HomeMy WebLinkAboutD111 DECONSTRUCTION+42"+42"+42"+42"DECONSTRUCTION PLAN
DECONSTRUCTION
PLAN
D111
REMOVE EXISTING CABINETRY AND COUNTERTOP.
REMOVE EXISTING BULKHEAD AT THIS LOCATION.
REMOVE ALL CEILING GRID + TILE, LIGHTING, AND ASSOCIATED
CEILING ELEMENTS IN THIS AREA; SEE REFLECTED CEILING PLAN
FOR MORE INFORMATION.
IN AREA TO BE EXPOSED TO DECK, REMOVE AS MUCH OF THE
EXPOSED CONDUIT, PIPING, JUNCTION BOXES AND
MISCELLANEOUS UNUSED EQUIPMENT IN THE CEILING AS POSSIBLE.
REMOVE LOW PRESSURE SUPPLY BRANCH LINE DUCT AND
REPLACE WITH NEW RIGID SPIRAL DUCT AND ROUND SUPPLY
DIFFUSERS AS REQUIRED. SEE REFLECTED CEILING PLAN FOR EXACT
LOCATION OF EXPOSED DECK CEILING.
REMOVE PORTION OF COMMON CORRIDOR AT THIS SUITE FOR
NEW EGRESS DOOR. INTENT IS TO REUSE SALVAGED DOOR FROM
DECONSTRUCTION. DOOR LOCATION TO COMPLY WITH ALL STATE
AND LOCAL CODES. FINAL LOCATION TBD.
DESCRIPTIONDATE
ISSUE
08.13.21 REVIEW SET
08.18.21 PERMIT SET
REVISIONS
DESCRIPTIONMARK DATE DB
THIS DRAWING, AND THE IDEAS,
DESIGNS AND CONCEPTS CONTAINED
HEREIN, ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC., AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE, OR
IN PART, WITHOUT THE WRITTEN
CONSENT OF SCHOTT DESIGN.450 E. 96th StreetIndianapolis, IN 46240p: 317.387.1700www.schottdesign.comPROJECT NUMBER
DRAWN BYPROJ. MGR BASTIAN SOLUTIONSONE MERIDIAN PLAZA | SUITE 20010585 N. MERIDIAN ST, INDIANAPOLIS, IN 46290EHEH
2021.130
2ND FLOOR
N
0 2' 4' 8' 16'
ELECTRIC OUTLET(S)
DATA OR
COMMUNICATION
OUTLET
EXISTING TO BE REMOVED EXISTING TO REMAIN
WALL
DOOR AND FRAME
WINDOW / SIDELIGHT
WALL
DOOR AND FRAME
CEILING GRID AND
TILES, 2'x4'
SUPPLY AIR DIFFUSERS
LIGHT FIXTURE,
FLUORESCENT, 2'x4'
LIGHT FIXTURE, CAN
LIGHT SWITCH
LIGHT FIXTURE,
FLUORESCENT, 2'x2'
WINDOW / SIDELIGHT
CEILING GRID AND
TILES, 2'x2'
LIGHT FIXTURE, TRACK
LIGHT FIXTURE, SCONCE
LIGHT FIXTURE,
PENDANT
EXIT LIGHT
LIGHT FIXTURE,
FLUORESCENT
EXHAUST FAN
EMERGENCY LIGHT
PARTIAL HEIGHT WALLPARTIAL HEIGHT WALL
PLAN NOTESLEGEND
1. REFER TO ALL DECONSTRUCTION NOTES ON TITLE SHEET T111.
2. ALL ITEMS BEING REMOVED FROM PROJECT AREA ARE TO BE
CAREFULLY CONSIDERED FOR REUSE IN THE PROJECT OR
SALVAGED FOR LANDLORD. FOR ALL ITEMS DETERMINED FOR
REMOVAL, REFER TO THE RECYCLING INSTRUCTIONS.
3. REMOVE ALL EXISTING SWITCHES IN PREPARATION FOR NEW.
REMOVE EXISTING RECEPTACLES AS SHOWN ON PLAN PER
LEGEND. PATCH WALL AND PREPARE FOR NEW FINISHES AS
REQUIRED.
4. SALVAGE REMOVED LIGHT FIXTURES AND HVAC DIFFUSERS FOR
REUSE WHERE POSSIBLE. SEE REFLECTED CEILING PLAN FOR MORE
INFORMATION. REFER TO RECYCLING INSTRUCTIONS FOR
FIXTURES THAT WILL NOT BE SALVAGED.
