Loading...
HomeMy WebLinkAboutG002 - SITE PLAN17'-6"17'-6" 22'-1" 17'-6" 23'-7" 23'-7" 14'-5 1 2" 14'-5 12" 14'-512"14'-512" 14'-51 2" 14'-5 12"23'-4" ARCHITECTCLIENT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20022 NOVEMBER 11, 2020 # DESCRIPTION DATEMAGNOLIACONDOMINIUMSCARMEL, IN100% CONTRACT SET GC/CM G002SITE PLAN 1. ARCHITECTURAL SITE PLAN IS FOR REFERENCE ONLY, SEE CIVIL DRAWINGS FOR COMPLETE SITE PACKAGE. REFERENCE CIVIL DRAWINGS FOR FINISH FLOOR BENCHMARK ELEVATIONS. 2. SEE ELECTRICAL SITE PLAN FOR SITE LIGHTING TYPES AND LOCATIONS SITE PLAN NOTES NORTH SCALE: 01 ARCHITECTURAL SITE PLAN 1" = 20' 4 4 4 4 4 4 BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4 BUILDING 5 BUILDING 6 CITY CENTER DR.S. RANGELINE RD.EXISTING ACE HARDWARE (FUTURE APARTMENTS) STORM DRAIN AND PIPE SYSTEM. REFER TO CIVIL FOR MORE INFORMATION. WATER LINES. REFER TO CIVIL FOR MORE INFORMATION. RISER ROOM LOCATION, SEE PLUMBING DRAWINGS. METER CENTER LOCATON, SEE ELECTRICAL AND ARCHITECTURAL DRAWINGS. SANITARY LINES. REFER TO CIVIL FOR MORE INFORMATION. ELECTRICAL TRANSFORMER LOCATION, SEE CIVIL FOR MORE INFORMATION. GAS UTILITY LINE, SEE CIVIL FOR MORE INFORMATION. SITE PLAN LEGEND 1 2 3 4 PHASE 2PHASE 1PHASE 2 PHASE 1 PHASE 2PHASE 133 3 3 33 12 1 1 5 5 5 6 6 6 6 7 1 5 5 5 2 2 2 22 7 7 7 7 7 7 7 09/22/21