Loading...
HomeMy WebLinkAboutA001NO SCALEGENERAL NOTES A001 # # SHT-NO # SHT-NO FIN CLG HGT GRAPHIC SYMBOLS WORK POINT, CONTROL POINT, OR DATUM POINT GRID LINES SECTION SHEET WHERE DRAWN DETAIL NUMBER SHEET WHERE DRAWN ROOM NAME ROOM NUMBER PLAN NOTE INDIANA NORTH ARROW DESCRIPTIONSYMBOL CENTER LINE DIM COLUMN CENTERLINES DOOR JAMB (HINGE SIDE, TYPICAL, UNLESS NOTED OTHERWISE) 6" GWB TO CONTINUE UNINTERRUPTED ACROSS VARIOUS SUBSTRATES AND PARTITION TYPES, UNLESS NOTED OTHERWISE SHEET WHERE DRAWN INTERIOR ELEVATION A 1 ABBREVIATIONS ROOM 207 # DOOR SEE DOOR SCHEDULE A/C AIR CONDITIONING AC ACOUSTICAL ADA AMERICANS WITH DISABILITIES ACT ADJ ADJACENT AFF ABOVE FINISHED FLOOR ALUM ALUMINUM ARCH ARCHITECTURAL AVG AVERAGE BLDG BUILDING BM BEAM / BENCHMARK B.O. BOTTOM OF BSMT BASEMENT BUR BUILT UP ROOF BW BOTTOM OF WALL CAB CABINET CIP CAST IN PLACE CJ CONTROL JOINT CL CENTERLINE CLG CEILING CLOS CLOSET CLR CLEAR CMT CERAMIC MOSAIC TILE CMU CONCRETE MASONRY UNIT CO CLEAN OUT COL COLUMN COMM COMMUNICATION CONC CONCRETE CONF CONFERENCE CONST CONSTRUCTION CONT CONTINUOUS CONTR CONTRACTOR CPT CARPET COORD COORDINATE CORR CORRIDOR CPT CARPET CT CERAMIC TILE CTR CENTER CWT CERAMIC WALL TILE DBL DOUBLE DEMO DEMOLITION DET / DTL DETAIL DIA DIAMETER DIAG DIAGONAL DIM(S) DIMENSION(S) DIV DIVISION / DIVIDED DN DOWN DPM DAMP PROOF MEMBRANE DS DOWNSPOUT DWG DRAWING DWR DRAWER E EAST EA EACH EJ EXPANSION JOINT ELEC ELECTRICAL ELEV ELEVATOR / ELEVATION EO EDGE OF EPDM ETHYLENE PROPYLENE DIENE TERPOLYMER MEMBRANE EPS EXTRUDED POLYSTYRENE EQ EQUAL EQUIP EQUIPMENT EX / EXIST EXISTING EXP EXPANSION / EXPOSED EXT EXTERIOR EWC ELECTRIC WATER COOLER FA FIRE ALARM FD FLOOR DRAIN FDN FOUNDATION FEC FIRE EXTINGUISHER CABINET FIN FINISH FLR FLOOR FOF FACE OF FINISH FOS FACE OF STUD FP FIRE PROTECTION / FIREPROOFING FT FOOT / FEET FTG FOOTING FTR FIRE TREATED GA GAUGE GALV GALVANIZED GC GENERAL CONTRACTOR GCMU GLAZED CONCRETE MASONRY UNIT GFRG GLASS FIBER REINFORCED GYPSUM GL GLASS / GLAZING GWB GYPSUM WALL BOARD HC HOLLOW CORE HDWE HARDWARE HM HOLLOW METAL HORIZ HORIZONTAL HP HIGH POINT HR HOUR HT HEIGHT HVAC HEATING / VENTILATING / AIR CONDITIONING HWH HOT WATER HEATER ID INSIDE DIAMETER IG INSULATED GLASS INCL INCLUDE(D,ING) INSUL INSULATION INT INTERIOR JAN JANITOR JT JOINT KIT KITCHEN LAM LAMINATE LAV LAVATORY LH LEFT HAND LIN LINOLEUM LOC LIMIT OF CONTRACT LP LOW POINT LTG LIGHTING MAX MAXIMUM MDF MEDIUM DENSITY FIBERBOARD MECH MECHANICAL MFG MANUFACTURING MFR MANUFACTURER MGR MANAGER MIN MINIMUM MISC MISCELLANEOUS MO MASONRY OPENING MTD MOUNTED MTL METAL N NORTH NAT NATURAL NIC NOT IN CONTRACT