Loading...
HomeMy WebLinkAboutSTEMTREE_A001_Revision1_09-20-2021F.E.C.GFI GFI> >> > >> >> > > > > > > > > >> >> >> >> > > > > >> >> BUILDING / EXTERIOR ELEVATION REFERENCE ELEVATION REF. SHEET REF. WINDOW REFERENCE A ELEVATION OR WORK POINT ?NORTH ORIENTATION REFERENCE DOOR SYMBOL ? ?ROOM IDENTIFICATION WALL TYPE 1 PLAN KEY NOTE DEMOLITION PLAN KEY NOTE NEW DOOR / RELOCATED DOOR EXISTING DOOR DEMO DOOR / WALL DEMO EXISTING WALL NEW WALL EXISTING WALL TO BE REMOVED PARTIAL HEIGHT WALL 5C A600 DETAIL REFERENCE 1 A 1E A200 3E A600 INTERIOR ELEVATION REFERENCE ELEVATION REF. SHEET REF. NEW WALL CONSTRUCTION SECTION REFERENCE ELEVATION REF. SHEET REF. 1E A200 73 '-0" TRAVEL DISTANCEFEC EXT 1 OCCUP. OPEN AREA 100 CLASSROOM FUNCTION = 20 OCCUP./SF 718 SF / 20 = 36 OCCUP. LABORATORY 101 SHOP/VOCATIONAL FUNCTION = 50 OCCUP./SF 336 SF / 50 = 7 OCCUP. FIRE EXTINGUISHER LOCATIONS EXTE BUILDING EXIT FEC PATH OF EGRESS APPLICABLE CODES: 2014 INDIANA BUILDING CODE (2012 INTERNATIONAL BUILDING CODE) 2010 INDIANA ENERGY CONSERVATION CODE (675-ISE 19-4) 2014 INDIANA FIRE CODE (2012 INTERNATIONAL FIRE CODE) 2012 INDIANA PLUMBING CODE (2006 INDIANA PLUMBING CODE WITH 2012 AMENDMENTS) 2009 INDIANA ELECTRICAL CODE (2008 NFPA 70) 2014 INDIANA MECHANICAL CODE (2012 INTERNATIONAL MECHANICAL CODE) 2014 INDIANA FUEL GAS CODE (2012 INTERNATIONAL FUEL GAS CODE) 2000 LIFE SAFETY CODE (NFPA 101) PROJECT LOCATION: 5790 E. MAIN STREET CARMEL, IN 46033 OCCUPANCY: E OCCUPANCY (SEC. 309.1) SQUARE FOOTAGE: 12,677 SF EXISTING BUILDING 1,645 SF REMODELED HEIGHT: BUILDING IS 1 STORIES WIDTH OF EXITS: EXIT DOOR WIDTH PROVIDED AT THE RATE OF 0.15 INCHES PER OCCUPANT. (SEC. 1005.2.3) CONSTRUCTION TYPE: TYPE II-B FIRE SUPPRESSION SYSTEM: PROJECT AREA: FULL SPRINKLER SUPPRESSION SYSTEM FIRE RESISTIVE CORRIDORS: NOT REQUIRED SMOKE RESISTIVE CORRIDOR DOORS: NOT REQUIRED HAZARDOUS ROOMS: NONE IN PROJECT EXIT ACCESS TRAVEL DISTANCE: EXIT ACCESS TRAVEL DISTANCE: NOT TO EXCEED 300 FEET. DEAD END EXIT ACCESS: NOT TO EXCEED 50 FEET. OCCUPANT LOAD: OPEN AREA 100 = 36 OCCUPANTS LABORATORY 101 = 7 OCCUPANTS OFFICE 103 = 1 OCCUPANTS TOTAL = 44 OCCUPANTS (10 EMPLOYEES + 34 PUBLIC) PLUMBING COUNT: RESTROOMS - 1 UNISEX TOILET PROVIDED ALARMS / FIRE DETECTION: AUTOMATIC FIRE DETECTION REQUIRED ACCESSIBILITY: PER BUILDING OCCUPANCY / ANSI REQUIREMENTS 1 60" MIN.18" FRONT APPROACH, PULL SIDE 48" MIN.12" MIN.* NOTE: *IF BOTH A LATCH & CLOSER ARE PROVIDED YX NOTE: X = 36" MIN. IF Y = 60"; X = 42" MIN. IF Y = 54"48" MIN.24" NOTE: Y = 54" MIN. IF DOOR HAS CLOSERY 42" MIN.