Loading...
HomeMy WebLinkAboutLi Estimate9/7/2021 Main Basement Estimate https://coconstruct.com/app/shared/Proposal.aspx?propid=277200&it=False&pi=1091685&print=true 1/7 _____________________________________________________ 8847 Commerce Park Place Suite J                                                                        Basement Estimate Indianapolis, IN  46268                                                                                               June 30, 2021                                                                                                                                          Prepared For: Phone # 317-714-6536                                                                                               Xuelin & Xiaowen Li                                                                                                                                         13030 Corey Ave www.cmhbuilders.com                                                                                               Carmel, IN 46032 _____________________________________________________ 09/14/21 9/7/2021 Main Basement Estimate https://coconstruct.com/app/shared/Proposal.aspx?propid=277200&it=False&pi=1091685&print=true 2/7 Estimate 1000 Building Permits $626.00 Estimated permit cost. $626.00 1100 Framing $9,880.47 Framing labor and material. $9,880.47 Labor and material to complete framing in the basement. --Includes all new walls and bulkheads. --Includes all fasteners, tax, and delivery. 1200 Rough In Plumbing $4,654.97 (A) Plumbing rough in. $4,654.97 Labor and material to rough in plumbing as follows: --All water lines and drains for toilet, vanity and shower --Fiberglass shower --Ejector pump with alert system. --Additional charges may apply if the existing under slab plumbing needs to be removed, replaced, or repaired. Option for backup sump pumps. Option for backup sump pumps. Option #1 - Select this option for: Water-powered backup sump pumps. +$707.20 Option #2 - Select this option for: Battery powered backup sump pump +$929.58 Option #3 - Select this option for: New primary sump pump with water-powered backup +$1,115.20 Option #4 - Select this option for: New Primary sump pump with battery-powered backup sump pump. +$1,337.58 Client may decline this selection $0.00 1250 Finish Plumbing $1,502.52 (A) Plumbing finish $554.10 Labor and material to finish plumbing for bathroom as follows: --Includes all drains, sink strainer and supply lines. -Includes labor to install vanity faucet, toilet, shower trim kit with shower head, towel bar, hand towel holder, toilet paper holder, 1/4" frameless mirror. --See Budget items below for toilet, faucets, bathroom accessories. 09/14/21 9/7/2021 Main Basement Estimate https://coconstruct.com/app/shared/Proposal.aspx?propid=277200&it=False&pi=1091685&print=true 3/7 (B) Plumbing finish toilets $153.80 Toilet budgets. --Mansfield standard height elongated toilet is included in the estimated total Option #1 - Select this option to: Upgrade to a Mansfield comfort height round toilet. +$43.75 Option #2 - Select this option to: --Upgrade to a Mansfield comfort height elongated toilet. +$56.25 Option #3 - Select this option to remain with the Mansfield standard height elongated toilet as quoted. $0.00 Optional Shower door Labor and material to install 70" tall semi-framless by-pass shower door. --Based on multiple frame colors and glass types. Option #1 - Select this option for: --Labor and material to install 70" tall semi-framless by-pass shower door. --Based on multiple frame colors and glass types. +$704.00 Client may decline this selection $0.00 Plumbing fixtures $794.62 Plumbing fixture budget. --Includes shower valve, shower head, vanity faucet,18" towel bar, towel ring, toilet paper holder, 1/4" polished edge mirror, wet bar faucet. 1300 HVAC Rough In $1,038.27 HVAC Labor and Material. $1,038.27 Labor and material to complete HVAC rough-in as follows: --Includes 3 supplies and one return. --Includes all final registers and grills. --Includes bathroom exhaust fan/light combo. 1400 Electrical rough in $4,079.47 Electrical Rough-in $4,079.47 Labor and material to complete electrical rough-in. --Estimating 18 can lights and vanity light junction --Includes moving existing lights into storage and utility areas. --Outlets and switches per code. --Includes 2 TV outlet --Includes 1 CO/smoke detector and 1 smoke detector. --Includes electrical sub-panel. --Add an Additional $50.00 per network cable if needed. --Cable and network wiring to run into an unfinished area and to be connected by the service provider. 09/14/21 9/7/2021 Main Basement Estimate https://coconstruct.com/app/shared/Proposal.aspx?propid=277200&it=False&pi=1091685&print=true 4/7 1450 Electrical Finish $1,560.65 (A) Electrical Finish $1,297.28 Labor and material to complete electrical finish as follows: --Install all LED Can light trim kits. --Install all switches, outlets, and cover plates. --All switches, outlets, and cover plates to match existing as close as possible. --Add an additional $31.00 per dimmer switch. Accent Lighting Budget $137.50 Light fixture budget --Based on 1 vanity light. --Selected with CMH Builders designer during selections appointment. AV Chase. $125.87 Labor and material to install AV chase in media area. --Based on 2 " PVC Chase installed behind TV and terminate below TV. 1500 Insulation $1,881.41 (A) Wall Insulation labor and material. $1,881.41 Labor and material to install R-13 insulation in exterior walls. --Based on sq. ft. of coverage --Includes walls between finished and unfinished areas. Optional ceiling insulation in new finished area only. Labor and material to add R-13 insulation to the ceiling of the finished area only Option #1 - Select this option for: Labor and material to install R-13 ceiling insulation in newly finished areas only. +$967.68 Client may decline this selection $0.00 1600 Drywall $6,286.33 Drywall $6,286.33 Labor and material to hang and finish drywall --Includes smooth walls and textured ceilings. --Ceiling texture to match the main level as close as possible, if present. --Walls and ceilings inside utility and unfinished storage area to be free of drywall. --Includes drywall, mud, corner bead, tape, tax, and delivery --Includes repairs to existing drywall on stairs that are damaged during CMH Builders construction. --An additional charge of $50.00 per hour per man plus material charge will apply for additional work needed to repair existing drywall damage. 