NO NUMBER NOM NOMINAL NR NOT RATED NRC NOISE REDUCTION COEFFICIENT NTS NOT TO SCALE O/ OVER OC ON CENTER OD OUTSIDE DIAMETER OH OVERHEAD OPH OPPOSITE HAND OPNG OPENING OPP OPPOSITE ORD OVERFLOW ROOF DRAIN OSB ORIENTED STRAND BOARD PC PIECE / PERSONAL COMPUTER PERF PERFORATED PL PLATE PLAM PLASTIC LAMINATE PLAS PLASTER PLYWD PLYWOOD PR PAIR PREFAB PREFABRICATED PRES PRESIDENT PRTD / PTRD PRESSURE TREATED PT PAINT PTD PAINTED QTY QUANTITY QTILE QUARRY TILE R RADIUS / RISER RCP REFLECTED CEILING PLAN RD ROOF DRAIN REC RECESSED REF REFERENCE REFRIG REFRIGERATOR REINF REINFORCE(D, ING) REQD REQUIRED REV REVISION RH RIGHT HAND RM ROOM RO ROUGH OPENING RR RESTROOM RWC RAIN WATER CONDUCTOR S SOUTH SCHED SCHEDULE SDT STATIC DISSIPATIVE TILE SECT SECTION SECY SECRETARY SHT SHEET SIC SOUND ISOLATION CEILING SIM SIMILAR SPEC SPECIFIED / SPECIFICATION SQ SQUARE SQ FT SQUARE FEET SSM SOLID SURFACE MATERIAL SS STAINLESS STEEL STC SOUND TRANSMISSION CLASS STD STANDARD STL STEEL STN STONE STOR STORAGE STR STAIR STRUCT STRUCTURAL SY SQUARE YARD T TREAD T&G TONGUE AND GROOVE T/O THROUGHOUT TELE TELEPHONE TEMP TEMPORARY TERR TERRAZZO THRES THRESHOLD T.O. TOP OF TRANSP TRANSPARENT TRCT TERRACOTTA TILE TW TOP OF WALL TYP TYPICAL UNO UNLESS NOTED OTHERWISE VCT VINYL COMPOSITION TILE VERT VERTICAL VEST VESTIBULE VIF VERIFY IN FIELD VP VICE PRESIDENT VWC VINYL WALLCOVERING W WEST W/ WITH WC WATERCLOSET WD WOOD WDW WINDOW W/O WITHOUT WP WATERPROOF WT WEIGHT WWF WELDED WIRE FABRIC MISCELLANEOUS ITEMS WT# # SHT-NO GLASS/WINDOW TYPE WALLTYPE SEE WALLTYPES REVISION# FLRRFLRL FLOOR FINISH DESIGNATION SUBSTRATE/FINISH CEILING HEIGHT A.F.F. N S W E 101 Certified By:Scale:Date:Checked By:Drawn By:Revisions: Job Number: Drawing Number: Drawing Name:08/20/2021www.phanomen.com 934 Fort Wayne Ave. - Indianapolis, IN 46202317.439.4355 (t)...creating profitable environments...BR/ LEPERMIT SET 08.20.2021 AMMSOCIAL CANTINATHE RAILYARD AT MIDTOWN350 MONON BLVD., SUITE 10 CARMEL, IN 46032GENERAL NOTES: A. UNLESS OTHERWISE INDICATED, GENERAL NOTES APPLY TO ALL WORK AND ALL DRAWINGS IN THIS SET AND SHALL EXTEND TO ANY CHANGES, EXTRAS OR ADDITIONS AS AGREED TO DURING THE COURSE OF THE WORK. B. THESE DRAWINGS AND COPIES THEREOF ARE LEGAL INSTRUMENTS OF SERVICE FOR USE OF THE OWNER ONLY. C. THIS PROJECT IS DESIGNED AND DOCUMENTED PER THE DESIGNER'S INTERPRETATION OF THE CODE REQUIREMENTS.  VARIOUS GOVERNING AGENCIES SOMETIMES INTERPRET CODES, LAWS AND ORDINANCES DIFFERENTLY.  THESE AGENCIES HAVE JURISDICTION TO REQUIRE CHANGES IN DESIGN AND CONSTRUCTION.  