Loading...
HomeMy WebLinkAboutS303 FOUNDATION SCHEDULES, SECTIONS & DETAILSSEE PLAN SEE PLAN #6 BARS @ 8" TRANSVERSE TOP #6 BARS @ 12" TRANSVERSE BOTSEE PLANSEE PLAN (6) #6 BARS LONGITUDINAL TOP (3) #6 BARS LONGITUDINAL BOT (8) #6 BARS LONGITUDINAL TOP (4) #6 BARS LONGITUDINAL BOT SEE PLAN SEE PLAN(6) #6 BARS LONGITUDINAL TOP (3) #6 BARS LONGITUDINAL BOT #6 BARS @ 8" TRANSVERSE TOP #6 BARS @ 12" TRANSVERSE BOT (8) #6 BARS LONGITUDINAL TOP (4) #6 BARS LONGITUDINAL BOT SEE PLAN SEE PLAN Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: 05/20/2021 7/2/2021 5:07:03 PMS303 FOUNDATION SCHEDULES, SECTIONS, AND DETAILS 2021.00173 07/02/2021 CONSTRUCTION DOCUMENTS ARTISTIC COMPOSITE PALLETS -PHASE 2 4518 WEST 99TH STREET CARMEL, IN 46032 N.T.S.S303 2 COMBINED FOOTING 2 N.T.S.S303 1 COMBINED FOOTING 1 2 REVISION SCHEDULE NO. DESCRIPTION DATE 2 ADDENDUM 2 07/02/2021 09/16/21