Loading...
HomeMy WebLinkAboutA703 INTERIOR ELEVATIONSexisting desksexisting desks new door P-1P-1 RB-1 RB-1 existing door existing windows RB-1 RB-1 P-1 P-1 existing lockers RB-1 existing lockers existing desks RB-1 RB-1 P-1 P-1 tile base CTB-2 2" stainless steel rail t.v. by owner 4x4 tiles per finish schedule - pattern as illustrated p.l. cabinets 4X4 TILES PER FINISH SCHEDULE - PATTERN AS ILLUSTRATED PAINT P-1 CTB-2 P.L. CABINETS new Door soffit FIXEDFIXED EXISTING GLAZING REMAINS LINE OF FINISHED BARREL VAULT & SOFFITS CONTINUE GLAZING TO HALF ROUND - FRONT WALL ONLY NEW STOREFRONT ENTRY SYSTEM - FINISH TO MATCH EXISTING NEW STOREFRONT ENTRY SYSTEM - FINISH TO MATCH EXISTING NEW STOREFRONT POWER SL. DR. SYSTEM - FINISH TO MATCH EXISTING NEW STOREFRONT ENTRY SYSTEM - FINISH TO MATCH EXISTING NEW STOREFRONT ENTRY SYSTEM - FINISH TO MATCH EXISTING REPLACE METAL SLAT RIM & SOFFIT W/NEW SLATS EXISTING GLAZING HALF ROUND REMAINS REPLACE METAL SLAT BARREL VAULT WITH NEW METAL SLATS NEW STOREFRONT ENTRY SYSTEM - FINISH TO MATCH EXISTING REPLACE METAL SLAT BARREL VAULT WITH NEW METAL SLATS EXISTING GLAZING HALF ROUND REMAINS REPLACE METAL SLAT RIM & SOFFIT W/NEW SLATS FIXEDFIXED EXISTING GLAZING REMAINS LINE OF FINISHED BARREL VAULT & SOFFITS REPLACE METAL SLAT RIM & SOFFIT NEW STOREFRONT ENTRY SYSTEM - FINISH TO MATCH EXISTING NEW STOREFRONT ENTRY SYSTEM - FINISH TO MATCH EXISTING NEW STOREFRONT POWER SL. DR. SYSTEM - FINISH TO MATCH EXISTING NEW DOOR NEW DOOR NEW DOOR NEW DOOR NEW DOOR NEW DOOR CTB-2 PT? SOFFIT PT? PT? A 703INTERIORELEVATIONSGENERAL NOTES 1. refer to finish plan a801 for finish schemes Copyright © 2018: This document and the subject matter contained herein is proprietary and may notbe reproduced without the written permission of TDG Architects, LLC.Drawing TitleDrawing Number 18-840.01 Project Number © COPYRIGHT 2018 TDG Architects HONDA NEW CARDEALERSHIP REMODELPENSKE AUTOMOTIVE GROUP2555 S. Telegraph RoadBloomfield Hills MI 4830279 Oakland AvenueP.(248) 874-1420Pontiac, Michigan 48342F. (248) 758-9926TDGArchitects.com 4140 East 96th Street,Carmel IN 46240Revision Schedule Date DescriptionClientProjectAutomotive Drawn By: Checked By: 12/4/18 cleint review 12/28/18 HONDA review 4/5/19 REVEIW FOR PERMIT 6/26/19 permits meh bsj 10/3/19 bids 10/23/19 change-up approval 11/14/19 bza- meeting 3/18/21 approval 5/21/21 reissued for permits & bids 7/12/21 revised for permits 1 BDC SCALE: 1/4" =1'-0"A101 A703 2 BDC SCALE: 1/4" =1'-0"A101 A703 3 BDC SCALE: 1/4" =1'-0"A101 A703 7 HALL SCALE: 1/4" =1'-0"A101 A703 4 BDC SCALE: 1/4" =1'-0"A101 A703 5 CUSTOMER'S WAITING SCALE: 1/4" =1'-0"A103 A703 6 COFFEE SCALE: 1/4" =1'-0"A101 A703 8 VESTIBULE SOUTH WALL ELEVATION SCALE: 1/4" =1'-0" A102 A703 9 VESTIBULE EAST ELEVATION SCALE: 1/4" =1'-0" A102 A703 10 VESTIBULE NORTH WALL ELEVATION SCALE: 1/4" =1'-0" A102 A703 11 VESTIBULE WEST ELEVATION SCALE: 1/4" =1'-0"A102 A703 09/16/21