Loading...
HomeMy WebLinkAboutA212 - OVERALL EXTERIOR ELEVATIONSMATERIAL LEGEND# FB1 FCP1 MR FACE BRICK - COLOR 1 FACE BRICK - COLOR 2 FIBER CEMENT VERTICAL PANEL WITH REVEALS - COLOR 1 FIBER CEMENT VERTICAL PANEL WITH REVEALS - COLOR 2 FIBER CEMENT TRIM FIBER CEMENT FASCIA METAL BALCONY RAILING METAL CANOPY METAL STAIR: SEE A133 FCT FCF PAINT COLOR SCHEME NOTE: ALL PAINTS TO BE STANDARD SHERWIN WILLIAMS EXTERIOR PAINT COLORS COLOR 1 SHERWIN WILLIAMS SW 7022 ALPACA GENERAL ELEVATION NOTES 1. FINISH FLOOR ELEVATIONS SHOWN ON EXTERIOR ELEVATIONS AND SECTIONS ARE TO TOP OF SLAB ON GRADE AND TO TOP OF FLOOR SHEATHING AT WOOD FRAMED FLOORS. 2. ALL EXTERIOR VENTS AND TRIM BEHIND VENTS TO BE PAINTED TO MATCH COLOR OF SURROUNDING MATERIAL. 3. CONTROL JOINTS FB2 FCP2 COLOR 2 SHERWIN WILLIAMS SW 7018 DOVETAIL COLOR 3 SHERWIN WILLIAMS SW 7048 URBANE BRONZE ALL TRIM & FASCIA BOARD INCLUDING AT PARAPETS TO BE PAINTED COLOR 3. ALL METAL COPINGS TO BE PREFINISHED TO MATCH. ALL PAINT COLORS TO BE MOCKED UP ON SITE FOR ARCHITECT AND OWNER FINAL APPROVAL. MC MS FIRST FLOOR EL: 0' -0" SECOND FLOOR EL: 12' -0" FOURTH FLOOR EL: 36' -0" THIRD FLOOR EL: 24' -0" TRUSS BEARING EL: 46' -0" W6 W6 W9 W9 W9 W11 W11 W5L W5RW5R W5L W5L W5RW5R W5L W5L W5R FB1 FB2 FCF FCT FCT FCFFCT FCP1 FCF FB2 FCT FB2 FB2 FCP2 FCT FCP1 FCF FB2 FCT FB2 FB1 MS 4 A301 FCP2 FIRST FLOOR EL: 0' -0" SECOND FLOOR EL: 12' -0" FOURTH FLOOR EL: 36' -0" THIRD FLOOR EL: 24' -0" TRUSS BEARING EL: 46' -0" W6 W6 W4 W13 W13 W15 W15 W12 W12 W12 W14L W14R W14L W14R W14L W14R W14L W14R FCF FCT MS FCP1 FCF FB2 FB1 FB1 FCT FB2 FCP2 FCP1 FCF FCT MR FCP2 FCT FCT FCP2 MC FB2 FCP2 3 A301 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20022 NOVEMBER 11, 2020 100% CONTRACT SET A212OVERALL EXTERIORELEVATIONSMAGNOLIACONDOMINIUMSCARMEL, INSCALE: 3/16" = 1'-0"1 Back Elevation SCALE: 3/16" = 1'-0"2 SIDE ELEVATION # DESCRIPTION DATE 1 100% CONTRACT SET 11-11-2020 2 REVISION 1 01-15-2021 3 REVISION 2 02-26-2021 4 ASI-01 09-03-21 4 09/22/21