MM GENERAL SHEET NOTES
A. SEE SHEET E-000 FOR SYMBOLS AND ABBREVIATIONS.
B. REFER TO SHEET E-501 FOR LIGHTING FIXTURE SCHEDULE.
C. SEE SHEETS E-502 THROUGH E-503 FOR PANEL SCHEDULES.
D. SEE SHEETS E-601THROUGH E-603 FOR ELECTRICAL DETAILS.
E. COORDINATE INSTALLATION OF LIGHTING FIXTURES WITH ARCHITECTURAL
REFLECTED CEILING PLANS, ARCHITECTURAL ELEVATIONS, MECHANICAL
EQUIPMENT, DIFFUSERS, SUPPORTS, PIPING, DUCTWORK AND STRUCTURAL
PLANS PRIOR TO ROUGH-IN AND INSTALLATION OF LIGHTS.
F. ALL MOUNTING HEIGHTS NOTED ON THE PLANS ARE TO THE BOTTOM OF THE
FIXTURES UNLESS NOTED OTHERWISE.
G. LOCATE CEILING MOUNTED OCCUPANCY SENSORS TO PROVIDE COMPLETE
AREA COVERAGE OF THE SPACE THEY ARE INSTALLED IN. SELECT PROPER
SENSOR COVERAGE PATTERN FROM MANUFACTURER'S PRODUCT DATA TO
DETERMINE COVERAGE. ADDITIONAL SENSORS REQUIRED DUE TO LACK OF
COVERAGE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND THE
MANUFACTURER. SENSORS SHALL INCLUDE ALL POWER SUPPLIES AND
RELAYS NECESSARY FOR PROPER OPERATION.
H. WIRING SYSTEM SHALL BE CONDUIT AND CONDUCTOR UNLESS NOTED
OTHERWISE. USE SOLID CONDUCTOR FOR SIZE #10 AWG AND SMALLER. USE
STRANDED CONDUCTOR FOR LARGER SIZES.
I. ALL COVER PLATES FOR ELECTRICAL DEVICES SHALL BE OF A COLOR TO
MATCH THE AREA COLOR SCHEME AS DIRECTED BY THE INTERIOR DESIGNER.
J. LABEL ALL RELAYS AND POWER SUPPLIES (ON THE DEVICE OR ON THE BOX
THEY ARE CONNECTED TO) WITH THE AREA THE DEVICES SERVES, THE
BRANCH CIRCUIT IT CONTROLS AND THE DEVICE ADDRESS (IF APPLICABLE).
K. EMERGENCY LIGHTING SHOWN ON THIS DRAWING INDICATES CODE
REQUIRED EMERGENCY LIGHTING FED FROM THE 'EMERGENCY BRANCH' OF
THE ESSENTIAL ELECTRICAL SYSTEM.
L. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS, ROOM AND AREA
FINISHES, CEILING PLANS, DOOR SWINGS, FIRE-RATED PARTITIONS, CABINET
AND CASEWORK AND BUILT-IN DETAILS.
M. ALL WORK SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES
AND ORDINANCES PERTAINING TO THE WORK IN THIS PROJECT.
N. EXPOSED CONDUIT SHALL BE RUN PARALLEL TO AND AT RIGHT ANGLES TO
BUILDING LINES.
O. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGNATION AND LISTING OF
FIRE RATED ASSEMBLIES. COORDINATE ALL DESIGN EFFORTS WITH FIRE
RESISTANCE OF MATERIALS AND CONSTRUCTION.
P. ALL EXTERIOR EQUIPMENT AND DEVICES SHALL BE WEATHER PROOF AND
RAIN TIGHT.
Q. SEE SHEET E-501 FOR LIGHTING SEQUENCE OF OPERATIONS SCHEDULE.
R. PG1 & PG1E PARKING GARAGE FIXTURES TO BE SURFACE MOUNTED.
S. MOUNT TYPE X1 AND X2 +6" ABOVE FINISHED DOOR FRAME.
1 2 3
4 5
6 7
A.1
B
C
D
E
E.9
1.9
F
A
6.1
E.2
4.5
36
'PG1'
36
'PG1'
36
'PG1-E'
36
'PG1'
36
'PG1'
36
'PG1'
36
'PG1'
37
'K5'
37
'K5'
38
'K7'
38
'K7'
38
'K7'
39
'K7'
39
'K7'39
'K7'
39
'K7'
39
'K7'
39
'K7-E'
39
'K7-E'
39
'K7-E'
39
'K7-E'
39
'K7-E'
39
'K7-E'39
'K7'
39
'K7'
39
'K7'
20' - 0"20' - 0"20' - 0"36
'PG1'
36
'PG1'
36
'PG1'
36
'PG1-E'
36
'PG1-E'
36
'PG1'
36
'PG1'
36
'PG1'
36
'PG1'
36
'PG1'
36
'PG1-E'
36
'PG1'
36
'PG1'
36
'PG1'
36
'PG1-E'
36
'PG1'
36
'PG1'
36
'PG1'
36
'PG1'
36
'PG1-E'
36
'PG1'
36
'PG1'36
'PG1-E'
43
'PG1-E'
43
'PG1-E'
43
'PG1'
43
'PG1'
43
'PG1-E'
43
'PG1-E'
43
'PG1'
36
'X2'
36
'X2'
36
'X2'
36
'X2'
43
'K9'
43
'K9'
43
'K9'
43
'K9'
43
'K9'
43
'K9'
43
'K9'
43
'K9'
43
'K9'
28
'K4'
1
2
1
2
28
'K4'
42
'K4'
42
'K4'
36
'PG1-E'
36
'PG1'
36
'PG1-E'
36
'PG1'
36
'PG1-E'
3
3
3
18166
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS800 West Monon Green Blvd.EL100
GARAGE LEVEL
LIGHTING PLAN
08/31/202108/31/2021
KRIS EHLERS BARRY SIMPSON
N
0 16'8'4'1/8" = 1'-0"
GARAGE LIGHTING PLAN1
SHEET PLAN NOTES
1 MOUNT FIXTURE +8'-0" A.F.F. TO BOTTOM OF FIXTURE.
2 LIGHTING FIXTURES IN THIS SPACE TO HAVE ON-BOARD OCCUPANCY
SENSOR SET TO PROVIDE 100 PERCENT LIGHT OUTPUT IN OCCUPIED MODE
AND 50 PERCENT LIGHT OUTPUT IN UNOCCUPIED MODE.
3 LIGHTING FIXTURES IN THIS SPACE ARE FED FROM PANEL 1HA2 LOCATED IN
ELECTRICAL ROOM ON THIS LEVEL UNLESS NOTED OTHERWISE.