Loading...
HomeMy WebLinkAboutP-100 - BASEMENT PLUMBING PLANTM1 2 3 4 5 6 7 A.1 B C D E E.9 1.9 F A 6.1 E.2 4.5 4" F 6" F 4" CW SEE SITE/CIVIL DRAWINGS FOR CONTINUATION PIPE SLEEVE (TYP.) SEE SITE/CIVIL DRAWINGS FOR CONTINUATION 6" WASTE INV. EL. = +8'-0" A.F.F. 6" W PIPE SLEEVE (TYP.) 6" STORM INV. EL. = +9'-0" A.F.F. (4,650 S.F.) 1 3 W WW WWWWWW PIPE SLEEVE (TYP.) SEE SITE/CIVIL DRAWINGS FOR CONTINUATION 8" STORM INV. EL. = +8'-0" A.F.F. (15,125 S.F.) 3 2 4" ST 4" ST STST4 6" ST 6" ST STST ST6" ST 4" ST 2 4 1 6" ST 8" ST 1 8" ST ST STSTST 8" ST10" ST 2 4" ST ST10" ST ST ST4" ST 2 4" ST 4" ST ST7 5 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 5 6 6" W 5 6" W 5 10" ST 8 4" ST DWBP-1 4"FD-1 4"FD-1 BFP-2 BFP-1 HB-1 4"FD-1 6" W 4" PD 4" PD 13 14 SE-1 15 9 1110 17 18 SP-1 16 12 TD-1 FCO FCO 6"GD-1 FCO 6"GD-1 6"GD-1 FCO FCO4"FD-1 4"FD-1 BFP-3 23 22 20 21 1119HB-1 2" V 1" CW 1" G (2 PSI) SEE SITE/ CIVIL DRAWINGS FOR CONTINUATION 24 25 26 3"FD-1 3"FD-1 3"FD-1 3"FD-1 FCO GENERAL PLUMBING NOTES: A. REFERENCE SHEET M-000 FOR PLUMBING SYMBOLS, LEGENDS AND ABBREVIATIONS AND ADDITIONAL GENERAL NOTES. 11700201 No. STATE OFJOSEPHR.BO L Y ARDPROFES S IONA L E N G INEERDATE SIGNED 08/31/21 R E G I S T ER E D I ND I A N A 18166 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS GRJK800 West Monon Green Blvd.P-100 BASEMENT PLUMBING PLAN 08/31/202108/31/2021 1/8" = 1'-0" BASEMENT PLUMBING PLAN1016'8'4' N SHEET PLAN NOTES 1 6"ST UP. 2 3"ST UP. 3 4"ST UP TO ECO. 4 4"ST UP TO FCO. 5 4"W UP. 6 4"W UP TO FCO. 7 4"W 2-WAY UP TO ECO. 8 4"ST UP. 9 4"CW UP. 10 3/4"CW DROP. 11 2" VENT UP. 12 3" VENT UP. 13 INCOMING DOMESTIC WATER SERVICE, METERS AND BACKFLOW PREVENTERS, REFER TO DETAIL #H / P-601. 14 REFER TO DETAIL #Q / P-601. 15 SEWAGE EJECTOR PUMP AND BASIN (SE-1), REFER TO DETAIL # A / P-100U. 16 STORM WATER SUMP AND BASIN (SP-1), REFER TO DETAIL # B / P-100U.. 17 SEWAGE EJECTOR CONTROL PANEL. 18 STORM PUMP PUMP CONTROL PANEL. 19 3/4" FROM ABOVE AND DROP TO HB-1. 20 2" VENT FROM BELOW FLOOR. 21 1"CW FROM ABOVE. 22 1"CW DROP TO HB-1 AND BFP-3. 23 REFER TO MECH SHEETS FOR CONTINUATION. 24 1"G (2 PSI) FROM ABOVE. 25 INCOMING GAS SERVICE. 26 1"G (2 PSI) DROP, PROVIDE GAS PRESSURE REGULATOR VALVE, 2 PSI TO 11" W.C. WITH 399 MBH LOAD. PART OF BID PACKAGE #1 -UNDER SLAB STORM PIPING, SANITARY WASTE PIPING, UNDER SLAB AND FOUNDATION DRAINS. -GARAGE DRAINS, FLOOR DRAINS, TRENCH DRAINS. -STORM SUMP BASIN, SANITARY SEWAGE EJECTOR BASIN. -PIPE SLEEVES THROUGH CONCRETE FOUNDATIONS, GARAGE AND PODIUM STRUCTURE.