Loading...
HomeMy WebLinkAboutH-102 - 2ND FLOOR HVAC PLANFDFD G 10/18 400 1 2 K100 2 -48 K 100 2 -48 K100 2 -48 K 100 2 -48 6ø 8ø6ø10/10 8ø6ø6ø 3 H 6/6 65 / FOR ENLARGED PLANS REFER TO 2 H-301 / FOR ENLARGED PLANS REFER TO 3 H-301 / FOR ENLARGED PLANS REFER TO 1 H-302 / FOR ENLARGED PLANS REFER TO 4 H-301 / FOR ENLARGED PLANS REFER TO 2 H-303 / FOR ENLARGED PLANS REFER TO 2 H-303 / FOR ENLARGED PLANS REFER TO 1 H-301 / FOR ENLARGED PLANS REFER TO 3 H-301 4 / FOR ENLARGED PLANS REFER TO 1 H-303 / FOR ENLARGED PLANS REFER TO 2 H-302 18166 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS800 West Monon Green Blvd.H-102 2ND FLOOR HVAC PLAN 08/31/202108/31/2021 THOMAS KENNEDY JOE BOLYARD 1/8" = 1'-0" 2ND FLOOR HVAC PLAN1016'8'4' N SHEET PLAN NOTES 1 10/10 SUPPLY DOWN FROM FLOOR ABOVE IN CHASE. REFER TO H-103 FOR CONTINUATION. 2 10/10 RETURN UP TO FLOOR ABOVE IN CHASE. REFER TO H-103 FOR CONTINUATION. 3 6/6 EXHAUST DUCT RISES UP TO FLOOR ABOVE. REFER TO H-103 FOR CONTINUATION. PROVIDE FIRE DAMPER AT PENETRATION IN FIRE RATED FLOOR ASSEMBLY. 4 MOUNT TOP OF GRILLE AT 4" BELOW FINISHED CEILING. 11700201 No. STATE OFJOSEPHR.BO L Y ARDPROFE S S IONA L E N G INEERDATE SIGNED 08/31/21REGISTER E D I ND I A N A