HomeMy WebLinkAboutG002 - SITE PLAN17'-6"17'-6" 22'-1" 17'-6" 23'-7" 23'-7"
14'-5 1 2" 14'-5 12"
14'-512"14'-512"
14'-51 2" 14'-5 12"23'-4" ARCHITECTCLIENT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20022
NOVEMBER 11, 2020
# DESCRIPTION DATEMAGNOLIACONDOMINIUMSCARMEL, IN100% CONTRACT SET GC/CM
G002SITE PLAN 1. ARCHITECTURAL SITE PLAN IS FOR REFERENCE
ONLY, SEE CIVIL DRAWINGS FOR COMPLETE
SITE PACKAGE. REFERENCE CIVIL DRAWINGS
FOR FINISH FLOOR BENCHMARK ELEVATIONS.
2. SEE ELECTRICAL SITE PLAN FOR SITE LIGHTING
TYPES AND LOCATIONS
SITE PLAN NOTES
NORTH SCALE:
01 ARCHITECTURAL SITE PLAN
1" = 20'
4 4
4
4
4 4
BUILDING 1 BUILDING 2
BUILDING 3 BUILDING 4
BUILDING 5 BUILDING 6
CITY CENTER DR.S. RANGELINE RD.EXISTING
ACE HARDWARE
(FUTURE APARTMENTS)
STORM DRAIN AND PIPE SYSTEM. REFER TO
CIVIL FOR MORE INFORMATION.
WATER LINES. REFER TO CIVIL FOR MORE
INFORMATION.
RISER ROOM LOCATION, SEE PLUMBING
DRAWINGS.
METER CENTER LOCATON, SEE ELECTRICAL AND
ARCHITECTURAL DRAWINGS.
SANITARY LINES. REFER TO CIVIL FOR MORE
INFORMATION.
ELECTRICAL TRANSFORMER LOCATION, SEE CIVIL
FOR MORE INFORMATION.
GAS UTILITY LINE, SEE CIVIL FOR MORE
INFORMATION.
SITE PLAN LEGEND
1
2
3
4
PHASE 2PHASE 1PHASE 2
PHASE 1 PHASE 2PHASE 133
3 3
33
12
1
1
5
5
5
6
6
6
6
7
1
5
5 5
2 2
2
22
7 7
7 7
7 7
7
09/22/21