HomeMy WebLinkAboutEP100 - GARAGE POWER PLANJ
J
JJ
S TS
H H
S
S
H
F
F
F
FF HH
J
HF
F
F
F
F
F
F
F
1 2 3
4 5
6 7
A.1
B
C
D
E
E.9
1.9
F
A
6.1
E.2
4.5
GEF-1
GEF-2
GEF-1
EUH-6 EUH-8
EUH-9
EUH-4
EUH-5
1HA2- 4,6
1HA2- 1,3
1HA2- 8,10
1HA2- 7,9
1HA2- 12,14
1HA2- 51HA1- 5
1HA1- 2
1HA2- 44
1HA2- 45
1HA2- 461HA2- 47
GEF-3
1HA2- 2
1
2
1 BATTERY CHARGER FOR
EMERGENCY LOWERING
1HA1- 8
10
1HA1- 15,17
EUH-10
EUH-10
EUH-10
EUH-10
1HA1- 1,3
1HA1- 11,13
1HA1- 7,9
1HA1- 4,6 MC-TEN-AMC-TEN-BDPH-1
1HA1
1HA2
1HA2- 28
2
3
FACP
1HA2- 30 1HA2- 31
SCP
1HA2 - 32
(3) 4" UNDERGROUND CONDUITS FOR
INCOMING TELECOMMUNICATIONS
SERVICE CABLES. TELECOM
CONDUITS WILL BE VIA NORTH WALL
NEAR PUBLIC RESTROOMS AND
WREN PROJECT SITE ELE.
DRAWINGS.
1HA2- 33
1HA2- 34
1HA2- 35
1HA2- 35
1HA2- 33
1HA2- 33
1HA2- 33
1HA2- 33
1HA2- 34
1HA2- 34
1HA2- 34 1HA2- 34
1HA2- 34
1HA2- 35
1HA2- 35
1HA2- 35
DS-2
1HA2- 11,13
MC-RES-A
18166
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS800 West Monon Green Blvd.EP100
GARAGE POWER
PLAN
08/31/202108/31/2021
KREG SMEAD BARRY SIMPSON
1/8" = 1'-0"
GARAGE POWER PLAN1
SHEET PLAN NOTES
1 ELEVATOR FUSIBLE DISCONNECT SWITCH. 400A-3P, NEMA 1. INSTALL FUSES
SIZED PER THE ELEVATOR CONTRACTOR’S REQUIREMENTS. VERIFY EXACT
LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN.
2 ELEVATOR CAB FUSIBLE DISCONNECT SWITCH. 30A-1P, NEMA 1 WITH 20A
FUSE. . VERIFY EXACT LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO
INSTALLING ROUGH-IN.
N
0 16'8'4'