Loading...
HomeMy WebLinkAboutEP100 - GARAGE POWER PLANJ J JJ S TS H H S S H F F F FF HH J HF F F F F F F F 1 2 3 4 5 6 7 A.1 B C D E E.9 1.9 F A 6.1 E.2 4.5 GEF-1 GEF-2 GEF-1 EUH-6 EUH-8 EUH-9 EUH-4 EUH-5 1HA2- 4,6 1HA2- 1,3 1HA2- 8,10 1HA2- 7,9 1HA2- 12,14 1HA2- 51HA1- 5 1HA1- 2 1HA2- 44 1HA2- 45 1HA2- 461HA2- 47 GEF-3 1HA2- 2 1 2 1 BATTERY CHARGER FOR EMERGENCY LOWERING 1HA1- 8 10 1HA1- 15,17 EUH-10 EUH-10 EUH-10 EUH-10 1HA1- 1,3 1HA1- 11,13 1HA1- 7,9 1HA1- 4,6 MC-TEN-AMC-TEN-BDPH-1 1HA1 1HA2 1HA2- 28 2 3 FACP 1HA2- 30 1HA2- 31 SCP 1HA2 - 32 (3) 4" UNDERGROUND CONDUITS FOR INCOMING TELECOMMUNICATIONS SERVICE CABLES. TELECOM CONDUITS WILL BE VIA NORTH WALL NEAR PUBLIC RESTROOMS AND WREN PROJECT SITE ELE. DRAWINGS. 1HA2- 33 1HA2- 34 1HA2- 35 1HA2- 35 1HA2- 33 1HA2- 33 1HA2- 33 1HA2- 33 1HA2- 34 1HA2- 34 1HA2- 34 1HA2- 34 1HA2- 34 1HA2- 35 1HA2- 35 1HA2- 35 DS-2 1HA2- 11,13 MC-RES-A 18166 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS800 West Monon Green Blvd.EP100 GARAGE POWER PLAN 08/31/202108/31/2021 KREG SMEAD BARRY SIMPSON 1/8" = 1'-0" GARAGE POWER PLAN1 SHEET PLAN NOTES 1 ELEVATOR FUSIBLE DISCONNECT SWITCH. 400A-3P, NEMA 1. INSTALL FUSES SIZED PER THE ELEVATOR CONTRACTOR’S REQUIREMENTS. VERIFY EXACT LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN. 2 ELEVATOR CAB FUSIBLE DISCONNECT SWITCH. 30A-1P, NEMA 1 WITH 20A FUSE. . VERIFY EXACT LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN. N 0 16'8'4'