ANY CHANGES OR MODIFICATIONS TO THE DESIGN MAY NECESSITATE PRICE ADJUSTMENTS. D. ALL WORK IS TO BE COMPLETED IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, ORDINANCES, RULES, REGULATIONS, AND STANDARDS, INCLUDING, BUT NOT LIMITED TO: THE INDIANA BUILDING CODE, THE INDIANA CODES, THE INDIANA FIRE CODES, THE AMERICANS WITH DISABILITIES ACT (ADA), UNIVERSAL BUILDING CODE, AND APPLICABLE TRADE STANDARDS. ALL APPLICABLE RULES AND REGULATIONS ARE TO BE THE MOST CURRENT ADOPTED EDITIONS. E. THE ERRORS AND OMISSIONS DESIGN LIABILITY FOR THE PROJECT SHALL BE LIMITED TO THE DESIGN COST OF CORRECTING THE DEFICIENCY. F. CONTRACTOR SHALL VISIT AND INSPECT THE PROJECT SITE PRIOR TO SUBMITTAL OF BID AND FAMILIARIZE THEMSELVES WITH THE CONDITIONS UNDER WHICH THE WORK WILL BE PERFORMED. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL CONDITIONS AND DIMENSIONS PRIOR TO THE START OF WORK. REPORT ANY DISCREPANCIES TO THE DESIGNER IMMEDIATELY. FAILURE OF CONTRACTOR TO PERFORM IN THIS MANNER DOES NOT ALLOW FOR ADDITIONAL COST TO THE OWNER. NO SUBSEQUENT EXTRAS OR ADDITIONS WILL BE ALLOWED ON ANY CLAIM OF LACK OF KNOWLEDGE OF CONDITIONS OR CIRCUMSTANCES ABOUT WHICH THE CONTRACTOR COULD HAVE INFORMED THEMSELVES. G. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL STATE AND LOCAL PERMITS REQUIRED FOR COMPLETION OF THIS PROJECT. H. ALL WORK IS TO BE COORDINATED BY THE GENERAL CONTRACTOR TO ASSURE ADEQUATE FIT, FINISH, SYSTEM OPERATION, AND FULL COMPLETION OF THE WORK, INCLUDING SERVICE REQUIREMENTS OF THE OWNER'S F.F.E. I. CONTRACTOR SHALL MAKE KNOWN ANY LIMITATIONS, EXCLUSIONS, OR MODIFICATIONS TO THE PROJECT DURING THE PRICING PHASE OF THE PROJECT. UNLESS NOTED ALL WORK SHOWN ON THE DRAWINGS WILL BE PRESUMED TO BE INCLUDED. J. ALL CONTRACTORS INVOLVED IN THIS WORK SHALL CARRY PROPERTY DAMAGE AND PUBLIC LIABILITY INSURANCE AS REQUIRED BY OWNER & GOVERNMENTAL AGENCIES HAVING JURISDICTION AND COMPLY WITH STATUTORY REQUIREMENTS FOR DISABILITY AND WORKMEN'S COMPENSATION. THEY WILL COMPLY WITH ALL RULES AND REGULATIONS DICTATED BY THE OWNER AND THE CONDITIONS OF THE JOB. INSURANCE SHALL PROTECT THE OWNER, THE TENANT, ARCHITECT AND OTHER GROUP(S) TO BE NAMED FROM LIABILITY TO THE CONTRACTOR'S NEGLIGENCE. K. THE AIA STANDARD DOCUMENT A201 SHALL BE MADE PART OF THE GENERAL CONDITIONS. L. ALL DIMENSIONS ARE SHOWN ON THE DRAWINGS. DIMENSIONS SHALL GOVERN. DETAILS SHALL GOVERN OVER PLANS AND ELEVATIONS; LARGE SCALE DETAILS GOVERN OVER SMALL SCALE DETAILS. ANY DIMENSIONS NOT SHOWN OR DEEMED QUESTIONABLE ARE TO BE VERIFIED WITH THE DESIGNER. DO NOT SCALE DIMENSIONS ON THE DRAWINGS. ALL DIMENSIONS ARE TO THE FACE OF GYPSUM BOARD, BACKER BOARD, MASONRY/CONCRETE WALLS, OR CENTERLINE OF COLUMNS UNLESS NOTED OTHERWISE. M. THERE SHALL BE NO SUBSTITUTION OF MATERIALS WHERE A MANUFACTURER IS SPECIFIED. N. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISTRIBUTION OF DRAWINGS TO ALL TRADES UNDER THEIR EMPLOY. O. THE GENERAL CONTRACTOR SHALL SUPPLY, PRIOR TO THE COMMENCEMENT OF WORK, A LIST OF ALL SUBCONTRACTORS TO ARCHITECT. THE NAME OF THE PRINCIPAL CONTACT, THE ADDRESS AND PHONE NUMBER OF EACH SUBCONTRACTOR SHALL BE INCLUDED ON THE LIST. P. THE GENERAL CONTRACTOR SHALL FURNISH SAMPLES TO ARCHITECT/INTERIOR DESIGNER OF ALL MATERIALS, TOGETHER WITH FINISHES, INTENDED FOR USE IN THE WORK BEFORE THE COMMENCEMENT/ ORDER OF THE SPECIFIED WORK. Q. ANY INFORMATION REQUIRED BY CONTRACTORS THAT IS NOT SHOWN ON THE DRAWINGS OR CONTAINED IN OTHER CONTRACT DOCUMENTS SHALL BE REQUESTED BY THE GENERAL CONTRACTOR FROM ARCHITECT/INTERIOR DESIGNER. R. A REPRESENTATIVE OF THE GENERAL CONTRACTOR AUTHORIZED TO DISCUSS THE WORK AND RECEIVE INFORMATION FROM ARCHITECT SHALL BE AVAILABLE AT ALL TIMES THAT WORK IS IN PROGRESS. S. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND CUT SHEETS TO ARCHITECT/INTERIOR DESIGNER FOR APPROVAL ON ALL ITEMS INCLUDING BUT NOT LIMITED TO MILLWORK, LIGHTING, FINISH MATERIALS, PLUMBING FIXTURES AND ACCESSORIES PRIOR TO ORDER. SHOP DRAWINGS SHALL SHOW ALL DIMENSIONS AND CONDITIONS. T. CONTRACTOR IS TO SIGN EACH SHOP DRAWING SUBMITTAL CERTIFYING THAT THE SUBMITTAL HAS BEEN REVIEWED, APPROVED, AND THAT THE CONTRACTOR COORDINATION HAS BEEN PERFORMED. U. ALL CONTRACTORS INVOLVED IN THIS PROJECT SHALL REVIEW ALL DRAWINGS INCLUDED IN THIS DRAWING SET AND SHALL COORDINATE THEIR WORK WITH OTHER TRADES ON THIS PROJECT. V. FINISHED DOOR OPENINGS IN NEW PARTITIONS SHALL BE SET 6" FROM ADJACENT PERPENDICULAR PARTITIONS, UNLESS NOTED OTHERWISE. W. PROVIDE BLOCKING IN WALLS TO ACCOMMODATE ALL CASEWORK AND WALL MOUNTED EQUIPMENT. ALL BLOCKING MUST MEET ALL APPLICABLE FIRE CODES. X. ALL FINISH CARPENTRY IS TO BE COMPLETED IN STRICT ACCORDANCE WITH A.W.I. STANDARDS, PREMIUM GRADE. Y. ALL FIRE EXTINGUISHER CABINET LOCATIONS ARE TO BE COORDINATED BY THE FACILITY WITH THE LOCAL FIRE OFFICIALS PRIOR TO INSTALLATION. COORDINATE FINAL FIRE EXTINGUISHER LOCATIONS WITH PHANOMEN/design PRIOR TO ROUGH-IN. STYLE TO BE SEMI-RECESSED, HINGED DOOR WITH GLASS. SUBMIT CUT-SHEET TO PHANOMEN/design FOR APPROVAL. Z. CONTRACTOR(S) SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, AND EQUIPMENT FOR THE WORK IN THESE DOCUMENTS, UNLESS CLEARLY NOTED "NOT IN CONTRACT" (N.I.C.). EXISTING WORK ADJACENT TO OR IN THE AREA OF NEW WORK SHALL