Loading...
HomeMy WebLinkAboutS005Š Š Š Š Š Š Š Š VALID FOR 1 PERMIT ONLY U.N.O.REMARKS DRWN CHKD DATESCALE: COPYRIGHT ENGINEERING EXPRESSŠC:\Users\colby\Engineering Express\Production - Documents\Projects\20-25436 Aluminum Louvered Roof\WP\Drawings & CAD\20-25436n Louvered Roof MPS.dwg07/23/2021 - 1:43pm colby INIT ISSUE (18-5654) RWN TSB 8/24/182018 IBC EPR RWN 5/11/20DETAIL UPDATES EPR RWN 7/22/202021 UPDATE CCB AEM 7/13/21- - - -UNLOADED OUTER BEAM, TYP. HOST STRUCTURE, BY OTHERS LEDGER BEAM MID POST, TYP. MAIN BEAM, TYP. BEAM TO MID POST, TYP. 4 4 BEAM TO HOST GRADE 12'-0" MAX HEIGHT(DIAG. BRACING)LOUVER SPAN (SEE SCHEDULES) UNLOADED OUTER BEAM, TYP. MAIN BEAM, TYP. GRADE LOUVER SPAN (SEE SCHEDULES) MAIN BEAM, TYP. MAIN BEAM BEAM TO CORNER POST, TYP. GRADE MAIN BEAM SPAN (SEE SCHEDULES) MAIN BEAM MAIN BEAM SPAN (SEE SCHEDULES) N.T.S. SIDE ELEVATION N.T.S. N.T.S. FREESTANDING & HOST ATTACHED (MULTI-BAY) SIDE ELEVATION FRONT ELEVATION DIAGONAL BRACING OPTION, SEE SEPARATE DETAIL FOR ATTACHMENT, TYP. MID POST, TYP. CORNER POST, TYP. MID POST, TYP. 2 5 BEAM TO MID POST, TYP. 6 2 1 4 6 2 BEAM TO CORNER POST, TYP. 1 4 4 4 HOST ATTACHED (MULTI-BAY) POST BASE ATTACHMENT, TYP. FREESTANDING (MULTI-BAY) LOUVER SPAN (SEE SCHEDULES) CORNER POST, TYP. CORNER POST, TYP. 6 2 BEAM TO CORNER POST, TYP.1 4 LOUVER SPAN (SEE SCHEDULES) MAIN BEAM, TYP. 2 5 4 4 BEAM TO MID POST, TYP. 2 5 4 4 DIAGONAL BRACING OPTION, SEE SEPARATE DETAIL FOR ATTACHMENT, TYP. DIAGONAL BRACING OPTION, SEE SEPARATE DETAIL FOR ATTACHMENT, TYP.10'-0" MAX HEIGHT(NO DIAG. BRACING)12'-0" MAX HEIGHT(DIAG. BRACING)10'-0" MAX HEIGHT(NO DIAG. BRACING)CORNER POST, TYP. BEAM SPAN (SEE SCHEDULES)LOUVER SPAN(SEE SCHEDULES)UNLOADED OUTER BEAM, TYP. MAIN BEAM LOUVERS, TYP. BEAM SPAN (SEE SCHEDULES) MAIN BEAM 3 3 BEAM TO CORNER POST N.T.S. HOST ATTACHED (MULTI-BAY) PLAN LOUVER SPAN(SEE SCHEDULES)HOST STRUCTURE, BY OTHERS LEDGER BEAM, TYP.1 3 BEAM SPAN (SEE SCHEDULES)LOUVER SPAN(SEE SCHEDULES)UNLOADED OUTER BEAM, TYP. MAIN BEAM LOUVERS, TYP. BEAM SPAN (SEE SCHEDULES) MAIN BEAM POST, TYP. 3 3 BEAM TO CORNER POST, TYP. N.T.S. FREESTANDING (MULTI-BAY) PLANLOUVER SPAN(SEE SCHEDULES)MAIN BEAM, TYP. 2 3 BEAM TO CORNER POST BEAM TO MID POST, TYP. BEAM TO MID POST, TYP. MULTI-BAY DIRECTIVE A BAY IS DEFINED IN THIS DOCUMENT AS THE RECTANGULAR REGION BETWEEN (4) NEIGHBORING POSTS OR (2) POSTS AND A SIDE SUPPORTED BY THE HOST STRUCTURE (BY OTHERS). SEE CIRCLED REGIONS BELOW. THE DETAILS ON THE PREVIOUS PAGES DEPICT SINGLE-BAY AND DOUBLE-BAY SCENARIOS. THE DETAILS ON THIS PAGE DEPICT MULTI-BAY SCENARIOS ORGANIZED INTO A 2 x 2 MATRIX. OTHER MULTI-BAY SCENARIOS ARE ALLOWED UP TO A MAXIMUM OF (4) BAYS, SUBJECT TO ALL LIMITATIONS AND SPECIFICATIONS STATED HEREIN. PLEASE CONTACT THIS OFFICE FOR ADDITIONAL CLARIFICATIONS AND/OR CONFIGURATIONS.12'-0" MAX HEIGHT(DIAG. BRACING)10'-0" MAX HEIGHT(NO DIAG. BRACING)6 5 POST BASE ATTACHMENT, TYP. -- 6 6 5 -- 6 6 5 POST BASE ATTACHMENT, TYP. -- 6 PHOTOCOPIES NOT TO BE USED VALID ONLY FOR ZIP CODE: 46033 VALID ONLY FOR: Cutting Edge Hardscapes FOR PERMIT USE WITHIN 14 DAYS OF DIGITAL SEAL PE10606888 09/13/21