Loading...
HomeMy WebLinkAboutA107 Roof PlanProject: Developer: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: By: Sheet Title: COPYRIGHT & OWNERSHIP OF DOCUMENTS Architecture / Project Management: Project Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032800 West Monon Green BlvdPEDCOR DESIGN GROUP LLC A107 Roof Plan THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND PUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. © COPY RIGHT 2021 JAMES R. STUTZMAN, AIA, Carmel, Indiana. CONSTRUCTION DOCUMENTS #### LGA #### SCALE: NTS PLAN NORTH KEY PLAN Bldg I Revision ID Issue Date Issue Name 01 7/15/21 BP-1 Thursday, July 15, 2021, BIMcloud: pedcordesign - BIMcloud as a Service/Windsor - Building I/Building I WindsorDN.10 TR AT (11")C1 A411 3 A107 B3 A315 #DrgID #LayID 4 A107 02 02 02 02 02 03 03 04 0707 0707 0707 0707 0707 0707 0808 0808 0808 0808 0808 15 14 14 14 14 14 14 14 14 14 14 11 14 14 14 14 14 14 05 05 05 05 060606 06 06 18 18 18 18 08 17 12 05 08 17 12 08 17 12 06 08 17 12 12 23 23 23 23 23 23 23 23 11 11 11 11 11 14 11 11 24 06 2424 24 05 06 0606 0606 05 0606 05 2424 2424 2424 0606 2424 24 0808 0808 0808 24 0606 2424 24 24 0606 24 0606 06 5S21 W6K W6K W6K W6K W6K W6K W6K W6K W6K W6K W6K W6K W6K W6K W6K W6K W6K W6A W6A W6A W6A W6D W6D W6DTYP. TYP. TYP. TYP. TYP. TYP. A1 A502 A1 A502 A1 A502 A1 A502 C3 A502 C3 A502 B3 A502 B3 A502 B3 A502 C3 A502 C3 A502 B1 A502 B2 A502 C2 A502 D1 A502 A4 A305 A4 A305 A4 A305 A4 A305 A4 A305 A4 A305 A4 A305 A4 A305 A4 A305 A4 A305 A4 A305 A4 A305 A4 A305 A4 A305 A4 A305 A4 A305 A4 A305 A2 A306 A4 A305 A4 A311 A4 A311 A4 A311 A4 A311A4 A311 A4 A311 A4 A311 4'-3/4"21'-8 1/4"1'-3"4'-3/4"51'-2 3/8"36'-8 3/4"4'-3/4"1'-3"12'-1/4"4'-3/4"1'-3" 27'98'-6 5/8"17'-4"1'-3"6'-4 3/4"24'-1/4"1'-3"6'-4 3/4"13'-4 1/4"27'-7 1/4"13'-3 5/8"6'-4 3/4"1'-3"24'-1/4"6'-4 3/4"1'-3"1'-3"4'-3/4"21'-8 1/4"1'-3"4'-3/4"87'-11 1/8"4'-3/4"1'-3"12'-1/4"4'-3/4"1'-3"1'-3"6'-4 3/4"24'-1/4"1'-3"6'-4 3/4"16'-6 7/8"21'-1 3/8"16'-6 7/8"6'-4 3/4"1'-3"24'-1/4"6'-4 3/4"1'-3"31'-8"21'27'-7 1/4"20'-11 3/8"31'-8"27'98'-6 5/8"17'-4"31'-8"24'-2 5/8"21'-1 3/8"24'-2 5/8"31'-8"56'-6 1/4"42'-1/2"6'-4 3/4"4'-3/4" 51'-2 3/8"6'-4 3/4"4'-3/4"6'-4 3/4"4'-3/4"6'-4 3/4"4'-3/4"6'-4 3/4"4'-3/4"6'-4 3/4"4'-3/4"87'-11 1/8" 4'-3/4"6'-4 3/4"13'-4 1/4"27'-6 5/8"13'-4 1/4"6'-4 3/4"1'-3 3/8" 2'-10 5/8" 4'-3/4" W6D W6K W6K W6K W6K W6K W6KROOF PLAN NOTES: 1 Vent stacks, reference P series drawings. Follow roofing manufacturer's required flashing details for curbs and penetrations 2 Roof drains, reference P series drawings. 3 Standing seam metal roof, self-adhering underlayment throughout 4 Elevator vent. Follow roofing manufacturer's required flashing details for curbs and penetrations 5 Plumbing vent. Ref. P-Series drawings. Follow roofing manufacturer's required flashing details for curbs and penetrations 6 Mechanical equipment. Ref. mechanical drawings. Follow roofing manufacturer's required flashing details for curbs and penetrations 7 Polyvinyl-chloride (PVC) roofing over 5/8" gypsum recovery board, 6" rigid insulation, 6 mil. polyethylene vapor barrier, & 5/8" DensGlass sheathing 8 Tapered roofing @ 1/2":1' 9 Pre-finished metal roof edge 10 Pre-finished aluminum gutter 11 Pre-finished metal coping 12 Shaft opening below with roof curb/cap above. Ref. M-Series sheets for roof curb/cap design. 13 Break in structural roof decking requires change in insulation thickness 14 EIFS screen wall 15 PVC roofing membrane to wrap up sides of elevator shaft as well as on top of shaft 16 Stair shaft to have PVC roofing membrane on the top of the shaft as well as the west facing (short) wall. North, south and east facing walls to have an EIFS veneer. 