Loading...
HomeMy WebLinkAboutH-105 - ROOF HVAC PLANCU-3-206CU-3-306 CU-3-406 RTU-1 CU-2-208CU-2-308 CU-2-408 CU-2-210CU-2-310 CU-2-410 CU-1-212 CU-1-312 CU-1-412 CU-1-209 CU-1-409 CU-1-309 CU-1-407 CU-1-307CU-1-207 CU-1-205 CU-1-305 CU-1-405 CU-2-403CU-2-303 CU-2-203 CU-1-302 CU-1-202 CU-1-402 CU-2-404CU-2-304 CU-2-204 CU-DS-2 CU-DS-1 HP-CC-2 CU-DS-1 EF-2 1 1 1 1 1 FUTURE TENANT EQUIPMENT SPACE FUTURE TENANT EQUIPMENT SPACE FUTURE TENANT EQUIPMENT SPACE FUTURE TENANT EQUIPMENT SPACE FUTURE TENANT EQUIPMENT SPACE 10/22 10/22 2 18166 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS800 West Monon Green Blvd.H-105 ROOF HVAC PLAN 08/31/202108/31/2021 THOMAS KENNEDY JOE BOLYARD 1/8" = 1'-0" ROOF HVAC PLAN1 N 0 16'8'4' SHEET PLAN NOTES 1 FURNISH AND INSTALL ROOF CURB AND CAP EQUAL TO GREENHECK GPIP OR ENGINEER APPROVED EQUAL. ROOF CURB AND CAP ARE TO BE INSTALLED OVER FUTURE MECHANICAL SHAFT OPENING. FIELD VERIFY EXACT SHAFT OPENING. SIZE ROOF CAP ACCORDINGLY. 2 MOUNT RTU-1 ON FACTORY ROOF CURB. TRANSITION DUCTS TO UNIT INLET/OUTLET SIZES. SECURE UNIT TO ROOF CURB AND ROOF CURB TO STRUCTURE PER WIND LOAD ANALYSIS. (BY OTHERS). 11700201 No. STATE OFJOSEPHR.BO L Y ARDPROFE S S IONA L E N G INEERDATE SIGNED 08/31/21REGISTER E D I ND I A N A