Loading...
HomeMy WebLinkAboutM100 HVAC & PLUMBING FLOOR PLANSS HSS SHS HS F.E.C.C 4 5 6 C2 DD EXISTING TO REMAIN RTU ABOVE 250 CFM 10" DIA 250 CFM 10" DIA 250 CFM 10" DIA 175 CFM 8" DIA 75 CFM 6" DIA 250 CFM 10" DIA 250 CFM 10" DIA 250 CFM 10" DIA 250 CFM 10" DIA 250 CFM 10" DIA C 4 5 6 OPEN AREA 100 LABORATORY 101 OFFICE 103 UTILITY CLOSET 104 TOILET 105 HALL 102 103A104A105AETRETRWH ABOVE CONNECT TO EXISTING WATER LAV WC LAV MOP 4" V THROUGH ROOF 2" 4" 3" 2" C.O. TO EXISTI N G WA S TE MAIN COLD WATER HOT WATER SOIL & WASTE (B.G.) 1. THE PLUMBER WILL SUPPLY AND INSTALL A WATER PRESSURE REGULATOR ON INCOMING WATER SUPPLY. THE PLUMBER WILL SET THE REGULATOR NOT TO EXCEED 65 PSI. 2. THE PLUMBER WILL SUPPLY AND INSTALL SEPARATE MANUAL SHUT-OFF VALVES ON ALL SINKS AND OUTLETS REQUIRING WATER. 3. ALL SINKS AND FAUCETS WILL BE CONNECTED BY THE PLUMBER. 4. ALL PIPES WILL BE CONCEALED WITHIN THE WALLS, CEILING, AND/OR FLOOR, UNLESS OTHERWISE NOTED. 5. ALL PIPES WILL BE FLUSHED CLEAR OF ALL DEBRIS BY THE PLUMBER. 6. THE PLUMBER WILL SUPPLY AND INSTALL ANY AND ALL MATERIALS INDICATED IN THE PLUMBING DRAWINGS AND THE MANUFACTURER'S INSTALLATION INSTRUCTION SHEETS. 7. THE PLUMBER WILL PROVIDE AND INSTALL ALL WATER SAFETY DEVICES (I.E. CHECK VALVES, BACKFLOW PREVENTERS, ETC.) IN ACCORDANCE WITH LOCAL CODE. 24 x 24 SQUARE CEILING DIFFUSERS STEEL, ROUND NECK, LAY IN T-BAR 24 x 24 OR 24 x 12 EGG CRATE RETURN, LAY IN T-BAR CEILING MOUNT EXHAUST / VENTILATION 1. THESE CONTRACT DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHALL ALL POSSIBLE CONDITIONS. IT IS INTENDED THA A COMPLETE HVAC SYSTEM BE PROVIDED WITH ALL NECESSARY EQUIPMENT, APPURTENANCES, AND CONTROLS. COMPLETELY COORDINATED WITH ALL DISCIPLINES. A PARAMETERS GIVEN IN THESE DOCUMENTS SHALL BE STRICTLY CONFORMED WITH FURNISHED ALL ITEMS AND LABOR REQUIRED FOR A COMPLETE HVAC SYSTEM IN ACCORDANCE WITH ALL APPLICABLE CODES AND STANDARDS. 2. SCOPE OF WORK FOR THE PROJECT SHALL CONSIST OF PROVIDING ALL LABOR, MATERIAL, EQUIPMENT, HOISTING AND OTHER ITEMS AS NECESSARY FOR A COMPLETE OPERATIONAL HVAC SYSTEM. 3. NO EQUIPMENT SHALL BE OPERATED DURING CONSTRUCTION UNTIL SUCH TIME AS CONTRACTOR IS NOTIFIED THAT SYSTEMS ARE READY TO BE STARTED FOR FINAL DELIVERY TO THE OWNER. 4. DUCTWORK SHALL BE GALVANIZED STEEL, FABRICATED AND ISNTALLED IN ACCORDANCE WITH SMACNA DUCT CONSTRUCTION STANDARDS. SEALL ALL LANGITUDINAL AND TRANSVERSE DUCT SEAMS. SEALANT SHALL BE DESIGNED FOR OPERATING TEMPERATURES UP TO 500 DEGREES FARENHEIT. 5. BALANCING TAMPERS SHALL BE PROVIDED FOR BALANCING OF SUPPLY AND OUTDOOR AIR. 6. ALL WORK SHALL BE WARRANTED FOR A PERIOD OF ONE YEAR BY THE CONTRACTOR. 7. AIR HANDLING UNITS AND CONDENSING UNITS ARE EXISTING. CONTRACTOR SHALL INSPECT EQUIPMENT FOR PROPER OPERATION AND MAKE ADJUSTMENTS AS REQUIRED. 8. HVAC DIFFUSER LAYOUT SHOWN IN THESE PLANS IS FOR DESIGN PURPOSES ONLY AND IS A SUGGESTED LAYOUT. DIFFUSERS MAY BE RELOCATED TO AVOID CONFLICT WITH LIGHTING AND OTHER EQUIPMENT. www.studio3design.net Phone: (317) 595.1000 8604 Allisonville Road, Suite 330 Indianapolis, IN 46250 A B C D E 1 2 3 4 5 6 7 A B C D E THESE DRAWINGS ARE THE PROPERTY OF STUDIO 3 DESIGN, INC. ALL RIGHTS RESERVED PROJECT NUMBER: DATE: CERTIFICATION: SHEET DESCRIPTION: SHEET NUMBER: REVISION SCHEDULE: 1 2 3 4 5 6 7 21046 08-19-21 HVAC & PLUMBING FLOOR PLANS M100Carmel OverlookSTEMTREE LEARNING CENTER5790 E. Main StreetCarmel, IN 46033NORTH 1/4" = 1'-0"M100 NEW HVAC PLAN4E NORTH 1/4" = 1'-0"M100 NEW PLUMBING FLOOR PLAN1E NOT TO SCALEM100 PLUMBING RISER7E PLUMBING LEGEND PLUMBING NOTES HVAC SCHEDULE HVAC NOTES # Revision Description Date Issued 09/22/21