**12" MIN.* NOTE: *IF BOTH CLOSER AND LATCH ARE PROVIDED. **48" MIN. IF BOTH CLOSER AND LATCH PROVIDED. . 42" MIN.*24" MIN. HINGE APPROACH, PULL SIDE LATCH APPROACH, PULL SIDE FRONT APPROACH, PUSH SIDE HINGE APPROACH, PUSH SIDE LATCH APPROACH, PUSH SIDE 22" MIN.* NOTE: *48" MIN. IF CLOSER IS PROVIDED. 40" MAX.NOTE: SEE SPECIFICATIONS FOR ADDITIONAL MOUNTING HEIGHTS. TELEPHONE MIRROR TO BOTTOM OFREFLECTINGSURFACEDIAPER DISPENSER OR SANITARY NAPKIN DISPENSER SOAP DISPENSER FIRE EXTINGUISHER CABINET (MAX. 4" PROJECTION)48" MAX.27" MIN.*SEE GUIDELINES FOR MOUNTING HEIGHTS AT GRAB BARS. NOTE: MOUNT ALL NON-HANDICAP ACCESSORIES ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.WHEELCHAIRACCESSIBLEELECTRIC WATER COOLER 34" MAX.SURFACE33" TO CHANGINGSTANDING HGT.38" - 43"GRAB BAR 33" - 36"ELECTRIC HAND DRYER SANITARY NAPKIN DISPOSAL* WASTE RECEPTACLE / PAPER TOWEL DISPENSER S T E 15" MIN.TO OPERABLE PARTS44" - 48"TO OPERABLE PARTS48".E 46" MAX.THERMOSTAT SWITCH ELEC. OUTLET ABOVE 25" DEEP COUNTER BABY CHANGING STATION www.studio3design.net Phone: (317) 595.1000 8604 Allisonville Road, Suite 330 Indianapolis, IN 46250 A B C D E 1 2 3 4 5 6 7 A B C D E THESE DRAWINGS ARE THE PROPERTY OF STUDIO 3 DESIGN, INC. ALL RIGHTS RESERVED PROJECT NUMBER: DATE: CERTIFICATION: SHEET DESCRIPTION: SHEET NUMBER: REVISION SCHEDULE: 1 2 3 4 5 6 7 21046 08-19-21 INFORMATION SHEET & LIFE SAFETY PLAN A001Carmel OverlookSTEMTREE LEARNING CENTER5790 E. Main StreetCarmel, IN 46033GENERAL PROJECT NOTES CONTRACTOR'S RESPONSIBILITIES: 1. SHOULD THERE BE ANY QUESTIONS REGARDING THE CONTRACT DOCUMENTS, EXISTING CONDITIONS, AND/OR DESIGN INTENT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A CLARIFICATION FROM THE ARCHITECT PRIOR TO BID SUBMITTAL PRIOR TO PROCEEDING WITH ANY WORK, OR RELATED WORK IN QUESTION. 2. THESE CONTRACT DOCUMENTS ARE INTENDED TO DESCRIBE ONLY THE SCOPE AND APPEARANCE OF THE REAL PROPERTY IMPROVEMENTS, INCLUDING THE PERFORMANCE AND LEVEL OF QUALITY EXPECTED OF ITS COMPONENTS. IT IS INCUMBENT UPON THE CONTRACTOR TO INSURE THAT ALL WORK COMPLETED AND MATERIALS INSTALLED BE IN FULL COMPLIANCE, AS A MINIMUM STANDARDS, WITH ALL APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING JURISDICTION. 