HomeMy WebLinkAboutP-103 - 3RD FLOOR PLUMBING PLANSEE 1/ P-301 FOR
ENLARGED UNIT PLANSEE 3/ P-301 FOR
ENLARGED UNIT PLAN
SEE 2/ P-302 FOR
ENLARGED UNIT PLAN
SEE 4/ P-301 FOR
ENLARGED UNIT PLAN
SEE 1/ P-302 FOR
ENLARGED UNIT PLAN
SEE 4/ P-302 FOR
ENLARGED UNIT PLAN
SEE 4/ P-302 FOR
ENLARGED UNIT PLAN
SEE 3/ P-301 FOR
ENLARGED UNIT PLAN
1
1
1
1
1
2
2
2
2
2
2
2
2
3
3
3
3
3
3
3
3
4
4"DD-1
4"DD-1
2
SEE 3/ P-302 FOR
ENLARGED UNIT PLAN
2
SEE 2/ P-301 FOR
ENLARGED UNIT PLAN
4
4
4
5
5
4
4
4
4
6
7
MB-1
GENERAL PLUMBING NOTES:
A. REFERENCE SHEET M-000 FOR PLUMBING SYMBOLS, LEGENDS AND
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
11700201
No.
STATE OFJOSEPHR.BO
L
Y
ARDPROFES
S
IONA L E N G INEERDATE SIGNED 08/31/21
R E G I S T ER
E
D
I
ND I A N A
18166
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS
GRJK800 West Monon Green Blvd.P-103
3RD FLOOR PLUMBING
PLAN
08/31/202108/31/2021
1/8" = 1'-0"
3RD FLOOR PLUMBING PLAN1
N
0 16'8'4'
SHEET PLAN NOTES
1 6"ST UP AND DOWN.
2 4" WASTE AND 4" VENT STACK.
3 3"ST DOWN IN WALL.
4 1 1/2"CW FROM BELOW FLOOR SLAB IN WALL. 1 1/4"CW UP.
5 1 1/2"CW FROM BELOW FLOOR SLAB IN WALL. 1 1/2"CW UP.
6 3/4"CW & 3/4"HW UP AND DOWN. 3"W W/ P-TRAP UP TO MOP BASIN.
7 3" WASTE/VENT STACK.