HomeMy WebLinkAboutP100.0 PlumbingHW HWGAS GAS GAS GASGAS GAS GAS GAS GAS GAS GAS GAS GASHW HW HW HWHW
Jadam Property Group, LLCBuilding Expansion4511 W 99TH STREETCarmel, Indiana 46032IN+Design, llc
9425 N. Meridian St #214
Indianapolis, Indiana 46250
Ph: 317-549-5600
PRECEPT, LLC
8801 River Crossing Blvd
Indianapolis, Indiana 46240
Ph: 317-843-5959
Suite 300
Review Set
7062 N. TUXEDO STREETINDIANAPOLIS, IN 46220PH: 317-508-4516 FAX: 317-820-3405e-mail: morwalsoplad1@gmail.comJACK P. MORGANAIA CSI - ARCHITECTPLUMBING PLANP1.102/07/21
PLUMBING PLAN - BUILDING VIEW
SCALE: 1/8" = 1'-0"
PLUMBING PLAN - OFFICE VIEW
SCALE: 1/4" = 1'-0"
UH-1 UH-2
400,000 400,000
UNIT HEATERS
1. The plumbing system shall be installed according to State and Local Requirements, to
assure a complete, safe and workable system.
2. P.V.C. schedule 40 may be used for waste and vent lines if acceptable to local
governing codes.
3. Insulate hot and cold water lines with 3/8" "Armflex" insulation.
4. Hot and cold water supply piping shall be type "L" hard copper minimum. Use type "K"
copper below ground.
5. All dimensions must be verified in the field.
6. Plumbing Contractor shall coordinate his work with all other trades to assure a
complete, safe and workable system.
7. Plumbing Contractor shall coordinate location and provide the rough-in and final
connection of any Owner supplied equipment.
8. All hot water supplies shall have temperature limiting controls, so that the water does
not exceed 120 degrees.
9. Water conservation shall be in accordance with prevailing energy codes.
10. The Plumbing Contractor to furnish & install all electric water heaters. The Electric
Contractor to wire all water heaters.
11. Where applicable, run water lines on warm side of insulation.
12. Shock arrestors to be installed on all hot & cold water supply lines, as required.
13. This contractor to verify all aspects of water & sewer service with the local utility
company.
14. The Plumbing Contractor shall install floor drains with cleanouts to meet code
requirements. Floor drains shall be chrome or brass finish top. Top of floor drains shall
be level and even with floor. If floor drains installation is unacceptable to the Architect
this Contractor shall repair at no extra cost to the Owner.
15. Any cutting and patching required by this Contractor to perform his work shall be done
by this Contractor. Coordinate any curing and patching with General Contractor.
16. The plumbing contractor shall install the plumbing system as shown on the drawings.
The system shall meet all state and local governing codes. Should the plumbing
contractor desire to make any changes concerning the plumbing system, he shall be
responsible to obtain approval of changes from the
architect / engineer prior to making such changes.
17. Gas piping shall be by this Contractor. The installation and materials used shall be
according to N.F.P.A. Standards covering such installations. Coordinate gas meter
locations with local utility company requirements.
GAS METER
FU-1
60,000
INSTALL SHUT OFF
AT ALL GAS APPLIANCES
34" WATER SERVICE LINE IN
WATER LINE UP TO
ABOVE CEILING
2" SEWER LINE
FLOOR DRAIN/
CLEAN OUT TO
END OF LINE
SEWAGE EJECTION
PIT WITH DUAL
PUMPS
2" FORCE MAIN FROM
SEWAGE PUMP TO
EXISTING BUILDING
SEWER MAIN
3"W
3"W
2"W
1 14"V
1 12"V
2" VENT UP/
3" THRU ROOF
2" MAIN VENT UP
3" THRU ROOF
1 14" V
1 12"V
2"W
3"W
3"W
2"W
SEWAGE EJECTOR PUMP
2" FORCE MAIN TO
EXISTING BUILDING
PLUMBING ISOMETRIC
SCALE: NTS
1
2" HW/CW
12" CW
12"HW/CW
09/14/21