Loading...
HomeMy WebLinkAbout5-Taco Bell - 08.06.2021 - P2.0 Waste-Vent PlanWASTE & VENT PLAN 1/4"=1'-0" A WASTE & VENT PLAN NOTES CWATER HEATER CONDENSATE DETAIL E KEY NOTES B A B C D E F 12 11 10 9 8 7 6 5 4 3 2 1 YMF0121"MAX.HUB DRAIN/FLOOR SINK NOT TO EXCEED 1" A.F.F. 3" PVC EXHAUST DUCT 1/2" VINYL OR PVC CONDENSATE DRAIN. MUST INCLUDE LOOP AIR TRAP. 1/4"/ FT MIN. SLOPE 6"WATER HEATER 90° ELBOW WITH TAP PROVIDED BY MANUFACTURER WATER HEATER PLATFORM TOP OF LOOP MUST BE BELOW BOTTOM OF EXHAUST ELBOW. NOT USED D 9 8 7 6 5 4 3 2 1A. B. C. D. E. F. G. H. I. J. NO ROOF PENETRATIONS PERMITTED WITHIN ROOF WATER PLY. REFER TO ROOF PLAN FOR LOCATIONS. REFER TO RISER DIAGRAM ON SHEET P5.0 FOR ALL WASTE AND VENT SIZES. STORM WATER PIPING IS SIZED FOR A RAINFALL OF 4" PER HOUR. ADJUST ROOF DRAIN (RD-1) SIZE AND STORM PIPE SIZES PER THE LOCAL RAINFALL REQUIREMENTS AND BY THE AUTHORITY HAVING JURISDICTION. PIPE SHALL DISCHARGE OVER DRIVE-THRU ROADWAY CURB OR AS DIRECTED BY THE AUTHORITY HAVING JURISDICTION. INSULATE ALL HORIZONTAL RUNS OF STORM DRAINAGE PIPING ABOVE THE CEILING OR EXPOSED WITH 1" CLOSED CELLULAR INSULATION WITH VAPOR BARRIER JACKET THAT CAN BE PAINTED. 4" SECONDARY DRAIN OUTLET SHALL EXTEND 2" BEYOND FINISHED WALL. SEE ARCHITECTURAL DRAWING A4.0 FOR INSTALLATION PROCEDURE AND A4.1 FOR EXACT LOCATION OF DRAIN OUTLET. COORDINATE LOCATION OF STORM WATER PIPING ABOVE CEILING WITH ALL TRADES PRIOR TO INSTALLATION. SEE ARCHITECTURAL PLANS FOR DOWNSPOUT LOCATIONS VERIFY WITH THE LOCAL BUILDING AUTHORITY THAT CONDENSATE DRAINAGE CAN BE ROUTED TO THE MOP SINK. GREASE INTERCEPTOR AND SAMPLE WELL TO BE VACUUM TESTED. VERIFY LOCATION OF ALL EXISTING SANITARY PIPING IN FIELD PRIOR TO WORK. REUSE WHEREVER POSSIBLE. UNDERGROUND SANITARY PIPE SHALL BE NO HUB CAST IRON PIPE FOR THE FIRST 10 FEET FROM CONNECTION TO FLOOR SINK FS-2, OUTWARD. REPLACE EXISTING FLOOR DRAIN WITH NEW HUB DRAIN. PROVIDE CONDENSATE LINE AND DRAIN LINE FROM ICE MACHINE TO NEW HUB DRAIN, PROVIDE AIR GAP PER LOCAL CODE. SEE P6.0 PROVIDE WASTE LINES FROM BEVERAGE UNIT TO HD / FS, PROVIDE AIR GAP PER LOCAL CODE. SEE P6.0 POINT OF CONNECTION TO EXISTING GREASE WASTE PIPING IN SPACE. VERIFY EXACT SIZE, LOCATION, AND INVERT IN FIELD PRIOR TO WORK. ROUTE TO CONNECT TO EXISTING VENT PIPING IN SPACE. VERIFY EXACT SIZE AND LOCATION IN FIELD PRIOR TO WORK. RUN DRAIN LINE FROM S/S DRINK MACHINE TO EXISTING HUB DRAIN BENEATH D/T DRINK MACHINE. SEE DETAIL P6.0 AS REFERENCE FOR INDIRECT WASTE PIPING. CONFIRM IF HUB DRAIN EXISTS, PROVIDE NEW FLOOR SINK AS REQUIRED. PIPE 3-COMPARTMENT SINK INDIRECTLY CONNECTED TO EXISTING HUB DRAIN BELOW. POINT OF CONNECTION TO EXISTING SANITARY PIPING IN SPACE. VERIFY EXACT SIZE, LOCATION, AND INVERT IN FIELD PRIOR TO WORK. ROUTE DRAIN FOR REVERSE OSMOSIS DISCHARGE TO FLOOR SINK. ENSURE PROPER AIR GAP. (E)FD (E)HUB DRAIN (E)HUB DRAIN (E)HUB DRAIN (E)SAN S-284 2 3 S-513 (E)FD (E)FD FS 2 1 5 S-546 S-285 S-547 S-544 6 7 (E)HAND SINK (E)HAND SINK (E)MOP SINK 5 8 4" 4" 4" 4" 4" 2"2" 2" 2" 2" 2" 2" WC 1 WC 1 FD 1FD 1 L 1L 1 9 (E)HUB DRAIN FS 1 S 4 4 S 3 3" 3" 5 10 REMOVE AND CAP EXISTING FIXTURE. PATCH AND REPAIR TO MATCH EXISTING. 10 10 11 REPLACE EXISTING GREASE TRAP WITH NEW 1000 GALLON GREASE INTERCEPTOR. SEE DETAILS ON SHEET P1.0 AND THIS SHEET FOR MORE INFORMATION. 11 SAMPLE STRUCTURE DETAIL 12 EXISTING SAMPLE WELL, REPLACE WITH NEW AS REQUIRED. SEE DETAIL THIS SHEET. 12 4 (E)FD 9853 N MICHIGAN RD. CARMEL, IN 46032 FDA-IN-01-21 08.06.2021PERMIT / BID: ISSUES AND REVISIONS: CHECKED BY: DRAWN BY: PROJECT NO.: ENDEAVOR - REMODEL 62 SEATS +/- / 3,011 +/- S.F. TACO BELL, CARMEL, IN A C H I T E C T S 2145 Ford Parkway, Suite 301 Saint Paul, Minnesota 55116 651.690.5525 www.finn-daniels.com Rebecca L. Olson, AIA #AR11500059 MISSOURI 796 Merus Court St. Louis, MO 63026 T 636.349.1600 F 636.349.1730 CERTIFICATE OF AUTHORITY NO. 201808201274213 08/06/2021 09.10.2021COMMENTS 09.22.2021COMMENTS P2.0 WASTE AND VENT PLAN JTJ DN 09/23/21