained Qp
10 Year 0.43 0.66 0.41
100 Year 1.05 1.39 0.77
Summary
The residential project will involve stormwater improvements including underground
detention, sumped/hooded drainage basins, and an offsite infiltration trench. All drainage from
the new roof will drain directly to the underground detention system. A smaller diameter
discharge line from the detention system directs the flow to the south and discharges to the
alley. The paved alley drains west to 1st Avenue. The detention system attenuates the 10 Yr
and 100 Year peak flow to rates to the existing conditions comparable to a 0.25 Acre residential
lot development.
Site Location Map
Project Site
Parcel
Consolidation
GRAVEL GRAVEL850 85185084984884784684 5844843842850
849
848
84
7
846
845
844
84
3843
842
841
840 846851
844843842843844
841 849848847846845844843SCALE: 1" = 60'
PROJECT
LOCATION
CARMEL VIEW
RESIDENTIAL
DEVELOPMENT
EXISTING OFFSITE
BASIN MAP
DATE: 14-JUL-211ST AVENUECARMEL VIEW DR.
Area Summary 241 1st Ave
Carmel, IN 46033
Existing Conditions Area [sf]
Total Area 17,388
House 1,850
Garage 665
Turf 14,873
% Coverage 14%
Proposed Conditions Area [sf]
Total Area 17,388
House 5,719
Driveway 580
Walk 140
Turf 10,949
% Coverage 37%
Soil Map—Hamilton County, Indiana
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/18/2021
Page 1 of 34425420 4425430 4425440 4425450 4425460 4425470 4425480 4425490 4425500 44255104425430 4425440 4425450 4425460 4425470 4425480 4425490 4425500 4425510574650 574660 574670 574680 574690 574700 574710
574650 574660 574670 574680 574690 574700 574710
39° 58' 35'' N 86° 7' 33'' W39° 58' 35'' N86° 7' 30'' W39° 58' 32'' N 86° 7' 33'' W39° 58' 32'' N
86° 7' 30'' W N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 20 40 80 120
Feet
0 5 10 20 30
Meters
Map Scale: 1:452 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:15,800.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Hamilton County, Indiana
Survey Area Data: Version 21, Jun 4, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Aug 1, 2018—Sep
30, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Soil Map—Hamilton County, Indiana
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/18/2021
Page 2 of 3
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
YmsB2 Miami silt loam-Urban land
complex, 2 to 6 percent
slopes, eroded
0.9 100.0%
Totals for Area of Interest 0.9 100.0%
Soil Map—Hamilton County, Indiana
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/18/2021
Page 3 of 3
Undeveloped Land Curve Numbers
Urban CN Table
Page 10 of 120
NRCS HSG Table
Urban CN Table
200-6
TABLE 201-2: Rainfall Intensities for Various Return Periods and Storm Durations
Rainfall Intensity (Inches/Hour)
Return Period (Years)Duration
2 5 10 25 50 100
5 Min. 4.63 5.43 6.12 7.17 8.09 9.12
10 Min. 3.95 4.63 5.22 6.12 6.90 7.78
15 Min. 3.44 4.03 4.55 5.33 6.01 6.77
20 Min. 3.04 3.56 4.02 4.71 5.31 5.99
30 Min. 2.46 2.88 3.25 3.81 4.29 4.84
40 Min. 2.05 2.41 2.71 3.18 3.59 4.05
50 Min. 1.76 2.06 2.33 2.73 3.07 3.47
1 Hr. 1.54 1.80 2.03 2.38 2.68 3.03
1.5 Hrs. 1.07 1.23 1.42 1.63 1.91 2.24
2 Hrs. 0.83 0.95 1.11 1.37 1.60 1.87
3 Hrs. 0.59 0.72 0.84 1.04 1.22 1.42
4 Hrs. 0.47 0.58 0.68 0.84 0.99 1.15
5 Hrs. 0.40 0.49 0.58 0.71 0.83 0.97
6 Hrs. 0.35 0.43 0.50 0.62 0.72 0.85
7 Hrs. 0.31 0.38 0.44 0.55 0.64 0.75
8 Hrs. 0.28 0.34 0.40 0.49 0.57 0.67
9 Hrs. 0.25 0.31 0.36 0.45 0.52 0.61
10 Hrs. 0.23 0.28 0.33 0.41 0.48 0.56
12 Hrs. 0.20 0.24 0.29 0.35 0.41 0.48
14 Hrs. 0.17 0.22 0.25 0.31 0.36 0.42
16 Hrs. 0.16 0.19 0.23 0.28 0.32 0.38
18 Hrs. 0.14 0.17 0.20 0.25 0.29 0.34
20 Hrs. 0.13 0.16 0.19 0.23 0.27 0.31
24 Hrs. 0.11 0.14 0.16 0.20 0.23 0.27
Source: Purdue,A.M., et. al., "Statistical Characteristics of Short Time Incremental Rainfall",
Aug., 1992. (Values in this table are based on IDF equation and coefficients provided for
Indianapolis, IN.)
