Loading...
HomeMy WebLinkAboutH-103 - 3RD FLOOR HVAC PLANFDFD G 10/18 400 1 2 EWH-5 EWH-4 3 H 6/6 65 / FOR ENLARGED PLANS REFER TO 2 H-301 / FOR ENLARGED PLANS REFER TO 3 H-301 / FOR ENLARGED PLANS REFER TO 1 H-302 / FOR ENLARGED PLANS REFER TO 4 H-301 / FOR ENLARGED PLANS REFER TO 2 H-303 / FOR ENLARGED PLANS REFER TO 2 H-303 / FOR ENLARGED PLANS REFER TO 1 H-301 / FOR ENLARGED PLANS REFER TO 3 H-301 8øK 100 2 -48 K 100 2 -48 K 100 2 -48 K 100 2 -48 4 10/10 / FOR ENLARGED PLANS REFER TO 1 H-303 / FOR ENLARGED PLANS REFER TO 2 H-302 18166 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS800 West Monon Green Blvd.H-103 3RD FLOOR HVAC PLAN 08/31/202108/31/2021 THOMAS KENNEDY JOE BOLYARD 1/8" = 1'-0" 3RD FLOOR HVAC PLAN1 N 0 16'8'4' SHEET PLAN NOTES 1 16/10 SUPPLY DOWN FROM FLOOR ABOVE. REFER TO H-104 FOR CONTINUATION. 10/10 SUPPLY DOWN TO FLOOR BELOW. REFER TO H-102 FOR CONTINUATION. 2 16/10 RETURN UP TO FLOOR ABOVE. REFER TO H-104 FOR CONTINUATION. 10/10 RETURN UP FROM FLOOR BELOW. REFER TO H-102 FOR CONTINUATION. 3 6/6 EXHAUST DUCT RISES UP FROM FLOOR BELOW. REFER TO H-102 FOR CONTINUATION. 6/6 EXHAUST DUCT RISES TO FLOOR ABOVE. REFER TO H-104 FOR CONTINUATION. PROVIDE FIRE DAMPERS AT PENETRATION IN FIRE RATED FLOOR ASSEMBLY. 4 MOUNT TOP OF GRILLE AT 4" BELOW FINISHED CEILING. 11700201 No. STATE OFJOSEPHR.BO L Y ARDPROFE S S IONA L E N G INEERDATE SIGNED 08/31/21REGISTER E D I ND I A N A