17 Provide crickets at any mechanical curb, typ. 18 Structural framing for parapet screen wall 19 Tapered roofing @ 3/16":1' 20 Polyvinyl-chloride (PVC) roofing over 5/8" gypsum recovery board, 4 5/8"" rigid insulation, 6 mil. polyethylene vapor barrier 21 Pre-finished metal downspout w/ splash block 22 Mtl. railings and posts. Set directly on membrane roofing. Outer posts will have welded 6"x6" stl. plate. Intermediate posts will have 3/4" sq. tube welded at bot. horizontally and extending under pavers. 23 Extend insulation between trussess and to exterior wall. Ref. detail B1/A502. 24. Walkway pads. Provide clearance between adjoining pads per roofing manufacturer. ROOF PLAN NOTES:1 Vent stacks, reference P series drawings. Followroofing manufacturer's required flashing details forcurbs and penetrations2 Roof drains, reference P series drawings.3 Standing seam metal roof, self-adheringunderlayment throughout4 Elevator vent. Follow roofing manufacturer'srequired flashing details for curbs and penetrations5 Plumbing vent. Ref. P-Series drawings. Followroofing manufacturer's required flashing details forcurbs and penetrations6 Mechanical equipment. Ref. mechanicaldrawings. Follow roofing manufacturer's required flashing details for curbs and penetrations 7 Polyvinyl-chloride (PVC) roofing over 5/8" gypsum recovery board, 6" rigid insulation, 6 mil. polyethylene vapor barrier, & 5/8" DensGlass sheathing 8 Tapered roofing @ 1/2":1' 9 Pre-finished metal roof edge 10 Pre-finished aluminum gutter 11 Pre-finished metal coping 12 Shaft opening below with roof curb/cap above. Ref. M-Series sheets for roof curb/cap design. 13 Break in structural roof decking requires change in insulation thickness 14 EIFS screen wall 15 PVC roofing membrane to wrap up sides of elevator shaft as well as on top of shaft 16 Stair shaft to have PVC roofing membrane on the top of the shaft as well as the west facing (short) wall. North, south and east facing walls to have an EIFS veneer. 17 Provide crickets at any mechanical curb, typ. 18 Structural framing for parapet screen wall 19 Tapered roofing @ 3/16":1' 20 Polyvinyl-chloride (PVC) roofing over 5/8" gypsum recovery board, 4 5/8"" rigid insulation, 6 mil. polyethylene vapor barrier 21 Pre-finished metal downspout w/ splash block 22 Mtl. railings and posts. Set directly on membrane roofing. Outer posts will have welded 6"x6" stl. plate. Intermediate posts will have 3/4" sq. tube welded at bot. horizontally and extending under pavers. 23 Extend insulation between trussess and to exterior wall. Ref. detail B1/A502. 24. Walkway pads. Provide clearance between adjoining pads per roofing manufacturer. ROOF PLAN NOTES:1 Vent stacks, reference P series drawings. Followroofing manufacturer's required flashing details forcurbs and penetrations2 Roof drains, reference P series drawings.3 Standing seam metal roof, self-adheringunderlayment throughout4 Elevator vent. Follow roofing manufacturer'srequired flashing details for curbs and penetrations5 Plumbing vent. Ref. P-Series drawings. Followroofing manufacturer's required flashing details forcurbs and penetrations6 Mechanical equipment. Ref. mechanicaldrawings. Follow roofing manufacturer's requiredflashing details for curbs and penetrations7 Polyvinyl-chloride (PVC) roofing over 5/8" gypsumrecovery board, 6" rigid insulation, 6 mil.polyethylene vapor barrier, & 5/8" DensGlasssheathing8 Tapered roofing @ 1/2":1'9 Pre-finished metal roof edge10 Pre-finished aluminum gutter11 Pre-finished metal coping12 Shaft opening below with roof curb/cap above.Ref. M-Series sheets for roof curb/cap design.13 Break in structural roof decking requires change ininsulation thickness 14 EIFS screen wall 15 PVC roofing membrane to wrap up sides of elevator shaft as well as on top of shaft 16 Stair shaft to have PVC roofing membrane on the top of the shaft as well as the west facing (short) wall. North, south and east facing walls to have an EIFS veneer. 