TABLE 201-3: Rainfall Depths for Various Return Periods
Page 11 of 120
Exh. D
Rainfall Depth (Inches)
Return Period (Years)Duration
2 5 10 25 50 100
24 Hrs. 2.66 3.27 3.83 4.72 5.52 6.46
Source: Purdue,A.M., et. al., "Statistical Characteristics of Short Time Incremental
Rainfall", Aug., 1992.(Values in this table are based on IDF equation and coefficients
provided for Indianapolis, IN.)
TABLE 201-4: NRCS Type 2 Rainfall Distribution Ordinates
(for use when not already built in the computer program )
Cumulative Percent Cumulative Percent of
Storm Depth
Cumulative Percent Cumulative Percent of
Storm Depthof Storm Time of Storm Time
0 0 52 73
4 1 53 75
10 2.5 54 77
15 4 55 78
20 6 56 80
25 8 57 81
30 10 58 82
33 12 60 83.5
35 13 63 86
38 15 65 87
40 16.5 67 88
42 19 70 89.5
43 20 72 91
44 21 75 92
45 22 77 93
46 23 80 94
47 26 83 95
48 30 85 96
48.5 34 87 97
48.7 37 90 98
49 50 95 99
50 64 100 100
51 71
200-7
Page 12 of 120
Stormwater Model Schematic
Stage Storage Chart
South Basin 10 Year Pre & Post Runoff Ex. 10 Yr South Basin Post 10 Yr South Basin Undetained Post 10 Yr South Basin Detained
South Basin 100 Year Pre & Post Runoff Ex. 100 Yr South Basin Post 100 Yr South Basin Undetained Post 100 Yr South Basin Detained
100 Yr Total Volume Stored
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Project Description
UG Detention Model.SPF
Project Options
CFS
Elevation
SCS TR-20
SCS TR-55
Hydrodynamic
NO
NO
Analysis Options
Jul 17, 2021 00:00:00
Jul 18, 2021 08:00:00
Jul 17, 2021 00:00:00
0 days
0 01:00:00 days hh:mm:ss
0 00:05:00 days hh:mm:ss
0 00:00:30 days hh:mm:ss
1 seconds
Rainfall Details
SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall
ID Source ID Type Units Period Depth Distribution
(years) (inches)
1 Time Series 10_Yr Cumulative inches None None 10 3.83 SCS Type II 24-hr
File Name .......................................................
Flow Units ......................................................
Elevation Type ...............................................
Hydrology Method .........................................
Time of Concentration (TOC) Method ..........
Link Routing Method ......................................
Runoff (Dry Weather) Time Step ..................
Runoff (Wet Weather) Time Step .................
Reporting Time Step ......................................
Routing Time Step .........................................
Enable Overflow Ponding at Nodes ..............
Skip Steady State Analysis Time Periods .....
Start Analysis On ...........................................
End Analysis On ............................................
Start Reporting On .........................................
Antecedent Dry Days .....................................
