Loading...
HomeMy WebLinkAboutS302 FOUNDATION SCHEDULES, SECTIONS & DETAILS1 2 COLUMN & FOOTING FOOTING PER PLAN ANCHOR RODS PER COLUMN SCHED AND COLUMN BASE DETAIL FILL W/ CONCRETE ISOLATION JOINT AT BRACE CONTROL JOINT, TYP COLUMN PER PLAN 1/2" EXP JT MATERIAL T/SLAB PER PLAN T/FTG PER PLAN 3" CLR4" MINBRACE PER PLAN EXTEND ISOLATION JOINT TO ENCOMPASS ENTIRE PORTION OF BRACE AT/BELOW CONCRETE SURFACE ISOLATION JOINT BRACE PER PLAN CONCRETE INFILL CONCRETE INFILL CONCRETE INFILL CONCRETE INFILL 1/2" EXP JT MATERIAL CONTROL JOINT, TYP COLUMN PER PLAN EDGE OF SLAB 1/2" EXP JT MATERIAL EDGE OF SLAB EDGE OF SLAB COLUMN PER PLAN NOTES: COLUMN & FOOTING FOOTING PER PLAN ANCHOR RODS PER COLUMN SCHEDULE AND COLUMN BASE DETAIL FILL W/ CONCRETE ISOLATION JOINT T/SLAB PER PLAN T/FTG PER PLAN 3" CLRCONCRETE INFILL EDGE OF SLAB 1/2" EXP JT MATERIAL CONTROL JOINT, TYP NOTE 4 NOTE 4 NOTE 4 EDGE OF SLAB 1. FOR COLUMNS PLACED AFTER SLAB-ON-GRADE, SIZE ISOLATION JOINT AS REQUIRED TO ALLOW FOR BASE PLATE INSTALLATION AND TIGHTENING OF ANCHOR RODS AND MAINTAIN NOT LESS THAN 4" MINIMUM CLEAR BETWEEN COLUMN AND ISOLATION JOINT. 2. FOR COLUMNS PLACED BEFORE SLAB-ON-GRADE, SIZE ISOLATION JOINT AS REQUIRED TO KEEP ALL ANCHOR RODS WITHIN THE ISOLATION JOINT AND MAINTAIN NOT LESS THAN 4" MINIMUM CLEAR BETWEEN COLUMN AND ISOLATION JOINT. 3. FOR CIRCULAR ISOLATION JOINTS AT PERIMETER AND CORNERS, ANGLE OF INTERSECTION BETWEEN JOINT AND WALL TO BE A MINIMUM OF 90 DEGREES TO PREVENT RETURN OF SLAB BEHIND CIRCULAR ISOLATION JOINT. 4. WHERE EXPANSION JOINT MATERIAL IS REQUIRED BETWEEN THE TYPICAL EDGE OF SLAB-ON-GRADE AND WALL, CONTINUE THE EXPANSION JOINT MATERIAL CONTINUOUS BETWEEN THE INFILL CONCRETE AND WALL ALSO, TYPICAL. OPENING PER PLAN WALL PER PLAN #4 BAR x (OPENING + 3'-0") AT SLAB MID-DEPTH UNO (1) #4 BAR x 2'-6" AT SLAB MID-DEPTH UNO (1) #4 BAR x 2'-6" AT SLAB MID-DEPTH UNO ADDITIONAL REINFORCEMENT NOT REQUIRED AT CJ CJ WALL OPENINGS RE-ENTRANT CORNERS ADDITIONAL REINFORCING NOT REQUIRED AT CJUNOEQUNOEQ2" CLR2" CLREQ EQ SLAB EDGE OR CJ PER PLAN 2" CL R 1 1 1 1 NOTES: 1. WHERE THERE IS INSUFFICIENT ROOM TO INSTALL A STRAIGHT BAR AS SHOWN CENTERED WITH EQUAL LENGTH EACH SIDE OF THE RE-ENTRANT CORNER, PROVIDE BAR WITH A 90- OR 180- DEGREE HOOK INSTALLED ON THE SIDE WITH SHORTER EMBEDMENT. 