BE PROTECTED BY ALL SUITABLE MEANS NECESSARY TO PREVENT OR MINIMIZE DAMAGE. GREAT CARE SHALL BE EXERCISED TO ASSURE THAT THE BUILDING SHALL BE PROTECTED FROM DAMAGE THAT COULD OCCUR BECAUSE OF THIS WORK. ANY DAMAGES CAUSED BY THIS WORK OR ACCIDENTS SHALL BE REPAIRED, REPLACED OR PATCHED TO THE SATISFACTION OF ARCHITECT AND THE OWNER. CONTRACTORS SHALL BEAR FINANCIAL RESPONSIBILITY FOR SUCH DAMAGE AND ANY WORK UNDERTAKEN TO CORRECT IT. AA. THE CONTRACTORS SHALL EXERCISE GREAT CARE IN PROTECTION FROM DAMAGE ALL MATERIALS EXISTING ON THE JOB AND SHALL MAINTAIN PROTECTION FOR ALL TRAFFIC AREAS OF THE BUILDING TO BE USED DURING THE EXECUTION OF WORK RELATING TO THIS CONTRACT WITH THE UNDERSTANDING THAT THE CONTRACTOR'S WILL RECTIFY ANY DAMAGE ATTRIBUTABLE TO THEIR OPERATION. AB. CONTRACTORS SHALL KEEP WORK AREAS AND ADJACENT PUBLIC CORRIDORS AND FACILITIES FREE OF DEBRIS. MATERIALS STORED ON SITE ARE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE STORED IN A LOCATION APPROVED BY THE OWNER. AC. ALL PLUMBING ITEMS AND/OR EQUIPMENT ITEMS ARE TO BE COORDINATED AND VERIFIED WITH INTERIOR ELEVATIONS PRIOR TO ROUGH-IN. ANY DISCREPANCIES SHALL BE COORDINATED WITH PHANOMEN/design. AD. GYPSUM BOARD SURFACES SHALL BE ISOLATED WITH CONTROL JOINTS AS PER MANUFACTURERS REQUIREMENTS AND INDUSTRY STANDARDS. AE. ALL GYPSUM BOARD SURFACES ARE TO BE FINISHED SMOOTH. GYPSUM ASSOCIATION GA-214-96 LEVEL 4 FINISH, WITH THE FOLLOWING ADDITION; ANY READILY VISIBLE IMPERFECTIONS IN GYPSUM BOARD SURFACE SHALL BE COATED WITH JOINT COMPOUND AND/OR SKIM-COATED AS REQUIRED. AF. SCRIBE GYPSUM BOARD OF WALL AND PARTITIONS TO IRREGULARITIES OF DECK ABOVE. SEAL TIGHTLY AROUND ANY PARTITIONS. AG.EACH TRADE SHALL BE HELD RESPONSIBLE FOR KNOWLEDGE OF THE GENERAL NOTES INCLUDED THROUGHOUT THE CONTRACT DOCUMENTS AND THE APPLICABLE BUILDING CODES. AH. THE HVAC, PLUMBING AND ELECTRICAL DRAWINGS ARE SUPPLEMENTARY TO THE ARCHITECTURAL DRAWINGS. SHOULD THERE BE ANY DISCREPANCY BETWEEN THE VARIOUS DRAWINGS, IT SHALL BE BROUGHT TO THE DESIGNER AND ENGINEERS ATTENTION FOR CLARIFICATION. AI. CONTRACTOR MUST VERIFY AND COORDINATE ALL OPERATIONAL REQUIREMENTS AND CLEARANCE DIMENSIONS OF PROJECT COMPONENTS; INCLUDING CONTRACTOR SUPPLIED AND OWNER SUPPLIED ITEMS. AJ. CONTRACTOR SHALL ITEMIZE ALL COSTS AND SCOPE OF WORK REGARDING ANY CHANGE ORDER. THIS INFORMATION MUST BE PRESENTED TO THE OWNER FOR APPROVAL PRIOR TO ANY WORK BEING EXECUTED. AK. ALL LIGHT FIXTURES THAT COME INTO CONTACT WITH BUILDING INSULATION MUST BE IC RATED. ALL LIGHT FIXTURES SHALL MEET ALL APPLICABLE CODES FROM NATIONAL ELECTRIC CODE (NEC) TO THE