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Subbasin Summary
Subbasin Area Weighted Total Total Total Peak
ID Curve Rainfall Runoff Runoff Runoff
Number Volume
(ac) (in) (in) (ac-in) (cfs)
Ex_South_Basin 0.26 75.00 3.83 1.54 0.40 0.44
Pavement 0.02 98.00 3.83 3.27 0.06 0.10
Post_South_Basin 0.26 82.22 3.83 2.08 0.54 0.66
Roof 0.13 98.00 3.83 3.59 0.47 0.64
Turf 0.11 61.00 3.83 0.73 0.08 0.08
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Node Summary
Element Invert Ground/Rim Initial Peak Max HGL
ID Elevation (Max) Water Inflow Elevation
Elevation Elevation Attained
(ft) (ft) (ft) (cfs) (ft)
DS_East 845.44 847.00 845.44 0.00 845.44
DS_West 845.65 847.00 845.65 0.00 845.65
Swal_Basin 844.10 845.50 844.10 0.03 844.52
Deten_Out 843.00 0.41 843.35
Ex_Out 843.00 0.43 843.00
Post_Out 0.00 0.66 0.00
Storage 843.50 846.39 843.50 0.64 844.52
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Link Summary
Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow
Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity
Node Elevation Elevation
(ft) (ft) (ft) (%) (in) (cfs) (cfs)
Pipe DS_East Storage 144.00 845.00 844.00 0.6900 8.000 0.0150 0.00 1.05
Pipe DS_West Storage 165.00 845.00 844.00 0.6100 8.000 0.0150 0.00 1.05
Pipe Storage Deten_Out 74.00 843.50 843.00 0.6800 4.250 0.0130 0.27 0.18
Pipe Swal_Basin Storage 20.00 844.10 844.00 0.5000 12.000 0.0150 0.03 2.18
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Subbasin Hydrology
Subbasin : Ex_South_Basin
Input Data
Area (ac) ..........................................................................0.26
Peak Rate Factor .............................................................484.00
Weighted Curve Number ................................................. 75.00
Rain Gage ID ...................................................................*
Composite Curve Number
Area Soil Curve
Soil/Surface Description (acres) Group Number
0.25_AC_Res 0.26 - 75.00
Composite Area & Weighted CN 0.26 75.00
Time of Concentration
TOC Method : SCS TR-55
Sheet Flow Equation :
Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4))
Where :
Tc = Time of Concentration (hr)
n = Manning's roughness
Lf = Flow Length (ft)
P = 2 yr, 24 hr Rainfall (inches)
Sf = Slope (ft/ft)
Shallow Concentrated Flow Equation :
V = 16.1345 * (Sf^0.5) (unpaved surface)
V = 20.3282 * (Sf^0.5) (paved surface)
V = 15.0 * (Sf^0.5) (grassed waterway surface)
V = 10.0 * (Sf^0.5) (nearly bare & untilled surface)
V = 9.0 * (Sf^0.5) (cultivated straight rows surface)
V = 7.0 * (Sf^0.5) (short grass pasture surface)
V = 5.0 * (Sf^0.5) (woodland surface)
V = 2.5 * (Sf^0.5) (forest w/heavy litter surface)
Tc = (Lf / V) / (3600 sec/hr)
Where:
Tc = Time of Concentration (hr)
Lf = Flow Length (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
Channel Flow Equation :
V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n
R = Aq / Wp
Tc = (Lf / V) / (3600 sec/hr)
Where :
Tc = Time of Concentration (hr)
Lf = Flow Length (ft)
R = Hydraulic Radius (ft)
Aq = Flow Area (ft²)
Wp = Wetted Perimeter (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
n = Manning's roughness
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Subarea Subarea Subarea
Sheet Flow Computations A B C
Manning's Roughness : 0.40 0.00 0.00
Flow Length (ft) : 100 0.00 0.00
Slope (%) : 3.5 0.00 0.00
2 yr, 24 hr Rainfall (in) : 2.66 0.00 0.00
Velocity (ft/sec) : 0.09 0.00 0.00
Computed Flow Time (min) : 18.83 0.00 0.00
Subarea Subarea Subarea
Shallow Concentrated Flow Computations A B C
Flow Length (ft) : 80 0.00 0.00
Slope (%) : 3.5 0.00 0.00
Surface Type : Unpaved Unpaved Unpaved
Velocity (ft/sec) : 3.02 0.00 0.00
Computed Flow Time (min) : 0.44 0.00 0.00
Total TOC (min) ..................19.27
Subbasin Runoff Results
Total Rainfall (in) ..............................................................3.83
Total Runoff (in) ...............................................................1.54
Peak Runoff (cfs) .............................................................0.44
Weighted Curve Number ................................................. 75.00
Time of Concentration (days hh:mm:ss) ......................... 0 00:19:16
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Subbasin : Pavement