2. FOR SLABS WITH 2 LAYERS OF REINFORCEMENT, INSTALL ADDITIONAL REINFORCEMENT AT ELEVATION OF TOP LAYER ONLY.2" CLRNOTE 1 NOTE 1 EX PRECAST WALL EX FTG FVNEW COL PER PLAN (2) #5 x 2'-0" ADHESIVE DOWELS (6" EMBED) T/FTG PER PLAN T/SLAB PER PLAN COLUMN FTG PER PLAN6"2 CLEAN SURFACE OF EXISTING FOOTING PRIOR TO PLACEMENT OF NEW FOOTING THICKEN NEW FTG TO MATCH BOT OF EX FTG (3) #5 ADHESIVE ANCHOR (8" EMBED) EXISTING SPREAD FOOTING T/EX FTG PER PLAN EQEQ 1 2 CONT WF REINF PER PLAN NOTE: EXISTING STEEL COLUMN AND SLAB ON GRADE NOT SHOWN FOR CLARITY Ld T/FTG PER PLAN UNIFORMLY SLOPED BASE NOTES: 1. SEE PLAN FOR STEP LOCATIONS AND ELEVATIONS. 2. MAXIMUM SINGLE STEP HEIGHT = 4'-0". FOOTING PER PLAN CONT BARS CONT BARS BARS CONT SPLICE LAP 2H2 (MAX) 2H 1'-0" MIN T/FTG PER PLAN T/FTG PER PLANH2 H1HSPLICE LAP NOTE 4 SLAB DEPTH (IN) DOWEL SIZE AND SPACING 4 DOWEL BAR DIAMETER (IN) TOTAL BAR LENGTH (IN) BAR SPACING (CTR -CTR) (IN) 3/4 16 24 5-6 3/4 16 12 CONTROL JOINT CONSTRUCTION JOINT SLAB ON GRADE PER PLAN 1/4" (+/-) TOOLED JOINT SLAB ON GRADE PER PLAN COAT OR WRAP DOWEL TO PREVENT BOND SMOOTH DOWEL BAR PER TABLE. INSTALL AT MID-DEPTH OF SLAB, UNO.SEE PLANDSEE PLANDD/4APPLY CURING COMPOUND TO FACE OF SLAB AFTER REMOVAL OF EDGE FORM CMU WALL & REINF PER PLAN HOOKED DOWEL, SIZE AND SPACING TO MATCH VERTICAL REINFORCING LAP SPLICE PER MASONRY LAP SPLICE CHART, UNO 1/2" EXP JT MATL, TYP EXIST SLAB FTG PER PLAN 3" CLRT/SLAB PER PLAN #4 x 1'-4" @ 24" OC DRILL & GROUT 0'-8" INTO EXISTING SLAB SAWCUT, REMOVE & REPLACE EXISTING SLAB AS REQUIRED TO CONSTRUCT FOOTING & WALL (SLAB THICKNESS TO MATCH EXISTING) NOTE: REINFORCE NEW SLAB-ON-GRADE CONCRETE WITH WWR PER SLAB ON GRADE SCHEDULE STAIRS BY STAIR MANUFACTURER. COORDINATE LOCATION OF THICKENED SLAB PLACEMENT WITH STAIR MANUFACTURER SUPPORT LAYOUT PRIOR TO PLACEMENT.8"1 2 #5 @ 12" OC EW BOTTOM3" CLRT/FTG PER PLAN MINIMUM 2'-0" WIDE THICKENED SLAB CENTERED ON SUPPORTED ELEMENT, UNO. PROVIDE THICKENED SLAB MINIMUM 1'-0" PAST STAIR SUPPORT EACH SIDE, UNO 2 Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 05/20/2021 7/2/2021 5:07:03 PMS302 FOUNDATION SCHEDULES, SECTIONS, AND DETAILS 2021.00173 07/02/2021 CONSTRUCTION DOCUMENTS ARTISTIC COMPOSITE PALLETS -PHASE 2 4518 WEST 99TH STREET CARMEL, IN 46032 N.T.S. S302 1 COLUMN ISOLATION JOINT AT BRACED FRAME N.T.S.S302 3 TYPICAL STEEL COLUMN ISOLATION JOINT DETAILS N.T.S.S302 2 TYPICAL ADDITIONAL SLAB ON GRADE REINFORCEMENT AT RE-ENTRANT CORNERS N.T.S.S302 4 SECTION N.T.S.S302 6 SECTION N.T.S. S302 8 TYPICAL STEPPED FOOTING N.T.S.S302 9 TYPICAL SLAB ON GRADE JOINTS 1 N.T.S.S302 10 THICKENED SLAB AT STAIRS NOT USED NOT USED 2 2 REVISION SCHEDULE NO. DESCRIPTION DATE 1 ADDENDUM 1 05/20/2021 2 ADDENDUM 2 07/02/2021 09/16/21