HomeMy WebLinkAboutH-102 - 2ND FLOOR HVAC PLANFDFD
G 10/18
400
1
2
K100
2 -48
K 100
2 -48
K100
2 -48
K 100
2 -48
6ø
8ø6ø10/10
8ø6ø6ø
3
H 6/6
65
/
FOR ENLARGED PLANS
REFER TO 2 H-301
/
FOR ENLARGED PLANS
REFER TO 3 H-301
/
FOR ENLARGED PLANS
REFER TO 1 H-302
/
FOR ENLARGED PLANS
REFER TO 4 H-301
/
FOR ENLARGED PLANS
REFER TO 2 H-303
/
FOR ENLARGED PLANS
REFER TO 2 H-303
/
FOR ENLARGED PLANS
REFER TO 1 H-301
/
FOR ENLARGED PLANS
REFER TO 3 H-301
4
/
FOR ENLARGED PLANS
REFER TO 1 H-303
/
FOR ENLARGED PLANS
REFER TO 2 H-302
18166
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS800 West Monon Green Blvd.H-102
2ND FLOOR HVAC
PLAN
08/31/202108/31/2021
THOMAS KENNEDY JOE BOLYARD
1/8" = 1'-0"
2ND FLOOR HVAC PLAN1016'8'4'
N
SHEET PLAN NOTES
1 10/10 SUPPLY DOWN FROM FLOOR ABOVE IN CHASE. REFER TO H-103 FOR
CONTINUATION.
2 10/10 RETURN UP TO FLOOR ABOVE IN CHASE. REFER TO H-103 FOR
CONTINUATION.
3 6/6 EXHAUST DUCT RISES UP TO FLOOR ABOVE. REFER TO H-103 FOR
CONTINUATION. PROVIDE FIRE DAMPER AT PENETRATION IN FIRE RATED
FLOOR ASSEMBLY.
4 MOUNT TOP OF GRILLE AT 4" BELOW FINISHED CEILING.
11700201
No.
STATE OFJOSEPHR.BO
L
Y
ARDPROFE
S
S
IONA L E N G INEERDATE SIGNED 08/31/21REGISTER
E
D
I
ND I A N A