HomeMy WebLinkAboutH-100 - HVAC FOUNDATION PLANSnow Melt
Design:140.0 Btu/(hr·ft²)
Backloss:28.0 Btu/(hr·ft²)
Total:168.0 Btu/(hr·ft²)
Circuit A-9
204 ft @ 9 in
Flow: 2.09 USGPM
ΔT: 25 °F
Circuit A-1
196 ft @ 9 in
Flow: 1.98 USGPM
ΔT: 25 °F
Circuit A-15
193 ft @ 9 in
Flow: 2.00 USGPM
ΔT: 25 °F
Circuit A-3
196 ft @ 9 in
Flow: 2.02 USGPM
ΔT: 25 °F
Circuit A-4
203 ft @ 9 in
Flow: 2.02 USGPM
ΔT: 25 °FCircuit A-5
193 ft @ 9 in
Flow: 1.90 USGPM
ΔT: 25 °FCircuit A-6
194 ft @ 9 in
Flow: 1.97 USGPM
ΔT: 25 °F
Circuit A-7
206 ft @ 9 in
Flow: 2.08 USGPM
ΔT: 25 °F
Circuit A-8
220 ft @ 9 in
Flow: 2.15 USGPM
ΔT: 25 °F
Circuit A-14
204 ft @ 9 in
Flow: 1.94 USGPM
ΔT: 25 °F
Circuit A-10
204 ft @ 9 in
Flow: 1.99 USGPM
ΔT: 25 °F
Circuit A-11
209 ft @ 9 in
Flow: 1.98 USGPM
ΔT: 25 °F
Circuit A-12
206 ft @ 9 in
Flow: 1.98 USGPM
ΔT: 25 °F
Circuit A-13
201 ft @ 9 in
Flow: 1.85 USGPM
ΔT: 25 °F
Manifold 1
(103.5 °F)
Manifold
(103.5 °F)
0'-9"
0'-6"T/
FOR ENLARGED PLANS
REFER TO 1 H-304
GEF-1
GEF-2
GEF-1
EUH-6 EUH-8
EUH-9
EUH-4
EUH-5
GEF-3
LV1
60/20 J8800 60/2060/2066/424"ø COMBUSTION AIR AND EXHAUST AIR
VENTS ROUTE UP TO FLOOR ABOVE.
TERMINATE WITH MANUFACTURER
APPROVED CONCENTRIC VENT KIT.
6"ø EXHAUST AIR DUCT
ROUTES UP TO FLOOR ABOVE.
EUH-10
EUH-10
EUH-10
EUH-10
DS-21
DS-1
1
18166
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS800 West Monon Green Blvd.H-100
HVAC FOUNDATION
PLAN
08/31/202108/31/2021
THOMAS KENNEDY JOE BOLYARD
1/8" = 1'-0"
HVAC FOUNDATION PLAN1
11700201
No.
STATE OFJOSEPHR.BO
L
Y
ARDPROFE
S
S
IONA L E N G INEERDATE SIGNED 08/31/21REGISTER
E
D
I
ND I A N AN
0 16'8'4'