INTERNATIONAL ENERGY CODE (IEC). CONTRACTOR IS TO VERIFY CODE COMPLIANCE OF ALL LIGHT FIXTURES. AL. METAL STUD CONTRACTOR IS RESPONSIBLE FOR GAUGING AND RELATED ENGINEERING OF METAL STUD FRAMED WALLS UNLESS NOTED OTHERWISE ON ENGINEERING DRAWINGS. AM.THESE PLANS ARE INTENDED FOR "GUIDELINE" BID AND CONSTRUCTION PURPOSES ONLY AND DO NOT INCLUDE DETAILS AND METHODS OF CONSTRUCTION FOR ALL AREAS. SUBSTITUTIONS OF MATERIALS AND METHODS MAY BE PROVIDED, UPON APPROVAL OF OWNER AND DESIGNER. AN. THE PROJECT TEAM, AS LISTED, CANNOT GUARANTEE AGAINST HUMAN ERROR, OMISSIONS OR INACCURACIES CONTAINED WITHIN THESE DOCUMENTS. GENERAL CONTRACTOR IS RESPONSIBLE FOR COMMUNICATING ALL QUESTIONS AND CONCERNS TO THE PROJECT TEAM TO SEEK CLARIFICATION AND/OR SOLUTIONS PRIOR TO THE COMMENCEMENT OF THE SPECIFIED WORK. AO.ALL CONTRACTORS AND SUPPLIERS SHALL BEFORE COMMENCING WORK, REVIEW ALL PLANS AND SPECIFICATIONS AND VERIFY ALL DIMENSIONS AND DETAILS FOR THEIR WORK AND REPORT ANY DISCREPANCIES OR VARIATIONS TO THE DESIGNER PRIOR TO FINAL BID, ORDER/FABRICATION, CONSTRUCTION AND INSTALLATION OF ANY MATERIAL. THE GENERAL CONTRACTOR SHALL EXAMINE ALL ADJOINING WORK OR AREAS UPON WHICH THE PERFORMANCE OF THEIR WORK IS IN ANY WAY DEPENDENT. AP. ALL MATERIALS SHALL BE NEW, UNUSED, AND OF THE HIGHEST QUALITY IN EVERY RESPECT UNLESS OTHERWISE NOTED. MANUFACTURED MATERIALS AND EQUIPMENT SHALL BE INSTALLED AS PER THE MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS UNLESS OTHERWISE NOTED. AQ.ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE AND TRUE, AND IN PROPER ALIGNMENT. AR. SEE COVER SHEET GENERAL NOTES FOR CODE COMPLIANCE. AS. THE GENERAL CONTRACTOR SHALL KEEP SUFFICIENT WORKMEN ON THE JOB SITE AT ALL TIMES TO PERFORM THE WORK IN THE MOST EXPEDITIOUS MANNER CONSISTENT WITH GOOD WORKMANSHIP, GOOD BUSINESS PRACTICE AND THE BEST INTERESTS OF THE OWNER. AT. EACH TRADE WILL BE EXPECTED TO PROCEED IN A FASHION THAT WILL NOT DELAY OR DETAIN THE TRADES FOLLOWING THEM. AU. THE CONTRACTORS SHALL NOT PROCEED WITH ANY ADDITIONAL WORK OR CHANGES FOR WHICH THEY EXPECT ADDITIONAL COMPENSATION BEYOND THE CONTRACT AMOUNT WITHOUT WRITTEN AUTHORIZATION FROM OWNER. FAILURE TO OBTAIN SUCH AUTHORIZATION SHALL INVALIDATE ANY CLAIM FOR EXTRA COMPENSATION. AV. ALL WORK AND MATERIALS SHALL BE GUARANTEED AGAINST DEFECTS IN DESIGN, WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) YEAR. AW.THE CONTRACTORS SHALL AT ALL TIMES KEEP THE PREMISES FREE OF THE ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY THEIR OPERATIONS. THE CONTRACTORS SHALL CONFINE THEIR OPERATIONS FOR REMOVAL TO SUCH METHODS AS MAY