Loading...
HomeMy WebLinkAboutA3 New Floor PlanC01C01C01C01 C02C02 C08C08 C10C10 C04C04C11C11 C11C11 C09C09 D02D02 D02D02 D01D01 D05D05 D04D04 UP S / WS / W S / W S / W S / W S / W S / W S / W S / W S / W S / W S / W S / WcL4x4 Post 4x4 Post 4x4 Post E1E1 Elevation 1E2E2 Elevation 2 E3E3 Elevation 3E5E5 Elevation 5E6E6 Elevation 6 E7E7 Elevation 7 E8E8 Elevation 84'-1"6'-8"8'-6 1/4"10'-11 3/4" 4'-11 1/2" 3'-6 1/4"6'-5 1/4" 8'-9 1/2"5'-10"13'-3 3/4"2'-8"7'-5"16'-2"2'-1"4'-3"4'-3"2'-3" 3'-4 3/4"23'-8 1/4"32'-11 1/4"9'-4 3/4"5'-9 1/2"2'-5 3/4" 3'-3 3/4"4'-1 1/2"3'-3 3/4"2'-5 1/4" 1'-2" 78" AFF Bulkhead 90" AFF Ceiling 80" AFF Bulkhead 90" AFF Ceiling UTILITY Support Beam 82 1/2" AFF Unfinished 80" AFF Bulkhead Support Beam Eject Pit Sump Pit Electrical Panel Access Water Main Shut Off HVAC CLOSET BATH LIVING 90" AFF Ceiling 90" AFF Ceiling 90" AFF Ceiling 78" AFF Bulkhead Support Beam R15 Batt Wall Insulation (TYP) R15 Batt Wall Insulation (TYP) Decorative Column 80" AFF Bulkhead 90" AFF Ceiling 90" AFF Ceiling 90" AFF Ceiling R15 Batt Wall Insulation (TYP) ## 11 1.) Frame interior wall against existing foundation walls per the design submitted. 2.) Frame new bulkheads to conceal mechanical systems. 3.) Install new stair rough lumber treads and risers per the IRC code. 4.) Install new white shelving per the design submitted. 5.) Install new vanity cabinet, countertop, and faucet. 6.) Install new toilet unit. 7.) Install new fiberglass tub with tile surround. 8.) Install tile flooring in bathroom area. 9.) Install R15 Batt insulation in interior walls. 10.) Install cabinet door face to conceal electrical panel. 11.) Install new carpet and pad on floor and stair. 12.) Frame wall blocking as needed. 13.) Install new grinder pump. 14.) Install glass shower door. 15.) Paint all walls with client selected color. 16.) Install access panel for hose bib access. 17.)24" x 24" Shower Niche 42" AFF 11 22 22 22 22 33 44 44 55 66 77 88 99 99 99 99 99 99 99 99 99 1010 1111 1111 UTILITY 1212 : New Framed Walls : New Framed Insulated Walls 1313 1111 1111 1414 1515 1515 1515 1515 1515 Support Beam Support Beam 1616 99 Metal Tile Edge 1717 REVISIONSCLIENT DATE SITE MANAGER INITIALSSHEET: SCALE:DRAWINGS PROVIDED BY:DATE: 8/25/2021BasementMr. & Mrs. Falk12948 Cantigny WayEastCarmel, IN 46033IA-3 1/2" = 1'-0"Custom Home Medic1093 3rd Ave South WestCarmel, IN46032New Floor Plan 09/08/21