Loading...
HomeMy WebLinkAboutP-103 - 3RD FLOOR PLUMBING PLANSEE 1/ P-301 FOR ENLARGED UNIT PLANSEE 3/ P-301 FOR ENLARGED UNIT PLAN SEE 2/ P-302 FOR ENLARGED UNIT PLAN SEE 4/ P-301 FOR ENLARGED UNIT PLAN SEE 1/ P-302 FOR ENLARGED UNIT PLAN SEE 4/ P-302 FOR ENLARGED UNIT PLAN SEE 4/ P-302 FOR ENLARGED UNIT PLAN SEE 3/ P-301 FOR ENLARGED UNIT PLAN 1 1 1 1 1 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 4 4"DD-1 4"DD-1 2 SEE 3/ P-302 FOR ENLARGED UNIT PLAN 2 SEE 2/ P-301 FOR ENLARGED UNIT PLAN 4 4 4 5 5 4 4 4 4 6 7 MB-1 GENERAL PLUMBING NOTES: A. REFERENCE SHEET M-000 FOR PLUMBING SYMBOLS, LEGENDS AND ABBREVIATIONS AND ADDITIONAL GENERAL NOTES. 11700201 No. STATE OFJOSEPHR.BO L Y ARDPROFES S IONA L E N G INEERDATE SIGNED 08/31/21 R E G I S T ER E D I ND I A N A 18166 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS GRJK800 West Monon Green Blvd.P-103 3RD FLOOR PLUMBING PLAN 08/31/202108/31/2021 1/8" = 1'-0" 3RD FLOOR PLUMBING PLAN1 N 0 16'8'4' SHEET PLAN NOTES 1 6"ST UP AND DOWN. 2 4" WASTE AND 4" VENT STACK. 3 3"ST DOWN IN WALL. 4 1 1/2"CW FROM BELOW FLOOR SLAB IN WALL. 1 1/4"CW UP. 5 1 1/2"CW FROM BELOW FLOOR SLAB IN WALL. 1 1/2"CW UP. 6 3/4"CW & 3/4"HW UP AND DOWN. 3"W W/ P-TRAP UP TO MOP BASIN. 7 3" WASTE/VENT STACK.