Input Data
Area (ac) ..........................................................................0.02
Peak Rate Factor .............................................................484.00
Weighted Curve Number ................................................. 98.00
Rain Gage ID ...................................................................*
Composite Curve Number
Area Soil Curve
Soil/Surface Description (acres) Group Number
Drive_Walk 0.02 B 98.00
Composite Area & Weighted CN 0.02 98.00
Time of Concentration
User-Defined TOC override (minutes): 5
Subbasin Runoff Results
Total Rainfall (in) ..............................................................3.83
Total Runoff (in) ...............................................................3.27
Peak Runoff (cfs) .............................................................0.10
Weighted Curve Number ................................................. 98.00
Time of Concentration (days hh:mm:ss) ......................... 0 00:05:00
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Subbasin : Post_South_Basin
Input Data
Area (ac) ..........................................................................0.26
Peak Rate Factor .............................................................484.00
Weighted Curve Number ................................................. 82.22
Rain Gage ID ...................................................................*
Composite Curve Number
Area Soil Curve
Soil/Surface Description (acres) Group Number
Impervious 0.15 B 98.00
Turf 0.11 B 61.00
Composite Area & Weighted CN 0.26 82.22
Time of Concentration
User-Defined TOC override (minutes): 15
Subbasin Runoff Results
Total Rainfall (in) ..............................................................3.83
Total Runoff (in) ...............................................................2.08
Peak Runoff (cfs) .............................................................0.66
Weighted Curve Number ................................................. 82.22
Time of Concentration (days hh:mm:ss) ......................... 0 00:15:00
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Subbasin : Roof
Input Data
Area (ac) ..........................................................................0.13
Peak Rate Factor .............................................................484.00
Weighted Curve Number ................................................. 98.00
Rain Gage ID ...................................................................*
Composite Curve Number
Area Soil Curve
Soil/Surface Description (acres) Group Number
House_Roof 0.13 - 98.00
Composite Area & Weighted CN 0.13 98.00
Time of Concentration
User-Defined TOC override (minutes): 5
Subbasin Runoff Results
Total Rainfall (in) ..............................................................3.83
Total Runoff (in) ...............................................................3.59
Peak Runoff (cfs) .............................................................0.64
Weighted Curve Number ................................................. 98.00
Time of Concentration (days hh:mm:ss) ......................... 0 00:05:00
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Subbasin : Turf
Input Data
Area (ac) ..........................................................................0.11
Peak Rate Factor .............................................................484.00
Weighted Curve Number ................................................. 61.00
Rain Gage ID ...................................................................*
Composite Curve Number
Area Soil Curve
Soil/Surface Description (acres) Group Number
Turf 0.11 B 61.00
Composite Area & Weighted CN 0.11 61.00
Time of Concentration
User-Defined TOC override (minutes): 15
Subbasin Runoff Results
Total Rainfall (in) ..............................................................3.83
Total Runoff (in) ...............................................................0.73
Peak Runoff (cfs) .............................................................0.08
Weighted Curve Number ................................................. 61.00
Time of Concentration (days hh:mm:ss) ......................... 0 00:15:00
