Loading...
HomeMy WebLinkAboutEP101 - 1ST FLOOR POWER PLANK KKK K KKKKES ES ESES ES ES ESKES ES K J J J J J KJ S PIV DC DC DC DC DC DC DC DC DCT TTS F F FF F HF F FF F FF F FARA 1 2 3 4 5 6 7 5.1 A.1 B C D E E.9 1.9 F A 6.1 E.2 4.5 EWH-2 EUH-2 EUH-1 CC-2 EWH-1 EUH-3 EUH-3 EUH-3 EUH-3 EUH-3 EUH-3 RECESSED ACCESS DIRECTORY 4 EUH-3 3 TO FACP 55 5 5 5 45 25,27 40,42 45 41,43 38 24,26 23 45 23 20,22 19,21 16,18 23 23 32 33,35 37,39 32 34,36 32 45 32 32 32 23 1HA1- 29,31 1HA1- 23 1HA1- 54 A. SEE SHEET E-000 FOR SYMBOLS AND ABBREVIATIONS. B. SEE SHEET E-501 FOR MECHANICAL EQUIPMENT POWER SCHEDULE. C. SEE SHEETS E-502 THROUGH E-503 FOR PANEL SCHEDULES. D. SEE SHEETS E-601, E-602 AND E-603 FOR ELECTRICAL DETAILS. E. WIRING SYSTEM SHALL BE CONDUIT AND CONDUCTOR UNLESS NOTED OTHERWISE. USE SOLID CONDUCTOR FOR SIZE #10 AWG AND SMALLER. USE STRANDED CONDUCTOR FOR LARGER SIZES. F. ALL COVER PLATES FOR ELECTRICAL DEVICES SHALL BE OF A COLOR TO MATCH THE AREA COLOR SCHEME AS DIRECTED BY THE INTERIOR DESIGNER. G. ALL WORK SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES AND ORDINANCES PERTAINING TO THE WORK IN THIS PROJECT. H. EXPOSED CONDUIT SHALL BE RUN PARALLEL TO AND AT RIGHT ANGLES TO BUILDING LINES. I. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGNATION AND LISTING OF FIRE RATED ASSEMBLIES. COORDINATE ALL DESIGN EFFORTS WITH FIRE RESISTANCE OF MATERIALS AND CONSTRUCTION. J. ALL EXTERIOR EQUIPMENT AND DEVICES SHALL BE WEATHER PROOF AND RAIN TIGHT. K. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL INTERCONNECT WIRING FOR MECHANICAL AND PLUMBING EQUIPMENT FURNISHED BY OTHERS. GENERAL SHEET NOTES 18166 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS800 West Monon Green Blvd.EP101 1ST FLOOR POWER PLAN 08/31/202108/31/2021 KREG SMEAD BARRY SIMPSON 1/8" = 1'-0" 1ST FLOOR POWER PLAN1016'8'4' N SHEET PLAN NOTES 1 CONNECT CIRCUIT INDICATED TO BATTERY CHARGER THROUGH AUXILIARY CONTACTS IN DISCONNECT SWITCHES FOR EACH ELEVATOR. COORDINATE WORK WITH ELEVATOR INSTALLED. 2 RECEPTACLE OUTLET MOUNTED IN ELEVATOR PIT. COORDINATE LOCATION WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN. 3 ACCESS CONTROL FOR ELEVATOR CAB. COORDINATE INTERFACE WIRING, ROUG-IN AND PROGRAMMING REQUIREMENTS WITH THE OWNER AND THE ELEVATOR CONTRACTOR. 4 DOOR SECURED THROUGH ACCESS CONTROL SYSTEM. SEE ROUGH-IN DETAIL 11 ON SHEET E-601. 5 PROVIDE POWER ROUGH-IN FOR FUTURE SIGNAGE.