3. THESE CONTRACT DOCUMENTS DO NOT ATTEMPT TO INSTRUCT THE CONTRACTOR IN THE DETAILS OF HIS TRADE. THEY ARE PERFORMANCE SPECIFICATIONS IN THAT THEY DO REQUIRE THAT ALL MANUFACTURED ITEMS, MATERIALS AND EQUIPMENT BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDED SPECIFICATIONS, EXCEPT IN THE CASE WHERE THE CONTRACT DOCUMENTS ARE MORE STRINGENT. ANY MISCELLANEOUS ITEMS OR MATERIALS NOT SPECIFICALLY NOTED, BUT REQUIRED FOR PROPER INSTALLATION SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR(S) RESPONSIBLE FOR THE AFFECTED PORTION OF WORK. 4. ALL WORK SHALL BE WARRANTED SATISFACTORY, IN MATERIALS AND WORKMANSHIP, FOR A MINIMUM PERIOD OF ONE (1) YEAR, OR FOR THE PERIOD OF WARRANTY CUSTOMARY, OR STIPULATED FOR, THE TRADE, CRAFT, OR PRODUCT, WHICHEVER IS LONGER. THEREFORE, ONLY COMPETENT MECHANICS CAPABLE OF PRODUCING GOOD WORKMANSHIP CUSTOMARY TO THE TRADE SHALL BE USED. 5. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER, OR THE AUTHORIZED, AGENT, TO DETERMINE ALL EXISTING MATERIALS TO BE SALVAGED AND RETAINED BY THE OWNER. THE CONTRACTOR SHALL REMOVE SALVAGEABLE MATERIALS FROM THE SPACE AND STORE IN A LOCATION AS DIRECTED BY THE OWNER. ALL OTHER MATERIALS, RUBBISH, AND DEBRIS, SHALL BE REMOVED AND PROMPTLY DISPOSED OF BY THE CONTRACTOR AT AN OFFSITE LOCATION. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ASSURE THAT ALL PROPERTY IMPROVEMENTS (I.E. PARTITIONS, DOORS, FRAMES, CABINETS, CEILING GRID, CEILING TILE, AND THE ELECTRICAL AND MECHANICAL DEVICES, ETC.) WHICH ARE TO REMAIN, ARE PROTECTED FROM DAMAGE OF ANY KIND. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING WORK WHICH IS TO REMAIN, AND DETERMINING WHETHER OR NOT IT CAN BE REPAIRED AND/OR RECONDITIONED TO MATCH AND BLEND WITH NEW MATERIALS AND COMPONENTS. THEY SHALL OBTAIN THE OWNER'S APPROVAL OF THE SCOPE AND LIMIT OF SAID WORK PRIOR TO STARTING CONSTRUCTION AND RECOMMEND AN ALLOWANCE IF NECESSARY. NO CHANGE ORDERS SHALL BE ACCEPTED FOR COMPLETED WORK THAT DOES NOT CONFORM TO THE STANDARDS ESTABLISHED AT THE TIME OF BID ACCEPTANCE. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING HIMSELF WITH THE PROJECT SCOPE OF WORK, BUILDING STANDARDS, SCHEDULE AND DEADLINES. THE CONTRACTOR SHALL FURTHER BE RESPONSIBLE FOR ADVISING THE OWNER OF ALL LONG LEAD TIME ITEMS AFFECTING THE PROJECT SCHEDULE AND SHALL, UPON REQUEST FROM THE OWNER, SUBMIT ORDER CONFIRMATIONS AND DELIVERY DATES FOR SUCH LONG LEAD TIME ITEMS TO THE OWNER. 8. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER ACCESS TO THE SPACE AND THE ONGOING CONSTRUCTION WORK. DISRUPTIVE OR POTENTIALLY HAZARDOUS CONSTRUCTION ACTIVITIES OCCURRING WITHIN OR ADJACENT TO OCCUPIED SPACE SHALL BE COORDINATED TO OCCUR AFTER NORMAL OFFICE HOURS, SO AS TO MINIMIZE DISTURBANCE TO BUILDING OCCUPANTS. 9. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER FOR DELIVERY TO THE SPACE OF ALL BUILDING MATERIALS, AND SHALL ARRANGE FOR USAGE OF THE FREIGHT ELEVATOR (OR SUCH ELEVATOR DESIGNATED IF APPLICABLE). IF DELIVERY OF BUILDING MATERIALS INVOLVES THE USE OF OTHER FACILITIES, THE CONTRACTOR SHALL COORDINATE SUCH ACTIVITIES IN SUCH A MANNER WHICH POSES NO HAZARD TO ANY PERSONNEL WITHIN OR AROUND THE BUILDING OR BUILDING SITE. 10. ALL CONTRACTOR OR SUPPLIER REQUESTS FOR SUBSTITUTIONS OF SPECIFIED ITEMS SHALL BE SUBMITTED IN WRITING ACCOMPANIED BY THE ALTERNATIVE PRODUCT INFORMATION TO THE ARCHITECT. ALL SUBSTITUTIONS SHALL BE SUBMITTED TO THE ARCHITECT, NO LATER THAN (10) WORKING DAYS PRIOR TO BID OPENING DATE. SUBSTITUTIONS SHALL ONLY BE CONSIDERED IF THEY DO NOT SACRIFICE QUALITY, APPEARANCE, AND FUNCTION. UNDER NO CIRCUMSTANCES WILL THE OWNER BE REQUIRED TO PROVE THAT A PRODUCT PROPOSED FOR SUBSTITUTION IS OR IS NOT EQUAL QUALITY TO THE PRODUCT SPECIFIED. 11. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR SCALE THE DRAWINGS TO DETERMINE THE DIMENSIONS. SEE FLOOR PLAN FOR DIMENSION LOCATIONS. 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF ALL SELECTED MATERIALS WHICH SHALL BE COMPLETE IN ALL RESPECTS PRIOR TO THE FINAL ACCEPTANCE, UNLESS OTHERWISE NOTED. 13. THE CONTRACTOR SHALL BE PRESERVE ALL PRINTED INSTRUCTIONS AND WARRANTIES THAT ARE PROVIDED WITH EQUIPMENT OR MATERIALS USED, AND DELIVER SAID IN PRINTED MANNER TO THE OWNER AT THE TIME(S) DESIGNATED FOR O & M MANUAL DISBURSEMENTS. THE CONTRACTOR SHALL INSTRUCT THE OWNER OR OWNERS REPRESENTATIVE IN THE PROPER USE OF THE EQUIPMENT FURNISHED BY THEIR TRADE. 14. GENERAL CONTRACTOR IS TO PROVIDE A THOROUGH CONSTRUCTION CLEAN-UP AT CLOSE-OUT, INCLUDING VACUUMING AND CLEANING ALL CARPETING. 15. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF CUSTOM MILLWORK, CUSTOM FABRICATION OR MANUFACTURE, AND PHYSICAL SAMPLES OF ALL FINISH MATERIALS SPECIFIED TO THE ARCHITECT FOR REVIEW AND APPROVAL BY THE OWNER. SEE SPECIFICATIONS. 16. REVIEWED SHOP DRAWINGS AND SCHEDULES PREPARED BY OTHERS SHALL NOT BE CONSTRUED TO BE PART OF THE CONTRACT DOCUMENTS, AS THE ARCHITECT ASSUMES NO RESPONSIBILITY FOR DRAWINGS, SCHEDULES, AND/OR SPECIFICATIONS FOR WORK ON THE PROJECT PREPARED OR ACCOMPLISHED BY OTHERS. 17. THE ARCHITECT WILL REVIEW THE DRAWINGS AND SAMPLES SUBMITTED BY THE CONTRACTOR (FOLLOWING A REVIEW BY THE GENERAL CONTRACTOR) FOR CONFORMITY WITH THE INFORMATION CONTAINED IN THE CONSTRUCTION DOCUMENTS. 