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Junction Input
SN Element Invert Ground/Rim Ground/Rim Initial Initial
ID Elevation (Max) (Max) Water Water
Elevation Offset Elevation Depth
(ft) (ft) (ft) (ft) (ft)
1 DS_East 845.44 847.00 1.56 845.44 0.00
2 DS_West 845.65 847.00 1.35 845.65 0.00
3 Swal_Basin 844.10 845.50 1.40 844.10 0.00
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Junction Results
SN Element Peak Peak Max HGL Max HGL Time of
ID Inflow Lateral Elevation Depth Max HGL
Inflow Attained Attained Occurrence
(cfs) (cfs) (ft) (ft) (days hh:mm)
1 DS_East 0.00 0.00 845.44 0.00 0 00:00
2 DS_West 0.00 0.00 845.65 0.00 0 00:00
3 Swal_Basin 0.03 0.00 844.52 0.42 0 12:04
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SEREV 2DATE: 23-Aug-2021Pipe InputSN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No. ofID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate BarrelsElevation Offset Elevation Offset Height(ft) (ft) (ft) (ft) (ft) (ft) (%) (in) (in) (cfs)1 8in_East 144.00 845.00 -0.44 844.00 0.50 1.00 0.6900 CIRCULAR 8.040 8.040 0.0150 0.5000 0.5000 0.0000 0.00 No 12 8in_West 165.00 845.00 -0.65 844.00 0.50 1.00 0.6100 CIRCULAR 8.040 8.040 0.0150 0.5000 0.5000 0.0000 0.00 No 13 Control_Pipe 74.00 843.50 0.00 843.00 0.00 0.50 0.6800 CIRCULAR 4.200 4.200 0.0130 0.5000 0.5000 0.0000 0.00 No 14 Swal_Stor 20.00 844.10 0.00 844.00 0.50 0.10 0.5000 CIRCULAR 12.000 12.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Pipe Results
SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel
ID Flow Peak Flow Capacity Design Flow Velocity Time
Occurrence Ratio
(cfs) (days hh:mm) (cfs) (ft/sec) (min)
1 8in_East 0.00 0 00:00 1.05 0.00 0.00
2 8in_West 0.00 0 00:00 1.05 0.00 0.00
3 Control_Pipe 0.27 0 12:04 0.18 1.45 2.71 0.46
4 Swal_Stor 0.03 0 11:54 2.18 0.01 0.45 0.74
STORMWATER DETENTION MODEL 10 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Storage Nodes
Storage Node : Storage
Input Data
843.50
846.39
2.89
843.50
0.00
0.00
0.00
Output Summary Results
0.64
0.64
0.27
0.00
844.52
1.02
843.56
0.06
0 12:04
0.000
0
0
0.00
Invert Elevation (ft) ...........................................................
Max (Rim) Elevation (ft) ...................................................
Max (Rim) Offset (ft) .........................................................
Initial Water Elevation (ft) .................................................
Initial Water Depth (ft) ......................................................
Ponded Area (ft²) ..............................................................
Evaporation Loss ..............................................................
Peak Inflow (cfs) ...............................................................
Peak Lateral Inflow (cfs) ...................................................
Peak Outflow (cfs) ............................................................
Peak Exfiltration Flow Rate (cfm) ....................................
Max HGL Elevation Attained (ft) ......................................
Total Time Flooded (min) .................................................
Total Retention Time (sec) ...............................................
Max HGL Depth Attained (ft) ............................................
Average HGL Elevation Attained (ft) ...............................
Average HGL Depth Attained (ft) .....................................
Time of Max HGL Occurrence (days hh:mm) ..................
Total Exfiltration Volume (1000-ft³) ..................................
Total Flooded Volume (ac-in) ...........................................
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Project Description
UG Detention Model.SPF
Project Options
CFS
Elevation
SCS TR-20
SCS TR-55
Hydrodynamic
NO
NO
Analysis Options
Jul 17, 2021 00:00:00
Jul 18, 2021 08:00:00
Jul 17, 2021 00:00:00
0 days
0 01:00:00 days hh:mm:ss
0 00:05:00 days hh:mm:ss
0 00:00:30 days hh:mm:ss
1 seconds
Rainfall Details
SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall
ID Source ID Type Units Period Depth Distribution
(years) (inches)
1 Time Series 100_Yr Cumulative inches None None 100 6.46 SCS Type II 24-hr
Runoff (Dry Weather) Time Step ..................
Runoff (Wet Weather) Time Step .................
