HomeMy WebLinkAboutH-105 - ROOF HVAC PLANCU-3-206CU-3-306
CU-3-406
RTU-1
CU-2-208CU-2-308
CU-2-408
CU-2-210CU-2-310
CU-2-410
CU-1-212
CU-1-312
CU-1-412
CU-1-209
CU-1-409
CU-1-309
CU-1-407
CU-1-307CU-1-207
CU-1-205
CU-1-305 CU-1-405
CU-2-403CU-2-303
CU-2-203
CU-1-302
CU-1-202
CU-1-402
CU-2-404CU-2-304
CU-2-204
CU-DS-2
CU-DS-1
HP-CC-2
CU-DS-1
EF-2
1
1
1
1
1
FUTURE TENANT
EQUIPMENT SPACE
FUTURE TENANT
EQUIPMENT SPACE
FUTURE TENANT
EQUIPMENT SPACE
FUTURE TENANT
EQUIPMENT SPACE
FUTURE TENANT
EQUIPMENT SPACE
10/22
10/22
2
18166
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS800 West Monon Green Blvd.H-105
ROOF HVAC PLAN
08/31/202108/31/2021
THOMAS KENNEDY JOE BOLYARD
1/8" = 1'-0"
ROOF HVAC PLAN1
N
0 16'8'4'
SHEET PLAN NOTES
1 FURNISH AND INSTALL ROOF CURB AND CAP EQUAL TO GREENHECK GPIP OR
ENGINEER APPROVED EQUAL. ROOF CURB AND CAP ARE TO BE INSTALLED
OVER FUTURE MECHANICAL SHAFT OPENING. FIELD VERIFY EXACT SHAFT
OPENING. SIZE ROOF CAP ACCORDINGLY.
2 MOUNT RTU-1 ON FACTORY ROOF CURB. TRANSITION DUCTS TO UNIT
INLET/OUTLET SIZES. SECURE UNIT TO ROOF CURB AND ROOF CURB TO
STRUCTURE PER WIND LOAD ANALYSIS. (BY OTHERS).
11700201
No.
STATE OFJOSEPHR.BO
L
Y
ARDPROFE
S
S
IONA L E N G INEERDATE SIGNED 08/31/21REGISTER
E
D
I
ND I A N A