Loading...
HomeMy WebLinkAboutLandscape Plan Stamped Approved 09-14-21OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHUOHU6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SS D 6''SS D 6''SS D 6''SSD 6''SSD 6''SSD 6''S S D 6''SSD6''SSD6' ' S S D 6' ' S S D6''SSD6''SSD6''SSD6''SSD6''SSD 6''SSD6''SSD6''SSD6''SSD 6''SSD 6''SSD6''SSD6''SSD 6''SSD 6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSDDO NOTENTERSTOP1234567891012345678910STOPDRIVE TO BE CONSTRUCTED BY OTHERS UNDERGROUND DETENTION WALK TO BE CONSTRUCTED BY OTHERS PROPOSED BMP & ACCESS EASEMENTDETENTION: 7' CMPFL / INV 843.8 (FLAT: 0% SLOPE)(TOP OF PIPE 850.8)HW 10-YR= 847.32HW 100-YR= 850.59RDRDRDRDR D R D RDRDRDRDRDRDRDRDNO PARKINGPROPOSED BMP & ACCESS EASEMENTDO NOTENTERSTOP1234567891012345678910STOPDRIVE TO BE CONSTRUCTED BY OTHERS UNDERGROUND DETENTION WALK TO BE CONSTRUCTED BY OTHERS PROPOSED BMP & ACCESS EASEMENT(1) Pla-x(3) Zel-s(1) Zel-s(1) Zel-s(1) Que-r(1) Ulm-x(1) Ulm-x(1) Ulm-x(1) Ulm-x(1) Lir-t(1) Lir-t(1) Mag-s(4) Tax-x(5) Tax-x(5) Tax-x(1) Mag-s(1) Mag-s(4) Tax-x(4) Bux-g(5) Tax-x(4) Bux-g(1) Mag-s(3) Mag-s(3) Phy-d(31) Pan-r(1) Syr-r(3) Phy-d(3) Pic-a(7) Ile-d(6) Cel-o(10) Vib-j(8) Phy-d(11) Vib-j(8) Phy-d(8) Ile-d(1) Lir-t(2) Pic-a(3) Pic-f(15) Ses-a(3) Pic-a(3) Ame-x(3) Mag-s(3) Pic-f(15) Ses-a(3) Pic-a(5) Cal-k(5) Pic-f(3) Syr-r(3) Pic-a(3) Pic-f(4) Pic-f(3) Pic-a(4) Pic-a(4) Pic-f(3) Cer-c(3) Ame-x(1) Que-r(1) Bet-n(1) Bet-n(1) Bet-n(7) Jun-v(1) Syr-r(31) Pan-r(5) Tax-x(5) Cal-k(1) Pla-xExisting 15" Bald CypressRefer to LD100Existing 16" Bald CypressRefer to LD100Existing 15" Bald CypressRefer to LD100Existing 11" Bald CypressRefer to LD100Existing 12" MapleRefer to LD100Existing 19" Bald CypressRefer to LD100Existing 15" Bald CypressRefer to LD100Existing 13" Tulip PoplarRefer to LD100Existing 16" Tulip PoplarRefer to LD100Existing 14" Tulip PoplarRefer to LD100(16) Bux-g(22) Rho-x(25) Pan-r(1) Pic-f(7) Cal-k(2) Pic-f(1) Mag-s(4) Bux-g(4) Bux-g(1) Zel-s(2) Ulm-x(1) Ulm-x(3) Ile-m(3) Cor-a(3) Ile-m(3) Cor-a(3) Ile-m(18) Nep-p(12) Nep-p(1) Ulm-x(3) Cat-s(3) Que-r(2) Pic-a(3) Jun-e(3) Pic-a(7) Pan-h(27) Pan-h(36) Ses-a0Scale 1" = 30'-0"60'30'15'North5825 Lawton Loop E. Dr. | Indianapolis, IN 46216317-482-6900 | www.context-design.comMATCHLINE - REFER TO SHEET L401MATCHLINE - REFER TO SHEET L404MATCHLINE - REFER TO SHEET L404MATCHLINE - REFER TO SHEET L401 Lawn Seed MixRefer to Specification 32 92 00.PLANTING LEGENDORDINANCE CHART1.Refer to Project Manual for Planting Specifications and Topsoilrequirements. Refer to Plant Schedule and Planting Details for additionalinformation.2.All materials are subject to the approval of the Landscape Architect andOwner at any time. Landscape Architect to inspect all plant locationsand plant bed conditions prior to installation. On-site adjustments maybe required.3.Rootballs shall meet or exceed size standards as set forth in 'AmericanStandards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALLREMAIN INTACT.4.Remove from the site any plant material that turns brown or defoliateswithin five (5) days after planting. Replace immediately with approved,specified material.5.Plant counts indicated on drawings are for Landscape Architect's useonly. Contractor shall make own plant quantity takeoffs using drawings,specifications, and plant schedule requirements (i.e., spacing), unlessotherwise directed by Landscape Architect. Contractor to verify bedmeasurements and install appropriate quantities as governed by plantspacing per schedule. Plant material quantities shown on plan areminimum quantities. Additional material may be needed to meet spacingrequirements and field conditions.6.Seed all areas disturbed by construction activities that are not otherwisenoted to receive pavement, planting bed, or sod treatment.7.The Contractor shall install and/or amend topsoil in all proposed bedareas to meet Specifications. Contractor shall coordinate quantity andplacement of topsoil. Landscaper shall verify depth of topsoil prior toplant installation. (Refer