Reporting Time Step ......................................
Routing Time Step .........................................
Enable Overflow Ponding at Nodes ..............
Skip Steady State Analysis Time Periods .....
Start Analysis On ...........................................
End Analysis On ............................................
Start Reporting On .........................................
Antecedent Dry Days .....................................
File Name .......................................................
Flow Units ......................................................
Elevation Type ...............................................
Hydrology Method .........................................
Time of Concentration (TOC) Method ..........
Link Routing Method ......................................
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Subbasin Summary
Subbasin Area Weighted Total Total Total Peak
ID Curve Rainfall Runoff Runoff Runoff
Number Volume
(ac) (in) (in) (ac-in) (cfs)
Ex_South_Basin 0.26 75.00 6.46 3.68 0.95 1.05
Pavement 0.02 98.00 6.46 6.17 0.10 0.16
Post_South_Basin 0.26 82.22 6.46 4.44 1.14 1.39
Roof 0.13 98.00 6.46 6.22 0.81 1.09
Turf 0.11 61.00 6.46 2.32 0.25 0.31
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Node Summary
Element Invert Ground/Rim Initial Peak Max HGL
ID Elevation (Max) Water Inflow Elevation
Elevation Elevation Attained
(ft) (ft) (ft) (cfs) (ft)
DS_East 845.44 847.00 845.44 0.04 845.52
DS_West 845.65 847.00 845.65 0.00 845.65
Swal_Basin 844.10 845.50 844.10 0.13 845.50
Deten_Out 843.00 0.77 843.35
Ex_Out 843.00 1.05 843.00
Post_Out 0.00 1.39 0.00
Storage 843.50 846.39 843.50 1.09 845.50
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Link Summary
Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow
Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity
Node Elevation Elevation
(ft) (ft) (ft) (%) (in) (cfs) (cfs)
Pipe DS_East Storage 144.00 845.00 844.00 0.6900 8.000 0.0150 0.04 1.05
Pipe DS_West Storage 165.00 845.00 844.00 0.6100 8.000 0.0150 0.00 1.05
Pipe Storage Deten_Out 74.00 843.50 843.00 0.6800 4.250 0.0130 0.36 0.18
Pipe Swal_Basin Storage 20.00 844.10 844.00 0.5000 12.000 0.0150 0.13 2.18
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Subbasin Hydrology
Subbasin : Ex_South_Basin
Input Data
Area (ac) ..........................................................................0.26
Peak Rate Factor .............................................................484.00
Weighted Curve Number ................................................. 75.00
Rain Gage ID ...................................................................*
Composite Curve Number
Area Soil Curve
Soil/Surface Description (acres) Group Number
0.25_AC_Res 0.26 - 75.00
Composite Area & Weighted CN 0.26 75.00
Time of Concentration
TOC Method : SCS TR-55
Sheet Flow Equation :
Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4))
Where :
Tc = Time of Concentration (hr)
n = Manning's roughness
Lf = Flow Length (ft)
P = 2 yr, 24 hr Rainfall (inches)
Sf = Slope (ft/ft)
Shallow Concentrated Flow Equation :
V = 16.1345 * (Sf^0.5) (unpaved surface)
V = 20.3282 * (Sf^0.5) (paved surface)
V = 15.0 * (Sf^0.5) (grassed waterway surface)
V = 10.0 * (Sf^0.5) (nearly bare & untilled surface)
V = 9.0 * (Sf^0.5) (cultivated straight rows surface)
V = 7.0 * (Sf^0.5) (short grass pasture surface)
V = 5.0 * (Sf^0.5) (woodland surface)
V = 2.5 * (Sf^0.5) (forest w/heavy litter surface)
Tc = (Lf / V) / (3600 sec/hr)
Where:
Tc = Time of Concentration (hr)
Lf = Flow Length (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
Channel Flow Equation :
V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n
R = Aq / Wp
Tc = (Lf / V) / (3600 sec/hr)
Where :
Tc = Time of Concentration (hr)
Lf = Flow Length (ft)
R = Hydraulic Radius (ft)
Aq = Flow Area (ft²)
Wp = Wetted Perimeter (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
n = Manning's roughness
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Subarea Subarea Subarea
Sheet Flow Computations A B C
Manning's Roughness : 0.40 0.00 0.00
Flow Length (ft) : 100 0.00 0.00
Slope (%) : 3.5 0.00 0.00
2 yr, 24 hr Rainfall (in) : 2.66 0.00 0.00
Velocity (ft/sec) : 0.09 0.00 0.00
Computed Flow Time (min) : 18.83 0.00 0.00
Subarea Subarea Subarea
