Loading...
HomeMy WebLinkAboutH-301 - HVAC ENLARGED UNIT PLANSTTT T6/6 F50 6ø FCU-1 12/1014/6 F200 14/6 F190 14/6 F180 8ø 8ø 8ø 1 24/12 G620 2 3 3 3 3 EF-1 5 6 7 J - 36/8 8 9 10 4 4ø 6ø 14J- 36/8 6ø FCU-1 30/8 G620 12/10 ø6 ø8ø8 ø8 EF-1 1 2 3 3 33 4 14/6 F190 F 14/6 190 14/6 F190 F 6/6 50 5 6 7 J- 36/6 7 8 9 10 4ø6øFCU-2 F 8/6 100 8/6 F100 8/6 F100 F 8/6 180 8/6 F180 F 6/6 50F6/6 50 ø8 ø8 ø6 ø6 12/108/6ø6 ø6 ø6 4øJ - 36/8 G 36/8 760 112 3 3 3 3 3 3 3 4 EF-1 EF-15 5 6 7 14 8 9 10 6ø6ø 6ø G- 36/8 18/8 FCU-2 F 6/6 50 F 6/6 50 8/6 F180 F 8/6 50 F 8/6 100 F 8/6 150 F 8/6 180 4ø ø8 ø8 10/10 ø6 10/10 ø6 ø8 ø8 ø6 EF-16ø6ø EF-1 1 2 1 3 3 3 3 3 3 3 12 EF-15 5 5 J - 36/6 7 6 8 9 10 13 11 18166 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS800 West Monon Green Blvd.H-301 HVAC ENLARGED UNIT PLANS 08/31/202108/31/2021 THOMAS KENNEDY JOE BOLYARD 1/4" = 1'-0" UNIT 'A1' HVAC ENLARGED PLAN108'4'2' SHEET PLAN NOTES 1 TERMINATE EXHAUST DUCTWORK WITH WALL CAP LIKE GREENHECK MODEL WC-6. 2 TERMINATE EXHAUST DUCTWORK WITH WALL CAP LIKE GREENHECK MODEL WC-4. 3 PROVIDE CEILING RADIATION DAMPER AT ALL LOCATIONS WHERE GRILLES PENETRATE A FIRE RATED CEILING. 4 PROVIDE DRYER BOX PER MANUFACTURER'S INSTRUCTIONS. MOUNT BOTTOM OF DRYER BOX AT NOMINAL 6" ABOVE FINISHED FLOOR. SEAL AROUND BOX PERIMETER. COORDINATE LOCATION WITH ARCHITECTURAL PLANS. INSTALL LABEL SHOWING EQUIVALENT LENGTH OF INSTALLED DRYER VENT (INCLUDING NUMBER OF ELBOWS) PER MECHANICAL CODE. 5 PROVIDE BATHROOM EXHAUST FAN EF-1 IN WALL USE ONLY SMOOTH RADIUS ELBOWS (R/D = 1.5). 6 PROVIDE 7 DAY PROGRAMMABLE THERMOSTAT WITH THE TOP OF DEVICE 48" ABOVE FINISHED FLOOR. 7 FURNISH AND INSTALL TRANSFER GRILLE 6" ABOVE TOP OF DOOR. SHEET METAL TO BE INSTALLED THROUGH THE WALL. PAINT BLACK ANY STUDS THAT INTERSECT. 8 PROVIDE FLEXIBLE CONNECTION TO FCU DISCHARGE BEFORE CONNECTION TO SUPPLY DUCTWORK. PROVIDE FIRE DAMPER WHERE DUCT PENETRATES RATED CEILING PARTITION. 9 PROVIDE TRAPPED 3/4" PLENUM RATED CPVC CONDENSATE DRAIN LINE AND TERMINATE MINIMUM OF 2" ABOVE HUB-DRAIN LOCATED IN MECHANICAL CLOSET. DO NOT BLOCK FILTER ACCESS. 10 ROUTE REFRIGERANT LINES UP TO ABOVE CEILING AND OVER TO EXTERIOR WALL. ROUTE DOWN IN WALL TO 12" ABOVE GRADE, THEN OVER TO CONDENSING UNIT SERVING THIS APARTMENT. SEE OVERALL MECHANICAL PLANS FOR CONDENSING UNIT LOCATIONS. REFRIGERANT LINES SIZED PER MANUFACTURER'S RECOMMENDATIONS. 11 PROVIDE 18"X18" CEILING ACCESS DOOR BELOW DRYER BOOSTER FAN DBF-1. 12 PROVIDE DRYER BOX PER MANUFACTURER'S INSTRUCTIONS. MOUNT BOTTOM OF DRYER BOX AT NOMINAL 6" ABOVE FINISHED FLOOR. SEAL AROUND BOX PERIMETER. PROVIDE LINT TRAP EQUAL TO FANTECH DBLT4W. COORDINATE LOCATION WITH ARCHITECTURAL PLANS. INSTALL LABEL SHOWING LENGTH OF INSTALLED DRYER VENT (INLUDING NUMBER OF WLBOWS) PER MECHANICAL CODE. INSTALL SECONDARY LINT TRAP IN AIRSTREAM AT 7'-0" ABOVE FINISHED FLOOR. 13 PROVIDE RETURN GRILLE 6" ABOVE DOOR FRAME. TRANSITION USING 30° REDUCER BEHIND. DUCTWORK ROUTES BELOW RATED ASSEMBLY AND ABOVE DROP CEILING IN CLOSET. 14 PROVIDE RETURN GRILLE AND MOUNT HIGH ON WALL, TIGHT TO CEILING. 1/4" = 1'-0" UNIT 'A2' HVAC ENLARGED PLAN2 0 8'4'2' 1/4" = 1'-0" UNIT 'B1' HVAC ENLARGED PLAN3 0 8'4'2' 1/4" = 1'-0" UNIT 'B2' HVAC ENLARGED PLAN408'4'2' 11700201 No. STATE OFJOSEPHR.BO L Y ARDPROFE S S IONA L E N G INEERDATE SIGNED 08/31/21REGISTER E D I ND I A N A