BE AGREEABLE WITH THE OWNER. THE PROJECT SHALL BE LEFT CLEAN AND CLEAR, TO THE SATISFACTION OF THE OWNER, AND THE DISPOSITION OF ALL SALVAGED MATERIALS IS TO BE CLEARED WITH THE OWNER PRIOR TO REMOVAL. THE PREMISES SHALL BE SWEPT CLEAN DAILY OF RELATED CONSTRUCTION DEBRIS. AX. UPON SUBSTANTIAL COMPLETION OF THE WORK, THE GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT TO SCHEDULE A "PUNCH LIST" WALK THROUGH IT IS INTENDED THAT THE GENERAL CONTRACTOR PROVIDE A COMPLETE JOB AND ANY OMISSIONS IN THESE NOTES OR IN THE OUTLINE OF WORK SHALL NOT BE CONSTRUED AS RELIEVING THE GENERAL CONTRACTOR OF SUCH RESPONSIBILITIES IMPLIED BY THE SCOPE OF WORK EXCEPT FOR ITEMS SPECIFICALLY NOTED. AY. SHOULD ANY PORTION OF THE CONTRACT DOCUMENTS PROVE TO BE, FOR WHATEVER REASON, UNENFORCEABLE, SUCH UNENFORCEABILITY SHALL NOT EXTEND TO THE REMAINDER OF THE CONTRACT NOR SHALL IT VOID ANY OTHER PROVISIONS OF THE CONTRACT. AZ. THE GENERAL CONTRACTOR SHALL HAVE A COPY OF THE LATEST SET OF CONTRACT DOCUMENTS ON THE JOB SITE AT ALL TIMES FOR REVIEW BY ARCHITECT. ALL DRAWINGS AND CONSTRUCTION NOTES ARE COMPLIMENTARY AND WHAT IS CALLED FOR BY ONE SHALL BE BINDING AS IF CALLED FOR BY ALL. BA. COMPLETE RECORD DOCUMENTS TO BE MAINTAINED SEPARATELY FROM THE FIELD SET. THE RECORD SET SHALL HAVE ALL FIELD CHANGES DOCUMENTED AND WILL BE PROVIDED TO ARCHITECT AT THE COMPLETION OF PROJECT. PROVIDE A COPY OF THE RECORD DOCUMENTS TO THE LANDLORD. BB. THE WORK INCLUDES THE FURNISHING OF ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR, AND REASONABLY INCIDENTAL TO, THE COMPLETION IN PLACE OF ALL WORK ILLUSTRATED AND DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS. ALL SUCH WORK IS TO BE DONE BY THE CONTRACTORS UNLESS OTHERWISE NOTED. BC. THE GENERAL CONTRACTOR SHALL SUBMIT CONFIRMATIONS WITH DELIVERY DATES OF ORDERS FOR MATERIALS AND EQUIPMENT ON ANY LONG LEAD-TIME ITEMS AT THE COMMENCEMENT OF PROJECT. BD. CONTRACTOR TO INCLUDE PRICING FOR HOOD DUCT DRAWING THROUGH THE CHOSEN HOOD CONTRACTOR, UNLESS OTHERWISE DISCUSSED. BE. SIGNAGE REQUIRES SEPARATE REVIEW, PERMITS, AND FEES. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING SUCH PERMITS, UNLESS OTHERWISE DISCUSSED. OWNER SHALL SUBMIT BUILDING SIGNAGAE TO CITY FOR APPROVAL PRIOR TO INSTALLATION. BF. FIRE SPRINKLER AND FIRE ALARM SYSTEMS SHALL BE PROVIDED PER NFPA NO.13. APPROVALS TO BE OBTAINED FROM LOCAL FIRE MARSHAL. CONTRACTOR TO SUBMIT ALL REQUIRED DRAWINGS AND INFORMATION TO FIRE MARSHAL AND AUTHORITY FOR APPROVAL PRIOR TO COMMENCEMENT OF ANY RELATED WORK. OBTAIN APPROVAL OF COMPLETED SYSTEMS PRIOR TO FINAL ACCEPTANCE. 09/23/21