Shallow Concentrated Flow Computations A B C
Flow Length (ft) : 80 0.00 0.00
Slope (%) : 3.5 0.00 0.00
Surface Type : Unpaved Unpaved Unpaved
Velocity (ft/sec) : 3.02 0.00 0.00
Computed Flow Time (min) : 0.44 0.00 0.00
Total TOC (min) ..................19.27
Subbasin Runoff Results
Total Rainfall (in) ..............................................................6.46
Total Runoff (in) ...............................................................3.68
Peak Runoff (cfs) .............................................................1.05
Weighted Curve Number ................................................. 75.00
Time of Concentration (days hh:mm:ss) ......................... 0 00:19:16
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Subbasin : Pavement
Input Data
Area (ac) ..........................................................................0.02
Peak Rate Factor .............................................................484.00
Weighted Curve Number ................................................. 98.00
Rain Gage ID ...................................................................*
Composite Curve Number
Area Soil Curve
Soil/Surface Description (acres) Group Number
Drive_Walk 0.02 B 98.00
Composite Area & Weighted CN 0.02 98.00
Time of Concentration
User-Defined TOC override (minutes): 5
Subbasin Runoff Results
Total Rainfall (in) ..............................................................6.46
Total Runoff (in) ...............................................................6.17
Peak Runoff (cfs) .............................................................0.16
Weighted Curve Number ................................................. 98.00
Time of Concentration (days hh:mm:ss) ......................... 0 00:05:00
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Subbasin : Post_South_Basin
Input Data
Area (ac) ..........................................................................0.26
Peak Rate Factor .............................................................484.00
Weighted Curve Number ................................................. 82.22
Rain Gage ID ...................................................................*
Composite Curve Number
Area Soil Curve
Soil/Surface Description (acres) Group Number
Impervious 0.15 B 98.00
Turf 0.11 B 61.00
Composite Area & Weighted CN 0.26 82.22
Time of Concentration
User-Defined TOC override (minutes): 15
Subbasin Runoff Results
Total Rainfall (in) ..............................................................6.46
Total Runoff (in) ...............................................................4.44
Peak Runoff (cfs) .............................................................1.39
Weighted Curve Number ................................................. 82.22
Time of Concentration (days hh:mm:ss) ......................... 0 00:15:00
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Subbasin : Roof
Input Data
Area (ac) ..........................................................................0.13
Peak Rate Factor .............................................................484.00
Weighted Curve Number ................................................. 98.00
Rain Gage ID ...................................................................*
Composite Curve Number
Area Soil Curve
Soil/Surface Description (acres) Group Number
House_Roof 0.13 - 98.00
Composite Area & Weighted CN 0.13 98.00
Time of Concentration
User-Defined TOC override (minutes): 5
Subbasin Runoff Results
Total Rainfall (in) ..............................................................6.46
Total Runoff (in) ...............................................................6.22
Peak Runoff (cfs) .............................................................1.09
Weighted Curve Number ................................................. 98.00
Time of Concentration (days hh:mm:ss) ......................... 0 00:05:00
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Subbasin : Turf
Input Data
Area (ac) ..........................................................................0.11
Peak Rate Factor .............................................................484.00
Weighted Curve Number ................................................. 61.00
Rain Gage ID ...................................................................*
