Loading...
HomeMy WebLinkAboutA301 FIRST FLOOR FURNITURE PLANVEHICLE DISPLAY 102 RECEPTION 101 CONSULTATION AREA 105 INFORMATION CENTER 106 FEATURE VEHICLE 104 CONSULTATION AREA 103 VESTIBULE 100 COVERED OUTDOOR DISPLAY 000 OFFICE 107 SALES MANAGER 108 GENERAL MANAGER 110 STORAGE 111 UTILITY ROOM 112 WOMEN'S 113 MEN'S 114 HALL 116 CUSTOMER'S LOUNGE 117 BDC 118 OFFICE 122 HALL 119 HALL 115 OFFICE 121 OFFICE 120 F&I MANAGER 109 COVERED OUTDOOR DISPLAY 000 STAIR 129 STAIR 130 129 125 129A 129B 109 118B 118A 130A 130B 107 119 2 1 3 2 3 100A100B NEW CAR DELIVERY 131 MECH. 123 F & I WAITING 132 PARTS BOUTIQUE 137 DETAIL 139 SERVICE 138 F & I 124 F & I 125 F & I 127 HALL 126 F & I 128 F & I 129 NEW CAR DELIVERY 130 F & I 134 NEW CAR DELIVERY 136 NEW CAR DELIVERY 135 128 124 135136 134 130131 126 127 C D E F G H J K L E.8 F.2 F.8 G.2 12 13 14 1511 15.1 15.5 A 301FIRST FLOORFURNITUREPLAN0' 5' 15' 1 HONDA DEALERSHIP ENLARGED FIRST FLOOR FURITURE PLAN SCALE: 1/8" =1'-0"A100 A301 Copyright © 2018: This document and the subject matter contained herein is proprietary and may notbe reproduced without the written permission of TDG Architects, LLC.Drawing TitleDrawing Number 18-840.01 Project Number © COPYRIGHT 2018 TDG Architects HONDA NEW CARDEALERSHIP REMODELPENSKE AUTOMOTIVE GROUP2555 S. Telegraph RoadBloomfield Hills MI 4830279 Oakland AvenueP.(248) 874-1420Pontiac, Michigan 48342F. (248) 758-9926TDGArchitects.com 4140 East 96th Street,Carmel IN 46240Revision Schedule Date DescriptionClientProjectAutomotive Drawn By: Checked By: 12/4/18 cleint review 12/28/18 HONDA review 4/5/19 REVEIW FOR PERMIT 6/26/19 permits meh bsj 10/3/19 bids 10/23/19 change-up approval 11/14/19 bza- meeting 3/18/21 approval 5/21/21 reissued for permits & bids 7/12/21 revised for permits KEY PLAN NOT TO SCALE Area Shown in Plan 09/16/21