17 Provide crickets at any mechanical curb, typ. 18 Structural framing for parapet screen wall 19 Tapered roofing @ 3/16":1' 20 Polyvinyl-chloride (PVC) roofing over 5/8" gypsum recovery board, 4 5/8"" rigid insulation, 6 mil. polyethylene vapor barrier 21 Pre-finished metal downspout w/ splash block 22 Mtl. railings and posts. Set directly on membrane roofing. Outer posts will have welded 6"x6" stl. plate. Intermediate posts will have 3/4" sq. tube welded at bot. horizontally and extending under pavers. 23 Extend insulation between trussess and to exterior wall. Ref. detail B1/A502. 24. Walkway pads. Provide clearance between adjoining pads per roofing manufacturer. ROOF PLAN GENERAL NOTES: 1 Roof Plan A105 references and details the wood stud composition of all parapet walls and gables, with a cutting plane of +3' above roof deck. Details 1-3/A106 reference and detail general roof assembly with a cutting plane of +20' above roof deck 2 PVC roofing goes up the back side of all parapets and gables U.N.O. 3 Gable vents at all A & C type gables, ref. 4/A106 for dimensioned layout. Gable type B is not vented #DrgID #LayID C3 A506 4 A109 C4 A309 02 22 22 22 207A205AA4 A309 C4 A310 C4 A310 C4 A310 C4 A310 A3 A309 A3 A309 C4 A309 0202 5 Roof +49'-0" 5 Roof +49'-0" 6 Roof +61'-0" 6 Roof +61'-0"10"6"EQUAL 5'-0" MAX TYP.5'-0" MAX., TYP.5'-0" MAX., TYP.5'-0" MAX., TYP.EQUAL STANDING SEAM METAL ROOF PVC ROOFING TO EXTEND UP WALL, TYP. PVC ROOFING ON WALL PREFIN. MTL. COPING EIFS PROFILE EP7, REF. 1/A504 EIFS SCROLL, TYP., REF. 1/A504 24'X12" PREFINISHED WALL VENT WITH INSECT SCREEN, TYP. B1 A502 A2 A306 ROOF PLAN NOTES:1 Vent stacks, reference P series drawings. Followroofing manufacturer's required flashing details forcurbs and penetrations2 Roof drains, reference P series drawings.3 Standing seam metal roof, self-adheringunderlayment throughout4 Elevator vent. Follow roofing manufacturer'srequired flashing details for curbs and penetrations5 Plumbing vent. Ref. P-Series drawings. Followroofing manufacturer's required flashing details forcurbs and penetrations6 Mechanical equipment. Ref. mechanicaldrawings. Follow roofing manufacturer's requiredflashing details for curbs and penetrations7 Polyvinyl-chloride (PVC) roofing over 5/8" gypsumrecovery board, 6" rigid insulation, 6 mil.polyethylene vapor barrier, & 5/8" DensGlasssheathing8 Tapered roofing @ 1/2":1'9 Pre-finished metal roof edge10 Pre-finished aluminum gutter11 Pre-finished metal coping12 Shaft opening below with roof curb/cap above.Ref. M-Series sheets for roof curb/cap design.13 Break in structural roof decking requires change ininsulation thickness14 EIFS screen wall15 PVC roofing membrane to wrap up sides of elevatorshaft as well as on top of shaft16 Stair shaft to have PVC roofing membrane on thetop of the shaft as well as the west facing (short)wall. North, south and east facing walls to have anEIFS veneer.17 Provide crickets at any mechanical curb, typ.18 Structural framing for parapet screen wall19 Tapered roofing @ 3/16":1'20 Polyvinyl-chloride (PVC) roofing over 5/8" gypsumrecovery board, 4 5/8"" rigid insulation, 6 mil.polyethylene vapor barrier 21 Pre-finished metal downspout w/ splash block 22 Mtl. railings and posts. Set directly on membrane roofing. Outer posts will have welded 6"x6" stl. plate. Intermediate posts will have 3/4" sq. tube welded at bot. horizontally and extending under pavers. 23 Extend insulation between trussess and to exterior wall. Ref. detail B1/A502. 24. Walkway pads. Provide clearance between adjoining pads per roofing manufacturer. 0 4'8'16'SCALE: 1/8" = 1'-0"1 Roof Plan 0 8'16'24'SCALE: 3/32" = 1'-0"2 ROOF PLAN 3/32"=1' 0 4'8'16'SCALE: 1/8" = 1'-0"3 Lower Roof Plan At Second Floor 0 2'4'8'SCALE: 1/4" = 1'-0"4 ROOF GABLE VENT ELEVATION DETAIL- ROOF SIDE