5. SALVAGE REMOVED DOORS FOR REUSE WHERE POSSIBLE. SEE
DOOR SCHEDULE FOR MORE INFORMATION. REFER TO
RECYCLING INSTRUCTIONS FOR DOORS THAT WILL NOT BE
SALVAGED.
GENERAL NOTES RECYCLING INSTRUCTIONS
METALS ONLY RECYCLING BIN:
1. CONTACT WASTE HAULER TO ORDER TRASH DUMPSTER(S) AS
REQUIRED AND (1) "METALS ONLY" RECYCLING BIN FOR THE
DEMOLITION PORTION OF PROJECT ONLY. SIZE OF "METALS ONLY"
BIN IS DETERMINED BY THE AMOUNT OF DEMOLITION (10-40 YARD
CONTAINERS AVAILABLE).
2. DRYWALL MUST BE REMOVED FROM ALL METAL STUDS PRIOR TO
PLACING IN "METALS ONLY" BIN. ANY ADDED LABOR COST WILL BE
COVERED BY METAL CREDITS RECEIVED FROM WASTE HAULER.
3. WASTE HAULER WILL APPLY CREDIT FOR METALS OBTAINED IN
"METALS ONLY" BIN TOWARDS CONTRACTORS OVERALL INVOICE.
4. DATA/DIVERSION REPORTS ARE NOT REQUIRED NOR ANY LEED
PROCESSES OR PAPERWORK.
APPROVED METAL ITEMS:
5. METAL STUDS, DOOR FRAMES, DOOR HARDWARE, CEILING GRID,
LIGHT BOX FIXTURES, METAL CABINETS, METAL PLUMBING FIXTURES,
ELECTRICAL AND DATA WIRING/CONDUIT, HVAC COMPONENTS,
AND ELECTRICAL/DATA/SWITCH BOXES
CARPET RECYCLING:
6. CONTACT KRUSE CARPET RECYCLING (AT LEAST 48 HOURS PRIOR
TO DECONSTRUCTION STARTING) TO SCHEDULE DROP OFF OF
DUMPSTER AND/OR COORDINATE PICK UP OF ALL CARPET BEING
REMOVED (BROADLOOM AND CARPET TILE). COORDINATE
REQUIREMENTS WITH SUSAN SHAFER (317) 337-1950. DEMOLITION
CREW IS NOT RESPONSIBLE FOR KRUSE SERVICE FEES AND WILL
ALSO RECOGNIZE A SAVINGS BY NO LONGER PAYING
HAULING/TIPPING FEES ON CARPET DISPOSAL WITH WASTE
HAULER.
7. KRUSE WILL PROVIDE AN ON-SITE BIN ON DAYS REQUIRED.
DEMOLITION CREW IS TO PLACE CARPET DIRECTLY INTO BIN; DOES
NOT NEED TO BE PALLETIZED. CONTRACTOR IS RESPONSIBLE FOR
KEEPING BINS CLEAN AND DRY AS TO NOT CONTAMINATE
CONTENTS.
8. KRUSE PICK UP AND RECYCLING FEES ARE TO BE PAID THROUGH
SCHOTT DESIGN'S "NO COST ADD PROGRAM". CARPET
MANUFACTURER IS TO PAY $1.00 PER SQUARE YARD FOR CARPET
RECYCLING BY REDUCING PRICE OF CARPET MATERIAL BY $1.00.
FLOORING CONTRACTOR IS RESPONSIBLE FOR DEDUCTING
MATERIAL PRICE AND PAYING $1.00 PER SQUARE YARD TO KRUSE.
CONTACT EMILY HILLYER (317) 762.7840 AT SCHOTT DESIGN FOR ANY
QUESTIONS REGARDING THE RECYCLING PROCESSES.
SALVAGE FOR
RELOCATION
schottXchange PICKUP
(SEE RECYCLING NOTES)
schottXchange:
9. CONTACT schottXchange BEFORE DEMOLITION OF ITEMS THAT
CANNOT BE RECYCLED OR SALVAGED FOR LANDLORD.
schottXchange CONSIDERS: DOORS, GLASS WINDOW SYSTEMS,
CABINETS, DECORATIVE LIGHTS, AND FURNITURE. IF ITEMS ARE
ACCEPTED FOR OUR INVENTORY, COORDINATE PICKUP AFTER
DEMOLITION WITH EMILY HILLYER (317) 762.7840 AT
schottXchange AT NO COST TO THE PROJECT.
AREA NOT IN CONTRACT
AREA OF WORK
09/16/21