18. CONTRACTOR TO FOLLOW ALL BUILDING STANDARDS, INTERIM LIFE SAFETY MEASURES AND COORDINATE SCHEDULING OF WORK WITH AFFECTED OCCUPANTS (IF APPLICABLE) PRIOR TO STARTING. 19. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS AND NOTIFY ARCHITECT, IN WRITING, OF ALL DISCREPANCIES. CONTRACTOR TO REVIEW AND RECORD EXISTING CEILING FIELD CONDITIONS, LIGHT FIXTURE AND MEP SUPPLY/RETURN LOCATIONS, SPRINKLER HEADS, AND ALL OTHER CEILING ITEMS LOCATIONS PRIOR TO CONSTRUCTION. DISCREPANCIES IN THIS INFORMATION SHALL BE RECORDED IN THE CONSTRUCTION FIELD SET. 20. THE GENERAL CONTRACTOR AND EACH TRADE IS RESPONSIBLE FOR REVIEWING AND COORDINATING ALL NEW WORK WITH ALL EXISTING CONDITIONS AND WITH ALL OTHER TRADES. 21. ALL CONSTRUCTION TO MEET CURRENT NATIONAL, STATE AND LOCAL CODES, ORDINANCES AND ADA REGULATIONS. 22. PREP ALL WALL SURFACES TO RECEIVE NEW PAINT OR WALL COVERING FINISH. PATCH ALL EXISTING HOLES IN AREAS TO RECEIVE NEW FINISHES. SAND ALL NEW TO EXISTING TRANSITIONS SMOOTH PRIOR TO PAINTING. PATCH ALL AREAS WHERE RECEPTACLE OR FIXTURES ARE REMOVED. REMOVE EMERGENCY LIGHTS, SIGNAGE, THERMOSTATS, FIRE STROBES, ETC. PRIOR TO PAINTING AND REINSTALL WHEN COMPLETE. 23. UNLESS NOTED OTHERWISE, THE TERM "PROVIDE" INDICATES TO SUPPLY AND INSTALL COMPLETE, FOLLOWING MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS AND SUPPLYING AND INSTALLING ALL ASSOCIATED ITEMS AND ACCESSORIES AS REQUIRED FOR COMPLETE INSTALLATION. 24. GENERAL CONTRACTOR SHALL ACCOMMODATE TENANTS VENDORS DURING CONSTRUCTION AND WORK WITH THE OWNER TO SCHEDULE INSTALLATION OF OWNER SUPPLIED AND INSTALLED ITEMS. 25. WHERE RATED WALLS ARE INDICATED, ENTIRE WALL ASSEMBLY SHALL BE CONTINUOUS AS SHOWN OR IMPLIED ON THE CONTRACT DOCUMENTS. 26. WHERE GAUGE OF METAL STUDS ARE NOT SPECIFICALLY SHOWN OR NOTED, PROVIDE GAUGE AS INDICATED IN THE GENERAL WALL TYPE NOTES. 27. CONTRACTOR TO REVISE, ADD OR RELOCATE FIRE STROBES, SPRINKLERS, AND OTHER LIFE SAFETY DEVICES AS NECESSARY TO MEET ALL APPLICABLE CODES, MAINTAIN LIFE SAFETY AND/OR AS STIPULATED BY THE CONTRACT DOCUMENTS. 28. COMMENCEMENT OF WORK BY A CONTRACTOR OR SUBCONTRACTOR, CONSTITUTES ACCEPTANCE OF THE CONDITIONS AND SURFACES IN QUESTION. IF ANY SUCH CONDITIONS/SURFACES ARE UNACCEPTABLE, THE GENERAL CONTRACTOR SHOULD BE NOTIFIED AT ONCE BY THE SUBCONTRACTOR AND NO WORK DONE UNTIL CONDITIONS ARE ACCEPTABLE. 29. CONTRACTORS ARE TO FOLLOW ALL MANUFACTURERS RECOMMENDATIONS FOR INSTALLATION OF EQUIPMENT, MATERIALS, AND FINISHES. 31. CONTRACTOR TO PROVIDE DUST WALLS AT NECESSARY LOCATIONS. 