Loading...
HomeMy WebLinkAboutEP105 - ROOF POWER PLANRTU-1 CU-3-206CU-3-306 CU-3-406 CU-2-208CU-2-308 CU-2-408 CU-2-210CU-2-310 CU-2-410 CU-1-212 CU-1-312 CU-1-412 CU-1-409 CU-1-209CU-1-309 CU-1-307CU-1-207 CU-1-407 CU-1-205 CU-1-305 CU-1-405 CU-2-203 CU-2-303 CU-2-403 CU-1-402 CU-1-202 CU-1-302 CU-2-204 CU-2-304 CU-2-404 CU-DS-2 CU-DS-1 HP-CC-2 CU-DS-1 51 51 51 51 15 15 15 16 16 16 16 17,19,21 20,22 24,26 27,29 EF-2 1HA2- 18 1HA1- 51 1HA2- 16 A. SEE SHEET E-000 FOR SYMBOLS AND ABBREVIATIONS. B. SEE SHEET E-501 FOR MECHANICAL EQUIPMENT POWER SCHEDULE. C. SEE SHEETS E-502 THROUGH E-503 FOR PANEL SCHEDULES. D. SEE SHEETS E-601, E-602 AND E-603 FOR ELECTRICAL DETAILS. E. WIRING SYSTEM SHALL BE CONDUIT AND CONDUCTOR UNLESS NOTED OTHERWISE. USE SOLID CONDUCTOR FOR SIZE #10 AWG AND SMALLER. USE STRANDED CONDUCTOR FOR LARGER SIZES. F. ALL COVER PLATES FOR ELECTRICAL DEVICES SHALL BE OF A COLOR TO MATCH THE AREA COLOR SCHEME AS DIRECTED BY THE INTERIOR DESIGNER. G. ALL WORK SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES AND ORDINANCES PERTAINING TO THE WORK IN THIS PROJECT. H. EXPOSED CONDUIT SHALL BE RUN PARALLEL TO AND AT RIGHT ANGLES TO BUILDING LINES. I. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGNATION AND LISTING OF FIRE RATED ASSEMBLIES. COORDINATE ALL DESIGN EFFORTS WITH FIRE RESISTANCE OF MATERIALS AND CONSTRUCTION. J. ALL EXTERIOR EQUIPMENT AND DEVICES SHALL BE WEATHER PROOF AND RAIN TIGHT. K. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL INTERCONNECT WIRING FOR MECHANICAL AND PLUMBING EQUIPMENT FURNISHED BY OTHERS. GENERAL SHEET NOTES 18166 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS800 West Monon Green Blvd.EP105 ROOF POWER PLAN 08/31/202108/31/2021 KREG SMEAD BARRY SIMPSON 1/8" = 1'-0" ROOF POWER PLAN1016'8'4' N