Composite Curve Number
Area Soil Curve
Soil/Surface Description (acres) Group Number
Turf 0.11 B 61.00
Composite Area & Weighted CN 0.11 61.00
Time of Concentration
User-Defined TOC override (minutes): 15
Subbasin Runoff Results
Total Rainfall (in) ..............................................................6.46
Total Runoff (in) ...............................................................2.32
Peak Runoff (cfs) .............................................................0.31
Weighted Curve Number ................................................. 61.00
Time of Concentration (days hh:mm:ss) ......................... 0 00:15:00
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Junction Input
SN Element Invert Ground/Rim Ground/Rim Initial Initial
ID Elevation (Max) (Max) Water Water
Elevation Offset Elevation Depth
(ft) (ft) (ft) (ft) (ft)
1 DS_East 845.44 847.00 1.56 845.44 0.00
2 DS_West 845.65 847.00 1.35 845.65 0.00
3 Swal_Basin 844.10 845.50 1.40 844.10 0.00
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Junction Results
SN Element Peak Peak Max HGL Max HGL Time of
ID Inflow Lateral Elevation Depth Max HGL
Inflow Attained Attained Occurrence
(cfs) (cfs) (ft) (ft) (days hh:mm)
1 DS_East 0.04 0.00 845.52 0.08 0 12:05
2 DS_West 0.00 0.00 845.65 0.00 0 00:00
3 Swal_Basin 0.13 0.00 845.50 1.40 0 12:03
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SEREV 2DATE: 23-Aug-2021Pipe InputSN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No. ofID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate BarrelsElevation Offset Elevation Offset Height(ft) (ft) (ft) (ft) (ft) (ft) (%) (in) (in) (cfs)1 8in_East 144.00 845.00 -0.44 844.00 0.50 1.00 0.6900 CIRCULAR 8.040 8.040 0.0150 0.5000 0.5000 0.0000 0.00 No 12 8in_West 165.00 845.00 -0.65 844.00 0.50 1.00 0.6100 CIRCULAR 8.040 8.040 0.0150 0.5000 0.5000 0.0000 0.00 No 13 Control_Pipe 74.00 843.50 0.00 843.00 0.00 0.50 0.6800 CIRCULAR 4.200 4.200 0.0130 0.5000 0.5000 0.0000 0.00 No 14 Swal_Stor 20.00 844.10 0.00 844.00 0.50 0.10 0.5000 CIRCULAR 12.000 12.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Pipe Results
SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel
ID Flow Peak Flow Capacity Design Flow Velocity Time
Occurrence Ratio
(cfs) (days hh:mm) (cfs) (ft/sec) (min)
1 8in_East 0.04 0 12:04 1.05 0.04 0.23 10.43
2 8in_West 0.00 0 00:00 1.05 0.00 0.00
3 Control_Pipe 0.36 0 12:04 0.18 1.97 3.68 0.34
4 Swal_Stor 0.13 0 12:04 2.18 0.06 0.44 0.76
STORMWATER DETENTION MODEL 100 Year Design 241 1st Ave SE
REV 2
DATE: 23-Aug-2021
Storage Nodes
Storage Node : Storage
Input Data
843.50
846.39
2.89
843.50
0.00
0.00
0.00
Output Summary Results
1.09
1.09
0.53
0.00
845.50
2
843.60
0.1
0 12:04
0.000
0
0
0.00
Total Time Flooded (min) ...................................................
Total Retention Time (sec) .................................................
Max HGL Depth Attained (ft) ..............................................
Average HGL Elevation Attained (ft) ..................................
Average HGL Depth Attained (ft) .......................................
Time of Max HGL Occurrence (days hh:mm) ....................
Total Exfiltration Volume (1000-ft³) ....................................
Total Flooded Volume (ac-in) .............................................
Evaporation Loss ................................................................
Peak Inflow (cfs) .................................................................
Peak Lateral Inflow (cfs) .....................................................
Peak Outflow (cfs) ..............................................................
Peak Exfiltration Flow Rate (cfm) .......................................
Max HGL Elevation Attained (ft) .........................................
Invert Elevation (ft) ..............................................................
Max (Rim) Elevation (ft) ......................................................
Max (Rim) Offset (ft) ...........................................................
Initial Water Elevation (ft) ...................................................
Initial Water Depth (ft) .........................................................
Ponded Area (ft²) ................................................................