32. TRANSPORT OF MATERIALS AND DEBRIS SHALL BE COORDINATED WITH THE FACILITY'S REPRESENTATIVES PRIOR TO THE START OF CONSTRUCTION. GENERAL NOTES 1. CONTRACTOR TO VISIT SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS PRIOR TO START OF WORK. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS AND NOTIFY ARCHITECT, IN WRITING, OF ALL DISCREPANCIES. CONTRACTOR TO DOCUMENT EXISTING FIELD CONDITIONS, LIGHT FIXTURE AND MEP SUPPLY/RETURN LOCATIONS, SPRINKLER HEADS, AND ALL OTHER CEILING ITEM LOCATIONS PRIOR TO CONSTRUCTION. THIS INFORMATION SHALL BE PROVIDED TO ARCHITECT FOR INCORPORATION INTO A CONSTRUCTION SET. 2. THE GENERAL CONTRACTOR AND EACH TRADE IS RESPONSIBLE FOR REVIEWING AND COORDINATING ALL NEW WORK WITH ALL EXISTING CONDITIONS AND WITH ALL OTHER TRADES. 3. CONTRACTOR IS RESPONSIBLE TO PATCH/REPAIR/SEAL ALL NEW & EXISTING PENETRATIONS INTO RATED WALLS TO MAINTAIN RATED ASSEMBLY. 4. ALL PENETRATIONS IN AND THROUGH FIRE AND SMOKE RATED WALLS SHALL BE SLEEVED AND FIRE STOPPED AS NECESSARY TO MAINTAIN RATINGS. 5. UNLESS NOTED OTHERWISE, THE TERM "PROVIDE" INDICATES TO SUPPLY AND INSTALL COMPLETE, FOLLOWING MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS AND SUPPLYING AND INSTALLING ALL ASSOCIATED ITEMS AND ACCESSORIES AS REQUIRED FOR COMPLETE INSTALLATION. 6. GENERAL CONTRACTOR SHALL COORDINATE ALL PHASES AND TIMING OF CONSTRUCTION WITH ARCHITECT, TENANT, AND BUILDING OWNER. 7. ALL COSTS ASSOCIATED WITH THE PROTECTION OF EXISTING FACILITIES, UTILITIES, AND STRUCTURES WITHIN THE WORK ZONE AND OR WITHIN THE PATH ESTABLISHED BY THE CONTRACTOR TO EXECUTE THE WORK SHALL BE INCORPORATED IN THE CONTRACTOR'S BASE BID. FIELD VERIFICATION PRIOR TO BID THE CONTRACTOR AND HIS SUBCONTRACTORS ARE REQUIRED TO VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS PRIOR TO THE ISSUANCE OF A BID. ALL COSTS ASSOCIATED WITH THE PROTECTION OF EXISTING FACILITIES, UTILITIES, AND STRUCTURES (BOTH ABOVE AND BELOW GRADE AND AREA OF WORK) WITHIN THE WORK ZONE AND OR WITHIN THE PATH ESTABLISHED BY THE CONTRACTOR TO EXECUTE THE WORK SHALL BE INCORPORATED IN THE CONTRACTORS BASE BID. THE CONTRACTOR SHALL NOTIFY OWNER/DESIGN PROFESSIONAL (PRIOR TO BID) OF ANY ITEMS DISCOVERED DURING FIELD VERIFICATION THAT THE CONTRACTOR FEELS REQUIRE ADDITIONAL CLARIFICATION FROM THE OWNER/DESIGN PROFESSIONAL IN ORDER TO APPROPRIATELY BID THE PROJECT. DRAFTING SYMBOLS NORTH 3/16" = 1'-0"A001 LIFE SAFETY PLAN1C CODE SUMMARY NOTES 12" = 1'-0"A001 ADA APPROACH LEGEND1E 12" = 1'-0"A001 ADA MOUNTING HEIGHTS4E # Revision Description Date Issued 1 REVISED OCCUPANCY 09-20-21 1 1 1 09/22/21