to specifications for topsoil source andplacement requirements)8.All tree locations shall be marked with 2x2" stakes prior to planting forreview and approval by the Landscape Architect. Any plant materialinstalled in an incorrect location, by the judgment of the LandscapeArchitect, shall be reinstalled at the Contractor's expense.9.All plant beds shall receive 3" minimum of shredded hardwood barkmulch (unless otherwise noted).10.Verify all utility locations in the field prior to beginning work. Repair alldamaged utilities to Owner's satisfaction at no additional cost.11.The Contractor shall maintain all plant material and lawns until theproject is fully accepted by the Landscape Architect, unless otherwisenoted.12.All workmanship and materials shall be guaranteed by the Contractor fora period of one calendar year after Final Acceptance.13.Install all plant material in accordance with all local codes andordinances. Coordinate with the Owner to obtain any required permitsnecessary to complete work.14.Contractor shall test all tree pits for drainage. Any tree pit that holdswater for more than 24 hours shall be installed using tree pit drainage.15.Tree Protection Fencing is the responsibility of the Contractor. Minimumprotected area shall include the full drip line of the canopy. NOconstruction activities, material storage, etc. may occur within that area.The Contractor shall ensure that no soil compaction or tree damageoccurs in any Protected areas, at any time during the constructionprocess.16.Trees shall be matched in groups unless otherwise noted.17. LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILSON SHEET L410 - SEE PLANTING DETAILS.GENERAL LANDSCAPE ANDPLANTING NOTESProposed Building111,802 sq. ft.FFE: 855.8031.Addendum #03 12-20-2019ZONING: R2 - INSTITUTIONALBuffer Requirements:Level A: 10' width; 4 shade/evergreen + 10 shrubs/100 l.f.Level C: 15' width; 6 shade/evergreen + 1 ornamental + 15 shrubs/100 l.f.Level D: 30' width; 8 shade/evergreen (3 of every 8 min. evergreen) + 2 ornamental+ 20 shrubs/100 l.f.North (west half): 350 l.f. @ Level A (Refer to Parking Lot Perimeter for 250 l.f.)Required: 14 shade/evergreen + 35 shrubsProvided: 14 shade +35 shrubsNorth (east half): 303 l.f. @ Level DRequired: 24 shade/evergreen (min.10 evergreen) + 6 ornamental + 61 shrubsProvided: 12 shade + 12 evergreen + 6 ornamental + 61 shrubsWest (north section): 708 l.f. @ Level DRequired: 58 shade/evergreen trees (min. 22 evergreen) + 15 ornamental trees +142 shrubsProvided: 34 existing shade + 24 existing evergreen + 3 Shade + 3 existingornamental + 12 ornamental + 142 shrubsWest (south section): 342 l.f. @ Level CRequired: 21 shade/evergreen + 4 ornamental + 52 shrubsProvided: 16 shade + 9 ornamental (Per Urban Forester may substitute 1ornamental for 1 shade along this boundary) + 52 shrubsSouth: 653 l.f. @ Level DRequired: 53 shade/evergreen (min. 20 evergreen) + 14 ornamental + 131 shrubsProvided: 31 existing shade + 2 shade + 20 evergreens + 14 ornamental + 131shrubsEast: 1050 l.f. @ Level DRequired: 85 shade/evergreen (min. 32 evergreen) + 21 ornamental + 210 shrubsProvided: 34 existing shade + 14 shade + 40 evergreen + 18 ornamental + 210shrubs (Per Urban Forester request to substitute 3 shade for ornamental atbasketball court, reduce shrub count 13 at eastern property extension)PARKING:Requirements:1 shade tree + 5 shrubs per every 10 parking spaces, no parking space may begreater than 66 ft. from the nearest tree.Interior Parking: 116 parking spacesRequired: 12 shade trees + 58 shrubsProvided: 12 shade trees + 58 shrubsFOUNDATION REQUIREMENTS:Planting beds min. 5 ft. width except at driveways, courtyards, plazas, andpedestrian access; cover 75% of planting area; foundation shrub spacing shall notexceed 5 ft. intervalsRequired: 3181 sq. ft. x 0.75 = 2385 sq. ft. minimum coverageProvided: 2581 sq. ftSIGNAGE FOUNDATION REQUIREMENTS:Planting bed to match sign face sq. ft.Required: 63 sq. ft. x 2 sides = 126 sq. ft.Provided: 126 sq. ft.CONFORMEDSET42. ASI 059 08-31-20214