HomeMy WebLinkAboutEP101 - 1ST FLOOR POWER PLANK
KKK K KKKKES
ES
ESES
ES ES
ESKES
ES
K
J
J
J
J
J
KJ
S
PIV
DC
DC
DC
DC
DC
DC
DC
DC
DCT TTS
F
F
FF
F
HF
F
FF F
FF F
FARA
1 2 3
4 5
6 7
5.1
A.1
B
C
D
E
E.9
1.9
F
A
6.1
E.2
4.5
EWH-2
EUH-2
EUH-1
CC-2
EWH-1
EUH-3
EUH-3
EUH-3
EUH-3
EUH-3
EUH-3
RECESSED ACCESS
DIRECTORY
4
EUH-3
3
TO FACP
55
5
5
5
45
25,27
40,42
45
41,43
38
24,26
23
45
23 20,22
19,21
16,18
23
23 32
33,35
37,39
32
34,36
32
45
32
32
32
23
1HA1- 29,31
1HA1- 23
1HA1- 54
A. SEE SHEET E-000 FOR SYMBOLS AND ABBREVIATIONS.
B. SEE SHEET E-501 FOR MECHANICAL EQUIPMENT POWER SCHEDULE.
C. SEE SHEETS E-502 THROUGH E-503 FOR PANEL SCHEDULES.
D. SEE SHEETS E-601, E-602 AND E-603 FOR ELECTRICAL DETAILS.
E. WIRING SYSTEM SHALL BE CONDUIT AND CONDUCTOR UNLESS NOTED
OTHERWISE. USE SOLID CONDUCTOR FOR SIZE #10 AWG AND SMALLER. USE
STRANDED CONDUCTOR FOR LARGER SIZES.
F. ALL COVER PLATES FOR ELECTRICAL DEVICES SHALL BE OF A COLOR TO
MATCH THE AREA COLOR SCHEME AS DIRECTED BY THE INTERIOR DESIGNER.
G. ALL WORK SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES
AND ORDINANCES PERTAINING TO THE WORK IN THIS PROJECT.
H. EXPOSED CONDUIT SHALL BE RUN PARALLEL TO AND AT RIGHT ANGLES TO
BUILDING LINES.
I. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGNATION AND LISTING OF
FIRE RATED ASSEMBLIES. COORDINATE ALL DESIGN EFFORTS WITH FIRE
RESISTANCE OF MATERIALS AND CONSTRUCTION.
J. ALL EXTERIOR EQUIPMENT AND DEVICES SHALL BE WEATHER PROOF AND
RAIN TIGHT.
K. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL INTERCONNECT
WIRING FOR MECHANICAL AND PLUMBING EQUIPMENT FURNISHED BY
OTHERS.
GENERAL SHEET NOTES
18166
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS800 West Monon Green Blvd.EP101
1ST FLOOR POWER
PLAN
08/31/202108/31/2021
KREG SMEAD BARRY SIMPSON
1/8" = 1'-0"
1ST FLOOR POWER PLAN1016'8'4'
N
SHEET PLAN NOTES
1 CONNECT CIRCUIT INDICATED TO BATTERY CHARGER THROUGH AUXILIARY
CONTACTS IN DISCONNECT SWITCHES FOR EACH ELEVATOR. COORDINATE
WORK WITH ELEVATOR INSTALLED.
2 RECEPTACLE OUTLET MOUNTED IN ELEVATOR PIT. COORDINATE LOCATION
WITH ELEVATOR CONTRACTOR PRIOR TO INSTALLING ROUGH-IN.
3 ACCESS CONTROL FOR ELEVATOR CAB. COORDINATE INTERFACE WIRING,
ROUG-IN AND PROGRAMMING REQUIREMENTS WITH THE OWNER AND THE
ELEVATOR CONTRACTOR.
4 DOOR SECURED THROUGH ACCESS CONTROL SYSTEM. SEE ROUGH-IN
DETAIL 11 ON SHEET E-601.
5 PROVIDE POWER ROUGH-IN FOR FUTURE SIGNAGE.