1700 Interior Trim $3,274.79 09/14/21 9/7/2021 Main Basement Estimate https://coconstruct.com/app/shared/Proposal.aspx?propid=277200&it=False&pi=1091685&print=true 5/7 (A) Interior trim $3,115.97 Labor and material to complete interior trim as follows: --Install 6 hollow core hinged doors. --Install baseboards, casing, and door hardware. --All doors, trim, and hardware to match existing as close as possible. Closet shelving $158.82 Labor and material to install wire shelving in the bedroom closet --Based on 1 row of 12" wire wardrobe shelves on 1 wall of the closet. 1800 Painting $3,654.36 Complete painting package. $3,654.36 Labor and material to complete the painting as follows: --Sand and prime all new drywall. --Textured ceiling to be painted with flat white primer. --Custom color paint on finished walls. --Paint color selected by Homeowners using CMH Builders designer. --Paint color to be ___ --Based on 1 color 2 coats with Sherwin Williams Washable Flat paint. --Walk-in closets to be painted to match walls. --Standard depth closets to be painted flat white. --Additional charges will apply if a darker color is selected and requires more than 2 coats. --Prep and paint all trim and doors. --Based on Sherwin Williams Semi-Gloss White paint. 1900 Flooring $3,601.52 Carpet flooring $2,568.02 Labor and material to install carpet in Media and Game Room of basement per approved design. --Based on Level 2 carpet. --Carpet to be ____ --Includes new 8 lb. pad. --Includes tack strips, metal transition, tax, and delivery. LVP Flooring $1,033.50 Labor and material to install floating LVP flooring in bathroom and bedroom per approved design. --Based on Level 2 floating LVP flooring. --Flooring to be _____ --Includes tax and delivery. --Multiple other options available at CMH Builders Showroom ***Slab conditions to dictate the final cost of flooring labor. Certain slab conditions may increase the cost of flooring labor (i.e. levelness, cracking, and control joints). CMH Builders flooring installer to examine slab prior to installation to determine the final cost of flooring install. 2100 Cabinets $516.60 09/14/21 9/7/2021 Main Basement Estimate https://coconstruct.com/app/shared/Proposal.aspx?propid=277200&it=False&pi=1091685&print=true 6/7 (B) Vanity Cabinet $516.60 Labor and material to install the vanity cabinet. --Based on 30" white Shaker cabinet --Includes Onyx Granite Gloss countertop with integrated sink. --Countertop to be in color ____ 6000 Discount ($1,500.00) CMH Builders Discount ($1,500.00) Discount if the estimate is accepted and deposit paid by June 30, 2021. --Discount is based on estimate total and is subject to change as estimate total changes. Base Price $41,057.36 09/14/21 9/7/2021 Main Basement Estimate https://coconstruct.com/app/shared/Proposal.aspx?propid=277200&it=False&pi=1091685&print=true 7/7                                                                                                ****Additional Information**** 1. All pricing is based on CMH Builders completing the entire scope of work using CMH Builders Supplier Materials.  Unit pricing may change if portions of the project removed from CMH Builders' scope. 2. CMH Builders offers a 2 year workmanship warranty on all basements, including a 1 time drywall touch up from settling within the first year. 3. Due to potential changes of material costs from suppliers CMH Builders estimates are valid for 30 days. 4. All work completed by CMH Builders will be up to local building codes.  This estimate does not include repairs or code updates required by the municipal inspector in other areas of the home. Any upgrades required by the inspector, outside of CMH Builders' scope of work, will require additional compensation. 5.  Not all items displayed in CMH Builders proved design is included in the estimate above. 6. Estimate includes up to 2 visits at 2 hours each visit to make selections with CMH Builders Designer.  Additional Charges of $85.00 per hour will apply for any time spent past the amount listed.  Xuelin & Xiaowen Li,  "Homeowner"  has been presented with an estimate for basement finish and wishes to contract with CMH Builders Inc. "Contractor" to complete a basement finish project at 13030 Corey AveCarmel, IN 46032.  Homeowner agrees to estimate total with the understanding that final selections may increase or decrease the final project cost.   Homeowner to complete all project selections prior to signing Contract with Contractor to determine final pre- construction cost. Contractor to present final contract documents to Homeowner within 5 Business Days of the successful completion of all project selections. The homeowner has been presented and agreed to the basement design completed by the Contractor. The basement design is attached as Exhibit B to this Agreement. Homeowner Agrees to pay an earnest money deposit of $1,000.00 (nonrefundable deposit) when signing this agreement. Homeowner to selected a tentative start date with the understanding that the start date may change based on the date of the successful completion of all project selections. Signatures Client: Xuelin & Xiaowen Li Jun 30, 2021 Date Builder: Todd Lipking Jun 30, 2021 Date 09/14/21